<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>OpenConstructionERP — News &amp; Releases</title>
    <link>https://openconstructionerp.com/news</link>
    <atom:link href="https://openconstructionerp.com/news/feed.xml" rel="self" type="application/rss+xml"/>
    <description>Release notes, product updates and engineering posts from the OpenConstructionERP team.</description>
    <language>en</language>
    <item>
      <title>v5.5.0 — Stability wave + full Japanese + 9-of-9 verified</title>
      <link>https://openconstructionerp.com/news/v5-5-0</link>
      <guid isPermaLink="true">https://openconstructionerp.com/news/v5-5-0</guid>
      <pubDate>Thu, 28 May 2026 00:00:00 +0000</pubDate>
      <description>Eight user-reported bugs fixed end-to-end, Japanese locale completed to 98.5%, six dependabot upgrades merged, and a sequential 9-of-9 PASS browser verification.</description>
    </item>
    <item>
      <title>v5.2.2 — /dashboard route + W10/W13/SAF-A3 + a11y bundle</title>
      <link>https://openconstructionerp.com/news/v5-2-2</link>
      <guid isPermaLink="true">https://openconstructionerp.com/news/v5-2-2</guid>
      <pubDate>Wed, 27 May 2026 00:00:00 +0000</pubDate>
      <description>Seven fixes across the dashboard route, takeoff render lifecycle, validation banner, change-order widget, OSHA fields and a11y backfill.</description>
    </item>
    <item>
      <title>v5.2.3 — Vector backend gate + .env.example clarity</title>
      <link>https://openconstructionerp.com/news/v5-2-3</link>
      <guid isPermaLink="true">https://openconstructionerp.com/news/v5-2-3</guid>
      <pubDate>Wed, 27 May 2026 00:00:00 +0000</pubDate>
      <description>Issue #162 vector-backend gate (Qdrant default no longer no-ops semantic search) and a rewritten .env.example with structured sections and accurate defaults.</description>
    </item>
    <item>
      <title>v5.2.5 — Install-crash fix</title>
      <link>https://openconstructionerp.com/news/v5-2-5</link>
      <guid isPermaLink="true">https://openconstructionerp.com/news/v5-2-5</guid>
      <pubDate>Wed, 27 May 2026 00:00:00 +0000</pubDate>
      <description>Fresh pip install works again. Plus dashboard route, deleteDiary helper, and a finance type fix.</description>
    </item>
    <item>
      <title>v5.2.6 — Demo login fix · WCAG-AA · Reporting · Rollup · JA</title>
      <link>https://openconstructionerp.com/news/v5-2-6</link>
      <guid isPermaLink="true">https://openconstructionerp.com/news/v5-2-6</guid>
      <pubDate>Wed, 27 May 2026 00:00:00 +0000</pubDate>
      <description>Five quality-of-life wins on top of v5.2.5. The documented demo password works, contrast clears AA, /reports renders, the dashboard stops fanning out, and Japanese covers 1197 more keys.</description>
    </item>
    <item>
      <title>v5.2.7 — Project-detail widget grid + one-click in-app upgrade</title>
      <link>https://openconstructionerp.com/news/v5-2-7</link>
      <guid isPermaLink="true">https://openconstructionerp.com/news/v5-2-7</guid>
      <pubDate>Wed, 27 May 2026 00:00:00 +0000</pubDate>
      <description>The project page lays out 13 widgets as a proper responsive grid, and the update checker can apply the upgrade itself — same interpreter, captured log, restart hint.</description>
    </item>
    <item>
      <title>v5.2.8 — /geo tabs reliability + /markups deep-link + /resources inline edit</title>
      <link>https://openconstructionerp.com/news/v5-2-8</link>
      <guid isPermaLink="true">https://openconstructionerp.com/news/v5-2-8</guid>
      <pubDate>Wed, 27 May 2026 00:00:00 +0000</pubDate>
      <description>Three first-touch fixes across the most-trafficked Geo, Markups and Resources pages — tabs that always navigate, deep links that land on the right measurement, inline edit instead of read-only rows.</description>
    </item>
    <item>
      <title>v5.3.0 — Geo Hub round 2 + Brazil invoices + login dark-mode + WCAG-AA</title>
      <link>https://openconstructionerp.com/news/v5-3-0</link>
