Kosten im Bauwesen — cost groups in construction
The cost backbone of every German project. Rule pack covers cost group required, valid KG code,
hierarchy correctness, completeness per stage. KG 100–700 with three drill‑down levels supported.
Status
Rule pack · 4 rules
Authority
DIN Deutsches Institut für Normung
New Rules of Measurement — order of cost estimating & detailed measurement
UK pre‑contract cost planning (NRM 1) plus post‑contract BoQ (NRM 2). Rule pack covers
classification required, valid element code, completeness. Element groups 1.x – 7.x of NRM 1 are taxonomy‑native.
Status
Rule pack · 3 rules
Authority
RICS — Royal Institution of Chartered Surveyors
MasterFormatCSI
North America
Master list of construction work sections — CSI / CSC
50 divisions, Div 00 (Procurement) through Div 49. Rule pack covers
classification required, valid division code, completeness per project stage. Trade‑shaped procurement
language — pairs naturally with NRM 1 elemental for cross‑border bids.
Status
Rule pack · 3 rules
Authority
CSI (US) · CSC (Canada)
Décomposition du Prix Global et Forfaitaire — French BoQ structure
French marchés‑publics BoQ. Rule pack covers lot required and pricing complete — runs as a
validation pass on imported French tender data. We don't currently emit DPGF as a native file format;
export goes through the generic XLSX path with DPGF column structure.
Status
Rule pack · 2 rulesXLSX export only
Authority
Code de la commande publique
GAEB structural & pricing validators
Even before file export, the BOQ must pass the GAEB rule pack: ordinal format, LV section
structure, trade section codes, Einheitspreis sanity, quantity decimal rules. Public works rejects malformed bids — these gates catch it before it leaves.
Status
Rule pack · 5 rules
Authority
GAEB e.V. / DIN
BOQ quality (universal)
All regions
Universal BOQ structural & pricing validators
The 20 universal rules that run regardless of regional pack: missing quantities, zero prices,
duplicate ordinals, invalid units, scope completeness, classification consistency.
Every project passes through this set on every BOQ release.
Status
Rule pack · ~20 rules
Authority
In‑house · OCERP core