Bumuo ng smeta gamit ang mga norma ng GESN sa pamamagitan ng resource method

Kunin ang koleksyon ng norma na tinukoy sa kontrata, i-expand ang bawat norma sa consumption nito ng paggawa, makinarya, at materyales, presyuhan ang mga resource na iyon sa kasalukuyang pera at i-post bilang lokalnaya smeta, para bumukas ang bawat rate pababa hanggang sa norma na pinagmulan nito.

7 hakbang14 minGeneral ContractorEspesyalistang SubcontractorCost Consultancy / QS PracticeDeveloper / Kliyente

Paano ito gumagana, hakbang-hakbang

7 hakbang sa buong platform - ano ang gagawin mo sa bawat isa at bakit mahalaga ito.

1

Pick the norm collection the job is priced on

Database ng Gastos

Open the cost database and choose the collection the job is actually priced on: GESN when you will price the resources yourself, FER when a federal unit rate governs, TER when the region has approved its own territorial rates. Record the edition alongside it, because a norm number is only unique inside its edition.

Screenshot, hakbang 1: Pick the norm collection the job is priced on (Database ng Gastos, Bumuo ng smeta gamit ang mga norma ng GESN sa pamamagitan ng resource method)
Database ng Gastos: Pick the norm collection the job is priced on

Bakit: GESN and FER are two readings of the same federal norm base, published together as FSNB, while TER are the territorial equivalents a region approves for its own territory. GESN carries physical consumption and no prices, FER and TER carry rates already priced in base year money. Starting on the wrong one is not a rounding error: it decides whether the resource method is open to you at all, and whether state expertise will accept the result.

PapasokContract or technical assignmentRegion of the worksLumalabasSelected norm collectionEdition on record
2

Expand each norm into the resources it fixes

Mga Production Norm

Open the norm and read what it contains: man hours by trade grade, machine hours by machine type, and the material quantity per unit of measure. Adjust a quantity only where the technical part of the collection allows it, and write down the clause you relied on next to the change.

Bakit: The consumption inside a GESN norm is the state's statement of what the work takes, and it is the half of the price nobody is free to invent. A resource quantity moved without the technical part behind it is the first thing an expertise reviewer writes up, because it can be spotted without recalculating anything.

PapasokNorm numberTechnical part of the collectionLumalabasResource list per unitClause behind any adjustment
3

Price the resources at current money

Katalogo ng Resource

Give every resource a price: the hourly wage for the grade in this region, the machine hour rate with the operator in it, and the material price from your own quotes delivered to site rather than ex works. Keep the source and the date on each price.

Screenshot, hakbang 3: Price the resources at current money (Katalogo ng Resource, Bumuo ng smeta gamit ang mga norma ng GESN sa pamamagitan ng resource method)
Katalogo ng Resource: Price the resources at current money

Bakit: This is the step that makes the method resource based rather than index based. A price without a named source cannot be defended when the customer asks where the figure came from, and a price without a date cannot be re-based when the job runs into the following year.

PapasokSupplier quotesRegional wage per gradeLumalabasPriced resource catalogueSource and date per price
4

Compose the work you repeat into assemblies

Mga Assembly

Where the same combination of norms and resources comes back section after section, save it once as an assembly with its own unit of measure, so the next section and the next project start from it instead of from the norm list again.

Screenshot, hakbang 4: Compose the work you repeat into assemblies (Mga Assembly, Bumuo ng smeta gamit ang mga norma ng GESN sa pamamagitan ng resource method)
Mga Assembly: Compose the work you repeat into assemblies

Bakit: A smeta of several thousand positions cannot be kept consistent line by line, and inconsistency between two identical items in different sections is exactly what a reviewer picks up. An assembly also carries the reasoning with it, which is what lets a second estimator take over your file without rebuilding it.

PapasokNorms that recurPriced resourcesLumalabasSaved assemblyAssembly unit rate
5

Post the positions into the lokalnaya smeta

Bill of Quantities (BOQ)

Enter each priced position with its quantity from the takeoff, grouped into sections the way the working drawings divide the work, and keep the norm number, the unit of measure and the resource-built rate on every line.

Screenshot, hakbang 5: Post the positions into the lokalnaya smeta (Bill of Quantities (BOQ), Bumuo ng smeta gamit ang mga norma ng GESN sa pamamagitan ng resource method)
Bill of Quantities (BOQ): Post the positions into the lokalnaya smeta

Bakit: The lokalnaya smeta is the document every summary above it is built from: object smetas sum the locals and the svodnyy smetnyy raschet sums the objects. A wrong quantity or a wrong norm number here is wrong in every summary above it, and the summaries are what the customer actually reads.

PapasokQuantities from the takeoffResource-built ratesLumalabasLokalnaya smetaSections matching the drawings
6

Apply NR and SP on the base each is calculated from

Bill of Quantities (BOQ)

In the bill's Markups & Overheads panel, apply the Russian template to bring in the national stack in its order, overheads (NR), estimated profit (SP), the reserve line and NDS, then set the NR and SP rate for each type of work from the norms rather than leaving one rate on the whole bill. Read what each line is applied to: the shipped template carries NR and SP as an effective percentage of direct cost, because a bill markup can take direct cost or the running total as its base and payroll is neither.

Screenshot, hakbang 6: Apply NR and SP on the base each is calculated from (Bill of Quantities (BOQ), Bumuo ng smeta gamit ang mga norma ng GESN sa pamamagitan ng resource method)
Bill of Quantities (BOQ): Apply NR and SP on the base each is calculated from

Bakit: The norm sets NR and SP against payroll, worker wages plus machine operator wages, and by type of work, not against the position total. An effective percentage of direct cost keeps the bill total right for a typical work mix and wrong in its sensitivity, so on a bill whose labour share is far from typical rebuild the markup on the resource decomposition rather than trusting the line. Applying either to material or equipment cost inflates the smeta in a way a reviewer finds by arithmetic alone.

PapasokType of work per sectionLabour cost per positionLumalabasNR applied by tradeSP applied by trade
7

Read the resource summary the method produces

Buod ng Resource

Open the summary the smeta rolls up to: total man hours, machine hours by machine type and material quantities by nomenclature across the whole estimate, and read it against what the job plausibly needs in crews, plant and deliveries.

Screenshot, hakbang 7: Read the resource summary the method produces (Buod ng Resource, Bumuo ng smeta gamit ang mga norma ng GESN sa pamamagitan ng resource method)
Buod ng Resource: Read the resource summary the method produces

Bakit: The output of the resource method is not only a total in roubles. The same summary is what the works schedule, the crew plan and the material procurement are built from, and it is the norm baseline that the M-29 material reconciliation will later compare actual consumption against.

PapasokCompleted smetaMaterial nomenclatureLumalabasMan hours and machine hoursMaterial quantities by nomenclature
Mga Module

Mga Module sa Playbook na Ito

6 / 190 na module ng platform

The market this case is written for

Russia

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • GESN/FER
  • KS-2 / KS-3

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Higit pa sa Pag-estimate at pagpepresyo

Pag-estimate at pagpepresyo

Suriin ang Estimate Bago Mo Ipadala

Isailalim ang napresyuhang bill sa mga validation rule, linisin ang bawat babala at error, t…

3 hakbang8 minBukas
Pag-estimate at pagpepresyo

Mag-estimate Mula sa Cost Database

Kumuha ng mga napresyuhang item mula sa tunay na cost database, buuin ang bill mula sa mga i…

4 hakbang12 minBukas