Report and action a near-miss

Log the near-miss while the detail is fresh, work out the cause and set the corrective action, then check on the walk that the control is actually in place.

3 steps8 minGeneral contractorSpecialist subcontractorProject / construction manager

How it works, step by step

3 steps across the platform - what you do at each one, and why it matters.

1

Log the near-miss

Safety

Record what happened, where and when, who was involved and what harm it could have caused, with a photo of the scene. Capture it the same shift, before memories fade and the scene is cleared.

Why: A near-miss is a free warning: the injury it points to has not happened yet. Logging it while it is fresh is what lets you fix the cause before the next time turns it into a real accident.

InNear-miss observationScene photoOutLogged near-missPotential-harm rating
2

Find the cause and act

Safety

Look past the immediate trigger to why the control failed, then set the corrective action with a named owner and a due date, and brief the wider crew if the same risk exists elsewhere on site.

Why: Blaming the person who slipped fixes nothing; the missing barrier or the bad access will catch the next worker too. Fixing the cause is what actually removes the hazard rather than moving it along.

InLogged near-missFailed controlOutRoot causeCorrective action
3

Verify the fix on the walk

Inspections

Go back to the spot on the next inspection walk, confirm the corrective action is really done and holding, and close the near-miss with the evidence attached.

Why: An action marked done in the office is not the same as a barrier standing on the ground. Checking it on the walk is what turns a good intention into protection a worker can lean on.

InCorrective actionInspection walkOutControl verifiedNear-miss closed