Juhtumid / BIM ja mõõdistus
BIM ja mõõdistus

Hoia kuldne niit alles kõrgema riskiga hoones

Määra kindlaks, millist teavet hoone ohutuse režiim nõuab, hoia seda ühises andmekeskkonnas olekute ja sobivuskoodidega kaustade asemel, vasta ehitusjärelevalvele fikseeritud versioonide alusel, ning anna niit üle täielikuna, mitte ei sulge seda.

5 sammu16 minArendaja / klientBIM / diginõustaminePeatöövõtjaProjekti- / ehitusjuhtimisbüroo

Kuidas see töötab, samm-sammult

5 sammu läbi platvormi - mida teete igas ja miks see loeb.

1

State what information is required before anybody produces it

EIR maatriks (ISO 19650)

Set the information requirements out as a matrix: what has to be delivered, by whom, at what point and to what standard, with the quality gates each set has to pass. Everything downstream is then measured against this rather than against habit.

Ekraanipilt, samm 1: State what information is required before anybody produces it (EIR maatriks (ISO 19650), Hoia kuldne niit alles kõrgema riskiga hoones)
EIR maatriks (ISO 19650): State what information is required before anybody produces it

Miks: The golden thread fails at the beginning far more often than at the end. Nobody hands over a building with no information; they hand over a great deal of information nobody asked for, in a form nobody can search, which under a regime that expects the accountable person to answer a question quickly is the same as having none.

SisendClient information requirementsDelivery programmeVäljundRequirements matrixAcceptance criteria agreed
2

Separate work in progress from what has been shared

Ühine andmekeskkond

Run the information through the common data environment states, from work in progress to shared, published and archived, with a suitability code on every container saying what it may be used for. Moving a container between states is a gate somebody passes, not a drag between folders.

Ekraanipilt, samm 2: Separate work in progress from what has been shared (Ühine andmekeskkond, Hoia kuldne niit alles kõrgema riskiga hoones)
Ühine andmekeskkond: Separate work in progress from what has been shared

Miks: The difference between a drawing you may build from and a drawing somebody is still working on is the single most expensive distinction on a construction project, and a folder name cannot carry it. A suitability code travels with the container, so whoever opens it six months later knows what it was fit for without ringing the person who made it.

SisendDrawings and modelsAgreed suitability codesVäljundInformation approved for constructionWork in progress kept separate
3

Keep the register the accountable person will read

Dokumendid

Hold the drawings, specifications, calculations, product data and certificates as one register with versions, so the current revision is obvious and the superseded one is still there. Tag and file them the way the requirements matrix asked for, not the way each discipline would prefer.

Ekraanipilt, samm 3: Keep the register the accountable person will read (Dokumendid, Hoia kuldne niit alles kõrgema riskiga hoones)
Dokumendid: Keep the register the accountable person will read

Miks: The regime expects information to be current and findable, and those two fail together: a register where the latest revision is ambiguous is a register where somebody eventually builds from the wrong sheet. Keeping superseded versions rather than overwriting them also answers the question that comes up in every investigation, which is what was known at the time.

SisendDrawings, specifications and certificatesProduct data and test resultsVäljundVersioned document registerSuperseded revisions kept
4

Answer building control against the version you submitted

Ülevaatav asutus

Run the review cycle with the approving authority: record the submission with the document version pinned to it, log each remark, respond to it and close out the decision. When the live document moves on, a remark raised against the submitted version is flagged as stale rather than silently remapped onto the new one.

Ekraanipilt, samm 4: Answer building control against the version you submitted (Ülevaatav asutus, Hoia kuldne niit alles kõrgema riskiga hoones)
Ülevaatav asutus: Answer building control against the version you submitted

Miks: A remark answered against a drawing that has changed since submission is an answer to a question nobody asked. Pinning the version makes the exchange reconstructable, which is the whole ask of a gateway: show what you submitted, what you were told about it, and what you did in response.

SisendSubmission packComments raised on reviewVäljundResponses against pinned versionsDecision recorded
5

Hand the thread on rather than closing it

Lõpetamine

Bind the information into the handover package: the as-built set, the operation and maintenance information, the test and commissioning certificates, the fire and structural information, and the manifest that says what is in there. Issue it to whoever becomes accountable for the building in occupation.

Miks: The golden thread does not stop at practical completion, it changes hands. A package that arrives as a folder tree with no manifest becomes an archive nobody opens within a month, and the next person who needs to know how the building was actually built starts again from whatever drawings are still on site.

SisendVersioned document registerAs-built informationVäljundHandover package issuedAccountable person has the thread
Moodulid

Selle tegevusjuhendi moodulid

5 / 190 platvormi moodulit

The market this case is written for

Ühendkuningriik

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • RICS NRM 1/2
  • JCT
  • CIS

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Rohkem valdkonnas BIM ja mõõdistus

BIM ja mõõdistus

Get 6D carbon from a BIM model

Turn a converted BIM model into an embodied carbon footprint. Auto-enrich reads quantities…

5 sammu12 minAva
BIM ja mõõdistus

Get quantities from a BIM model

Load a converted model, lift the element quantities straight off the geometry, carry them i…

3 sammu12 minAva
BIM ja mõõdistus

Measure quantities from a DWG

Load a DWG, lock the scale against a known dimension, measure the areas, lengths and counts…

3 sammu10 minAva