All casesOpen demo
Cases / BIM & takeoff
BIM & takeoff

Set up the common data environment

Stand up the common data environment, load the information containers with the right status, and aim coordination at the shared area.

3 steps7 minGeneral contractorBIM / digital consultantDesigner / engineer

How it works, step by step

3 steps across the platform - what you do at each one, and why it matters.

1

Define the status states

CDE

In the CDE, define the status states, work in progress, shared, published and archived, and lay out the folder structure.

Why: If everyone reads and writes to their own copies, someone builds from a superseded drawing. The states tell you what is safe to use and what is still a draft.

InCDE standardNaming conventionOutStatus statesFolder structure
2

Load the containers

Project Files

In Project Files, load the information containers, models, drawings and documents, and set each one to its status.

Why: A container with no status is a trap, nobody knows if it is checked or just parked. Correct status is what lets the next person trust the file.

InStatus statesModels & drawingsOutLoaded containersStatus assigned
3

Federate the models

Coordination

In Coordination, point the model federations at the shared area so everyone coordinates against the same set.

Why: Clash checking against private working models finds clashes that are already fixed and misses the ones that are not. The shared area is the single source everyone federates from.

InShared-area modelsPublished containersOutFederated model setSingle source of truth

More in BIM & takeoff