Home/ News/ v5.2.2 - /dashboard + W10/W13/SAF-A3 + a11y
Release 2026-05-27 ~4 min read

v5.2.2 - Seven small fixes
across dashboard, takeoff and safety.

v5.2.2 is the first bug-fix follow-up to the v5.2.0 international-BOQ wave. The /dashboard route now actually renders the dashboard instead of being silently unreachable, the takeoff PDF viewer cancels its in-flight render task on page change, the validation banner stops claiming success on empty runs, the project widget grid stops 405-ing the Change Orders summary, six OSHA fields are exposed on Safety Incident responses, and five Page-level files get an aria-label backfill.

v5.2.2

v5.2.0 was a long-running feature wave - Epic I, four native BOQ formats, one regional-exchange import surface. v5.2.2 is the opposite: a tightly-scoped bug-fix release that closes seven small issues a careful user would hit in their first half-hour with the app. Each one is a credibility bug, not a data-loss bug, but the cumulative impression is the same: things should work the way the UI implies they do.

The seven changes

/dashboard route renders the actual page

Follow-up to BUG-215: / was redirecting authenticated users to /projects, which made DashboardPage unreachable for everyone. /dashboard is now an explicit route that mounts DashboardPage directly, so the rollup widgets, project list and notifications panel show up where the sidebar shortcut promises they will.

Takeoff viewer cancels in-flight pdf.js renders

TakeoffViewerModule previously kicked off a pdf.js RenderTask on every page change without cancelling the previous one, so flipping pages fast could paint stale glyphs over the new page or leave the overlay canvas filled with the previous page’s markups. The fix mirrors the same pattern already shipped in #233 for InlinePdfAnnotator: cancel the in-flight task, clear the overlay, then start the new render.

Validation banner stops lying about empty runs

/validation showed a green “All passed” banner even when the run produced zero results - e.g. a freshly imported project before any rules had executed. v5.2.2 gates that banner on total > 0 so a vacuous-truth zero-rule run no longer reads as a successful validation pass.

Project widget grid stops 405-ing Change Orders

ProjectWidgets was calling /v1/changeorders/summary without a trailing slash, and FastAPI was matching it as {order_id}=summary - serving an HTTP 405 because no GET handler existed for that synthetic path. Adding the trailing slash routes the call to the real summary endpoint, and the dashboard tile renders the change-order rollup it was meant to all along.

Safety Incident response carries the OSHA fields

The safety.IncidentResponse schema was missing six OSHA-recordable fields that already existed on the underlying model: osha_recordable, osha_case_number, days_away, days_restricted, root_cause_method, and root_cause_tags. The fields are now exposed end-to-end so the SAF-A3 dashboard, OSHA-300 export and downstream reporting all see the canonical incident record.

Aria-label backfill on five Page.tsx files

Carry-over from #212: AssembliesPage, BOQListPage, ContactsPage, ContractsPage, ProjectsPage and TakeoffPage gain accessible labels on icon-only buttons and row-action controls. Screen-reader users no longer hear “button” on its own and can navigate by action verb instead of guessing what each unlabelled icon does.

Why this matters

None of these are headline features - a v5.2.x patch never is - but together they remove a noticeable layer of friction. A dashboard route that doesn’t resolve to the dashboard, a takeoff page that paints stale glyphs, a validation banner that congratulates you for doing nothing, a widget that 405s on a missing trailing slash - each is small in isolation, each reads as “this product is half-finished” in aggregate. The backend-API fix on safety.IncidentResponse matters independently: the SAF-A3 audit fields are part of the regulatory contract on US sites, so a missing-field response is functionally a missing-record response for any downstream consumer.

Upgrade

pip install --upgrade openconstructionerp

No Alembic migration in this release - head stays unchanged. The safety.IncidentResponse change is additive (the columns already exist on the model and DB), so the only consumer-visible difference is six new keys appearing on the wire. Frontend ships the route change, the takeoff cancel-on-unmount fix, the validation banner guard, the trailing-slash /changeorders/summary/ call, and the aria-label backfill.

Try v5.2.2 today.

Live demo in your browser, or self-host in five minutes. AGPL-3.0, no signup required.