Cases / Estimating & costing
Estimating & costing

Build an assembly (recipe rate)

Turn a build-up you price again and again into one reusable assembly: pick the component items, set how much of each goes in, then drive whole bill lines from a single composite rate.

3 steps11 minCost consultancy / QS practiceGeneral contractorSpecialist subcontractor

How it works, step by step

3 steps across the platform - what you do at each one, and why it matters.

1

Pick the component items

Cost Explorer

Find the labour, material and plant items the build-up needs in the cost database, for example concrete, formwork and reinforcement for a wall, and read each rate and unit before you pull it in.

Why: An assembly is only as sound as the items under it, so each component has to carry a real, traceable rate. Choosing them from the database rather than typing numbers keeps every part of the recipe justifiable.

InCost databaseBuild-up scopeOutSelected component itemsComponent rates and units
2

Set the recipe factors

Assemblies

Assemble the components into one recipe and set the factor each contributes per unit of output, such as the cubic metres of concrete, square metres of shutter and kilograms of steel in one square metre of wall. Let the composite rate roll up.

Why: The factors are the engineering knowledge in the rate, and once they are right the assembly prices the work consistently every time. Getting the proportions correct once beats re-deriving them line by line and getting a different answer each go.

InSelected component itemsOutput unitOutPer-unit factorsComposite unit rate
3

Drive bill lines from it

BOQ

Place the assembly into the bill and enter one output quantity, and watch it carry the concrete, shutter and steel through in the right proportions with a single composite rate on the line.

Why: A saved assembly makes repeated pricing fast and, more importantly, consistent across a large bill. Change a component rate once and every line built on it moves together, so a price rise cannot be applied in one place and forgotten in ten.

InSaved assemblyOutput quantityOutPriced bill lineRolled-up components
Modules

Modules in this playbook

3 / 190 platform modules

More in Estimating & costing

Estimating & costing

Price a building from a PDF

Start from a flat PDF drawing and finish with a priced, validated estimate ready to export.…

5 steps15 minOpen
Estimating & costing

Estimate from a cost database

Pull priced items from a real cost database, build the bill from them, bundle recurring bui…

4 steps12 minOpen