Home/ News/ v8.4.0 - PDF takeoff measurements stay with their document
Release Stable June 17, 2026 ~2 min read

v8.4.0 - takeoff measurements that stay with their document.

8.4.0 is a reliability release. PDF takeoff measurements are now tied to the project and the specific document they were drawn on, so two files that happen to share a name can no longer show each other's quantities. It closes a problem reported by the community as issue 238. Alongside it, a position's resources in the bill of quantities open on the first click, and the public demo now keeps its bundled cost databases read-only.

8.4.0 files down a few sharp edges rather than adding a headline feature. The main change is in PDF takeoff: a measurement now belongs to the project and the exact document it was drawn on, not to a file name, so two documents that share a name can no longer surface each other's measurements. A community report, issue 238, pointed at the old behaviour. Two smaller fixes ride with it: a position's resources in the bill of quantities open on the first click, and the public demo keeps its bundled cost databases read-only so it stays fast on a small shared box.

What is new in version 8.4.0

A measurement that belongs to one document

PDF takeoff is where quantities come off a drawing, and those quantities have to stay attached to the drawing they came from. In earlier versions a measurement was stored against the document's file name. That is fine until two documents carry the same name, which happens often in practice: a revised sheet uploaded under the same file name, or the same standard detail reused across two projects. When names collided, measurements could leak from one document into another.

8.4.0 changes the key. A measurement is now tied to the project and the document's own identity, so it lives with exactly one drawing and nothing else. Same-named files sit apart, in the same project or in different ones, and the quantities you took off one sheet stay on that sheet. The fix follows a report from the community, issue 238, and it applies to both the saved data and the working view.

One click to open a position's resources

In the bill of quantities, a position can be expanded to show the labour, material and equipment resources behind it. That expander used to need two clicks: the first appeared to do nothing, the second opened the row. Every other expander in the grid opened on the first click, so the BOQ one was simply out of step. It now opens on the first click as well, which removes a small but constant moment of friction when you work down a bill.

A demo that stays a demo

The public demo at openconstructionerp.com runs on a small shared server so anyone can try the platform without installing anything. Regional cost databases are a different matter: each one is several hundred megabytes, and installing them on that shared box would slow it down for everyone. 8.4.0 makes the cost databases read-only on the demo. You can still browse every catalogue the full product ships, but the install action is disabled and explains why, and points you to a self-hosted instance when you want to load a region or bring your own cost data. On your own machine or server nothing is restricted.

By the numbers

238

the community report this release closes: takeoff measurements now stay with their document.

1

click to open a position's resources in the bill of quantities, down from two.

3

focused changes: a takeoff fix, a BOQ click, and a tidier public demo.

27

languages, every screen, carried forward unchanged in this release.

2 GB

of RAM is all a full self-hosted instance needs to run.

AGPL-3.0

open source and self-hosted, with no signup required to try the demo.

Install or upgrade

pip install --upgrade openconstructionerp

The desktop installers for Windows, macOS and Linux carry the same one-installer setup, and the Linux build includes the CAD and BIM converters for AutoCAD, Revit and IFC. You can grab the latest installers from openconstructionerp.com/download. If you run an external PostgreSQL through DATABASE_URL, nothing about that connection changes. Questions or trouble upgrading, write to info@datadrivenconstruction.io.

Try v8.4.0 today.

Live demo in your browser, or self-host in five minutes. AGPL-3.0, no signup required.