All casesOpen demo
Cases / Estimating & costing
Estimating & costing

Import a GAEB tender into a priced BOQ

Receive a GAEB tender file, bring it in as a bill without rekeying, price the positions, validate the structure and hand back a priced GAEB the client can read straight into their own system.

5 steps12 minGeneral contractorSpecialist subcontractorCost consultant / QS

How it works, step by step

5 steps across the platform - what you do at each one, and why it matters.

1

Receive the GAEB file

Files

Save the GAEB file the client issued into the project files alongside the invitation, so the version you priced is the version on record.

Why: Tenders get reissued. Filing the exact file you worked from means a later query about which revision you priced has a one-click answer instead of an argument.

InGAEB tender fileInvitation to tenderOutFiled tender document
2

Import it as a bill

BOQ

Import the GAEB into a new bill. The groups, positions, quantities, units and long text come across intact, so you have an empty priced-out column to fill and nothing else to retype.

Why: Retyping a bill of a few hundred positions is where transposed quantities and dropped items creep in. Importing keeps your offer tied to the client's exact wording and numbering.

InGAEB tender fileOutBill with positionsPreserved LV structure
3

Price the positions

Catalog

Match each position to a rate from the cost catalog or an assembly, adjusting for the wording where the standard rate does not quite fit, until every line carries a unit price.

Why: A rate pulled from a maintained catalog is defensible and fast. Reading the position text as you price it is where you catch the qualification hidden in a description that would otherwise cost you on site.

InUnpriced positionsCost catalog ratesOutPriced positions
4

Validate before you send

Validation

Run the bill through validation to catch any position left at zero, a quantity that does not tie, or a GAEB structure rule the return file must honour.

Why: A single unpriced position can void a submission or hide a loss you carry all the way to site. Validation turns a last-minute scramble into a green light you can trust.

InPriced billOutValidation reportGaps flagged
5

Return the priced GAEB

Reports

Export the priced bill back to GAEB and issue it as your offer, so the client reads your prices straight into their evaluation without touching a keyboard.

Why: An offer that loads cleanly into the client's system is easier to award. Returning the same open format you were given is a small courtesy that keeps your bid at the front of the pile.

InValidated priced billOutPriced GAEB returnTender offer

More in Estimating & costing