Talk · Future/s of Construction 2026 · ETH Zürich

The Uberization of Construction and the future of building

Why projects will soon be calculated from data - and how clients will start estimating cost and time themselves. A plain-language talk on what is changing in construction right now.

From expert opinion to numbers anyone can verify.

For most of its history, construction has run on expert judgment. Budgets, schedules and costs are set by experienced people, and they are trusted because of who produced them - not because anyone can check the numbers underneath. This talk, given at the Future/s of Construction 2026 conference at ETH Zürich, makes one simple argument: that is about to change.

This is the short version. The full argument is now published as a whitepaper: The Uberization of Construction - 17 chapters, 58 figures, and the 4000-year history of the one unit that makes a price reproducible. Also in Deutsch and Русский.

As project data becomes open and machine-readable, estimating a building's cost and time stops being a closed, specialist craft - and starts becoming something a client can do too. The talk explains, in everyday language, what is shifting in the industry right now: where the data already lives, how to get it out without heavy software, and why AI has quietly moved estimating within reach of anyone who can describe what they want.

Watch the talk

The Uberization of Construction - talk at Future/s of Construction 2026, ETH Zürich
▶ Future/s of Construction 2026
The Uberization of Construction and the Future of Building. The video description has timecodes for every topic, so you can start from any point. Audio tracks are available in the major languages.

What the talk covers

01Numbers you can verify, not opinions you must trust

A project's most important figures - the budget, the schedule, the final cost - still rest on individual expertise. When the basis is a spreadsheet nobody else can open, or a judgment call, every decision downstream inherits that uncertainty. The alternative is already here: estimates that trace back to the model and the data they came from, so anyone can check them.

02Get the data out of any project - without heavy BIM software

The geometry and quantities you need are already inside the design files. You do not need a wall of specialist buttons to reach them. The same Revit, IFC and DWG files can be converted straight into databases and ordinary spreadsheets that any estimator can read - no expensive modelling suite required just to count what is in the model.

03The 30-year head start nobody talks about

The largest software vendors have been reading CAD and BIM files as databases for three decades. That capability was never a secret - it simply stayed locked inside proprietary tools, and the wider market never noticed. Open converters now put the same approach in everyone's hands.

04AI that estimates from a plain-language request

Today's AI assistants - ChatGPT, Claude and others - can take a request written in ordinary words ("how much concrete is in this model, and what would it cost?") and return quantities and a priced estimate, working directly on the project data. The skill shifts from operating software to asking the right question.

05Open data - and estimating stops being the contractor's job alone

When project data is open and the tools to read it are free, the contractor is no longer the only party who can put a number on a building. Clients, owners and public bodies can run their own estimates - and check the ones they are given. That is the "Uberization" in the title: not cheaper labour, but a market where verifiable cost and time are available to everyone, instead of being gatekept by whoever owns the software.

The punchline Estimating a project's cost will not be the contractor's job alone anymore. Once the data is open and AI can read it, the same numbers are available to the client, the owner and the public body that pays for the work - and a price can finally be checked, not just trusted.

From the idea to working software

OpenConstructionERP is this argument turned into a working, open-source platform. Open converters read .rvt, .ifc and .dwg files into structured data; an open cost database prices the quantities; and an AI layer proposes estimates in plain language - all self-hosted, under AGPL-3.0, with the data on your own infrastructure. The live demo runs the full flow from model import to a priced bill of quantities.

Trademark notice. All product and company names, file-format extensions (e.g. .rvt, .ifc, .dwg) and AI assistant names referenced in this article are the property of their respective owners. Their use here is descriptive and refers to interoperability or industry context only. No affiliation, endorsement or sponsorship is implied unless explicitly stated.

Published under AGPL-3.0. Full source on github.com/datadrivenconstruction/OpenConstructionERP. The live openconstructionerp.com tracks the newest release. · All news