      <guid isPermaLink="true">https://openconstructionerp.com/news/v5-3-0</guid>
      <pubDate>Wed, 27 May 2026 00:00:00 +0000</pubDate>
      <description>Six bundles deep — Geo Hub storage cleanup, Brazil Tier-1 invoice support, login dark-mode contrast, reporting renderer, daily-diary delete, and 51 files of WCAG-AA contrast work.</description>
    </item>
    <item>
      <title>v5.0.0 — The Deep-Coordination foundation.</title>
      <link>https://openconstructionerp.com/news/v5-0-0</link>
      <guid isPermaLink="true">https://openconstructionerp.com/news/v5-0-0</guid>
      <pubDate>Tue, 26 May 2026 00:00:00 +0000</pubDate>
      <description>Unified notifications dispatcher, canonical file versioning, universal audit trail. 116 modules.</description>
    </item>
    <item>
      <title>v5.1.0 — Wave 1 polish: TypeScript strict everywhere</title>
      <link>https://openconstructionerp.com/news/v5-1-0</link>
      <guid isPermaLink="true">https://openconstructionerp.com/news/v5-1-0</guid>
      <pubDate>Tue, 26 May 2026 00:00:00 +0000</pubDate>
      <description>TS-strict pass over the new dispatcher / versioning surface. 751 v1 file rows backfilled on the live demo.</description>
    </item>
    <item>
      <title>v5.2.0 — International BOQ</title>
      <link>https://openconstructionerp.com/news/v5-2-0</link>
      <guid isPermaLink="true">https://openconstructionerp.com/news/v5-2-0</guid>
      <pubDate>Tue, 26 May 2026 00:00:00 +0000</pubDate>
      <description>GAEB · BC3 · NRM · MasterFormat under one roof. The four formats that cover ~70% of the Tier-1 market.</description>
    </item>
    <item>
      <title>An open construction ERP for teams who want to own their stack</title>
      <link>https://openconstructionerp.com/news/open-erp-own-your-stack</link>
      <guid isPermaLink="true">https://openconstructionerp.com/news/open-erp-own-your-stack</guid>
      <pubDate>Mon, 25 May 2026 00:00:00 +0000</pubDate>
      <description>Estimating, CAD/BIM take-off, 4D/5D scheduling, procurement and site billing — in one self-hosted system under AGPL-3.0. Production-grade as of v5.2.0. 116 modules, 55,000+ cost items across 11 regions.</description>
    </item>
    <item>
      <title>v3.11.0 — Wave 3/4 modules + Validation@Import</title>
      <link>https://openconstructionerp.com/news/v3-11-0</link>
      <guid isPermaLink="true">https://openconstructionerp.com/news/v3-11-0</guid>
      <pubDate>Wed, 20 May 2026 00:00:00 +0000</pubDate>
      <description>Validation moves into the import pipeline, GAEB X84 writer ships, RVT diagnostics report appears.</description>
    </item>
    <item>
      <title>v4.0.0 — Stable Major. 103 modules, public API, multi-tenant security pass.</title>
      <link>https://openconstructionerp.com/news/v4-0-0</link>
      <guid isPermaLink="true">https://openconstructionerp.com/news/v4-0-0</guid>
      <pubDate>Wed, 20 May 2026 00:00:00 +0000</pubDate>
      <description>The first stable major. Pro-grade BIM Hub, real clash detection, the BOQ pro rebuild, a 7-stage Match Elements pipeline, BI Dashboards starter pack and a public /api/v1/* contract.</description>
    </item>
    <item>
      <title>v3.6.0 / v3.6.1 — Multi-level BOQ hierarchy</title>
      <link>https://openconstructionerp.com/news/v3-6-0</link>
      <guid isPermaLink="true">https://openconstructionerp.com/news/v3-6-0</guid>
      <pubDate>Mon, 18 May 2026 00:00:00 +0000</pubDate>
      <description>BOQ nesting up to depth 8, recursive parent_id tree walk, resource-code dedup.</description>
    </item>
    <item>
      <title>v3.0.0 — First stable v3 major</title>
      <link>https://openconstructionerp.com/news/v3-0-0</link>
      <guid isPermaLink="true">https://openconstructionerp.com/news/v3-0-0</guid>
      <pubDate>Wed, 13 May 2026 00:00:00 +0000</pubDate>
      <description>18-module wave, deterministic FSM engine, ISO 16739-1 IFC parser, Qdrant-backed Match Elements.</description>
    </item>
  </channel>
</rss>
