BIM & takeoff

Measure quantities from a DWG

Load a DWG, lock the scale against a known dimension, measure the areas, lengths and counts you need, then push those quantities straight into a priced bill.

3 steps10 minCost consultant / QSGeneral contractorBIM / digital consultant

How it works, step by step

3 steps across the platform - what you do at each one, and why it matters.

1

Open the drawing

DWG take-off

Bring in the DWG and calibrate the scale against a dimension you trust, such as a gridline spacing or a door width, so a measured line reads in real metres. Switch off the layers you do not need so the sheet is clean to trace over.

Why: A scale that is out by even a few percent multiplies through every area and length you take off, and nobody notices until the concrete order comes back wrong. Calibrating once at the start is a two minute job that protects the whole take-off.

InDWG drawingKnown dimensionOutCalibrated scaleClean traced sheet
2

Measure the work

Take-off

Trace polygons for floor areas, run polylines along walls and skirtings, and drop point markers on doors and fittings. Keep each type in its own named group so a wall run, a slab area and a door count stay separate.

Why: Measurements kept in tidy groups price without untangling and audit in seconds. When a figure looks high, you click the group and see the exact shape that produced it, instead of defending a number you cannot explain.

InCalibrated drawingItems to measureOutMeasured quantitiesNamed measurement groups
3

Price the quantities

BOQ

Feed the grouped quantities into the bill and attach a rate to each line. Every position holds a live link back to the shape it was measured from, so a revised drawing flows through to the quantity.

Why: Typing quantities from a drawing into a separate spreadsheet is where numbers get transposed and areas get dropped. Measuring and pricing in one chain removes that hand-off, and the priced bill can always be traced back to the sheet it came from.

InGrouped quantitiesUnit ratesOutPriced billLive shape links