All casesOpen demo
Cases / Estimating & costing
Estimating & costing

Price a building from a PDF

Start from a flat PDF drawing and finish with a priced, validated estimate ready to export. You measure it, price it, check it and hand it on. Five steps, end to end.

5 steps15 minGeneral contractorSpecialist subcontractorCost consultant / QS

How it works, step by step

5 steps across the platform - what you do at each one, and why it matters.

1

Upload the PDF drawing

Documents

Open the project files area and drag the PDF plan you intend to price onto it. The drawing is filed against the project so takeoff, pricing and every export can reach the exact same sheet.

Why: Every number downstream traces back to this one drawing. Filing it against the project up front keeps the measurement, the bill and the outputs locked to a single revision rather than scattered copies.

InPDF drawingProject recordOutFiled drawingLinked to project
2

Measure quantities on the PDF

Takeoff

Open the sheet in Takeoff and set the scale first, then measure the areas, running lengths and counts you need. Let auto-measure pick up repeated items like doors and columns, and eyeball each one before you accept it.

Why: Quantities carry the whole estimate, so a slip here multiplies through every rate. Measuring on the drawing itself means each figure points back to a line you can show the client, not a number from thin air.

InFiled PDF drawingSet drawing scaleOutMeasured quantitiesTakeoff markups
3

Build the priced BOQ

BOQ

Send the measured quantities into bill positions, then attach unit rates from the cost database or your own assemblies. The total updates the moment a rate lands.

Why: The bill of quantities is where the drawing turns into money. Rates and built-up assemblies roll into a total you can break down line by line and defend across a negotiating table.

InMeasured quantitiesCost database ratesOutPriced BOQEstimate total
4

Validate the estimate

Validation

Run the rule sets across the finished bill. It hunts for blank quantities, zero rates and duplicate lines, and where they apply it checks structure rules such as the DIN 276 cost groups.

Why: A mistake caught at your desk costs minutes; the same mistake caught by the client costs credibility. The traffic-light report points straight at the line and the rule that tripped.

InPriced BOQValidation rule setsOutTraffic-light reportFlagged issues
5

Export the priced bill

Reports

Produce the output the next person needs from Reports: a PDF summary for the client, an Excel sheet for the commercial team or a GAEB file to push into tendering.

Why: An estimate only pays off once somebody else can open it. Exporting to an open format keeps the figures portable between tools and keeps the underlying data yours.

InValidated BOQChosen export formatOutPDF summaryExcel or GAEB file

More in Estimating & costing