Get 6D carbon from a BIM model
Turn a converted BIM model into an embodied carbon footprint. Auto-enrich reads quantities…
Load a DWG, lock the scale against a known dimension, measure the areas, lengths and counts you need, then push those quantities straight into a priced bill.
3 steps across the platform - what you do at each one, and why it matters.
Bring in the DWG and calibrate the scale against a dimension you trust, such as a gridline spacing or a door width, so a measured line reads in real metres. Switch off the layers you do not need so the sheet is clean to trace over.
Why: A scale that is out by even a few percent multiplies through every area and length you take off, and nobody notices until the concrete order comes back wrong. Calibrating once at the start is a two minute job that protects the whole take-off.
Trace polygons for floor areas, run polylines along walls and skirtings, and drop point markers on doors and fittings. Keep each type in its own named group so a wall run, a slab area and a door count stay separate.

Why: Measurements kept in tidy groups price without untangling and audit in seconds. When a figure looks high, you click the group and see the exact shape that produced it, instead of defending a number you cannot explain.
Feed the grouped quantities into the bill and attach a rate to each line. Every position holds a live link back to the shape it was measured from, so a revised drawing flows through to the quantity.

Why: Typing quantities from a drawing into a separate spreadsheet is where numbers get transposed and areas get dropped. Measuring and pricing in one chain removes that hand-off, and the priced bill can always be traced back to the sheet it came from.
3 / 190 platform modules
Turn a converted BIM model into an embodied carbon footprint. Auto-enrich reads quantities…
Load a converted model, lift the element quantities straight off the geometry, carry them i…
Bring the discipline models together on one coordinate base, run the clash test, clear the…