All casesOpen demo
Cases / Handover & lifecycle
Handover & lifecycle

Set up the asset register for FM

Build the asset register the operator will run the building from: capture the installed assets with their location, type and key data, attach the manuals and warranties, and hand it over so maintenance can start from day one.

4 steps11 minOwner / operator (FM)Developer / client

How it works, step by step

4 steps across the platform - what you do at each one, and why it matters.

1

Capture the installed assets

Project files

List every maintainable asset that was actually installed, its type, make and model, and give each one a tag so it can be found and referred to without ambiguity.

Why: The register is only useful if it matches the building. An asset that was swapped during construction but never updated in the list leaves the operator maintaining a machine that was never fitted.

InInstalled equipmentAs-built recordsOutTagged asset listAsset tags
2

Record location and key data

Quality

For each asset record where it sits, floor, room and the system it serves, along with the key data a maintainer needs such as rating, capacity and service intervals.

Why: When a unit fails, the first question is always where it is and what serves it. A register that answers that in one line saves the maintenance team hours of hunting through plant rooms and ceilings.

InTagged asset listFloor and room layoutEquipment specificationsOutLocated assetsKey asset data
3

Attach manuals and warranties

Close-out

Link each asset to its operation manual, spare parts list and warranty, so opening the asset gives the maintainer everything they need without a separate search.

Why: A register with the documents attached turns a name in a list into a working record. Without the manual and the warranty in reach, the maintainer is back to guessing and the warranty is easy to miss.

InLocated asset registerOperation manualsWarranties and sparesOutDocuments linkedComplete asset register
4

Hand over so maintenance can start

Reports

Issue the completed register to the maintenance team as the record they will run from, and produce a summary of what it covers so day-one planned maintenance can be set up straight away.

Why: The point of the register is a running building, not a filed document. Handing it over ready to use is what lets the operator start planned maintenance from day one instead of rebuilding the list themselves.

InComplete asset registerMaintenance teamOutIssued registerCoverage summaryDay-one maintenance ready

More in Handover & lifecycle