Build an assembly (recipe rate)
Turn a build-up you price again and again into one reusable assembly: pick the component items, set how much of each goes in, then drive whole bill lines from a single composite rate.
How it works, step by step
3 steps across the platform - what you do at each one, and why it matters.
Pick the component items
Cost ExplorerFind the labour, material and plant items the build-up needs in the cost database, for example concrete, formwork and reinforcement for a wall, and read each rate and unit before you pull it in.
Why: An assembly is only as sound as the items under it, so each component has to carry a real, traceable rate. Choosing them from the database rather than typing numbers keeps every part of the recipe justifiable.
Set the recipe factors
AssembliesAssemble the components into one recipe and set the factor each contributes per unit of output, such as the cubic metres of concrete, square metres of shutter and kilograms of steel in one square metre of wall. Let the composite rate roll up.
Why: The factors are the engineering knowledge in the rate, and once they are right the assembly prices the work consistently every time. Getting the proportions correct once beats re-deriving them line by line and getting a different answer each go.
Drive bill lines from it
BOQPlace the assembly into the bill and enter one output quantity, and watch it carry the concrete, shutter and steel through in the right proportions with a single composite rate on the line.
Why: A saved assembly makes repeated pricing fast and, more importantly, consistent across a large bill. Change a component rate once and every line built on it moves together, so a price rise cannot be applied in one place and forgotten in ten.