Compare bids and award

Take a folder of returned tenders that never quite match, strip them back to the same scope, and hand the client an award call that survives scrutiny.

3 steps12 minGeneral contractorCost consultant / QSProject / construction managerDeveloper / client

How it works, step by step

3 steps across the platform - what you do at each one, and why it matters.

1

Open the tender package

Tendering

Pull up the tender record, verify the bidder list against who was actually invited, and check that every return prices the same issued schedule and the same drawing revision.

Why: Bidders working from an earlier drawing set or a trimmed schedule are not competing on the same job. Nailing the common baseline now is what keeps the whole comparison downstream honest.

InReturned bidsInvited bidder listIssued pricing scheduleOutConfirmed common baselineVerified bidder list
2

Level the bids

Bid management

Set the returns out column by column, then push every qualification, exclusion and provisional sum back into the price so line rates read against each other. Mark the gaps where a bidder simply left scope out.

Why: The lowest headline number often belongs to whoever forgot the most. Once the missing builders work and the daywork assumptions go back in, the genuinely keen bid is usually a different one.

InVerified bidsBidder qualificationsProvisional sumsOutLevelled bid comparisonFlagged scope gaps
3

Recommend the award

Reports

Write up the recommendation: the levelled spread, coverage against the full scope, any commercial or programme risk, and the bidder you would appoint with the reasoning set beside the figures.

Why: An award gets second-guessed by a director, an auditor, or the losing bidder. A short paper showing both the math and the judgement behind the pick closes that conversation before it starts.

InLevelled comparisonScope coverageCommercial risk notesOutAward recommendationPreferred bidder