
What changed
- Procurement records the supplier's confirmation of an issued order and lets an order allow a stated overrun on its invoices.
- The supplier card shows whether the supplier is still qualified, and vendors and the catalog open from inside Procurement.
- A Background services button in the top bar lists every service the platform keeps loaded, what it is for, which modules use it and roughly how much memory it takes.
- Semantic search is off by default on every installation, and nothing loads its model until an administrator turns it on.
- The platform asks once before any project address leaves the server for geocoding.
- Italian markup templates are offered per price list and per price analysis, and drawing sheets can be edited in bulk.
Screenshots show the current release, 19.0.0.
Install or upgrade
pip install --upgrade openconstructionerp
Desktop installers for Windows, macOS and Linux are on
openconstructionerp.com/download.
The macOS build is for Apple Silicon only. On an Intel Mac, install with
pip or Docker. If you run an external PostgreSQL through
DATABASE_URL, nothing about that connection changes.
Questions or trouble upgrading, write to
info@datadrivenconstruction.io.
Tell us how it went
If you have installed or tested OpenConstructionERP, we would like to hear what happened, including the parts that did not work. Open an issue on GitHub or write to info@datadrivenconstruction.io. Setup guides and full documentation are in the docs.
Try the current release.
Live demo in your browser, or self-host in five minutes. AGPL-3.0, no signup required.