Draft an estimate with AI element matching

Match imported elements to cost items, let AI price the scope, accept it into the bill and validate before you trust it.

4 steps10 minGeneral contractorSpecialist subcontractorCost consultant / QS

How it works, step by step

4 steps across the platform - what you do at each one, and why it matters.

1

Match elements to cost items

Match Elements

Import your elements and descriptions and let the matcher line each one up to a cost-database item, with a confidence score on every match.

Why: Coding hundreds of lines by hand is slow and uneven. Scored matches show where to trust the machine and where to check by hand.

InImported elementsCost databaseElement descriptionsOutMatched cost itemsConfidence scores
2

Let AI price the scope

AI Estimator

Run the AI estimator over the matched scope so it proposes priced lines, then confirm or overrule each suggestion.

Why: A first-pass priced draft in minutes saves hours, but a number only goes in the bid once a person has signed it off.

InMatched scopeRate referencesOutProposed priced linesConfirmed prices
3

Accept lines into the bill

BOQ

Pull the confirmed lines into the bill of quantities and enter or adjust the quantities.

Why: The bill is what you actually price and submit. Getting the quantities right here is where the money is won or lost.

InConfirmed priced linesMeasured quantitiesOutDraft bill of quantitiesPriced total
4

Validate before you trust it

Validation

Run validation over the finished bill to flag zero prices, missing quantities, duplicates and rate outliers.

Why: An AI draft can leave a hole or a silly rate that reads fine at a glance. Catching it before submission stops an underpriced or embarrassing bid.

InDraft billQuality rule setOutValidation reportFlagged issues