Cases / Commercial & contracts
Commercial & contracts

Compose the BDI under Acordao 2622/2013-TCU

Move administracao local out of the BDI and into the orcamento, price risk and guarantees where they belong, set the tax term without the taxes that may not be in it, and publish a demonstrativo that shows every figure against the reference range.

6 steps16 minGeneral contractorCost consultancy / QS practiceSpecialist subcontractor

How it works, step by step

6 steps across the platform - what you do at each one, and why it matters.

1

Take administracao local out of the BDI

Preliminaries

Price the site management, the canteiro de obras, the mobilizacao and the desmobilizacao as their own items with a quantity and a duration, and take the same cost out of the percentage. Keep the monthly items monthly, so a job that runs long is paid for the months it actually ran.

Preliminaries screen in OpenConstructionERP: Take administracao local out of the BDI (Compose the BDI under Acordao 2622/2013-TCU)
Preliminaries: Take administracao local out of the BDI

Why: Acordao 2622/2013-TCU holds that administracao local is a direct cost of this job and belongs in the orcamento where it can be measured, not inside a BDI applied to work executed. The practical difference shows up on a job that is delayed for reasons that are not yours: as a measured monthly item the extra months are payable, as a percentage of the same work they are not, because the work did not grow.

InSite team and site facilitiesContract durationOutAdministracao local as bill itemsSame cost out of the BDI
2

Price the risco, the seguro and the garantia

Allowances & Contingency

Set the three terms separately and take each from something real: the risk term from the register of what could go wrong on this job, the insurance term from a broker's quote for this scope, the guarantee term from what the bank charges you for a performance bond of this size and length.

Allowances & Contingency screen in OpenConstructionERP: Price the risco, the seguro and the garantia (Compose the BDI under Acordao 2622/2013-TCU)
Allowances & Contingency: Price the risco, the seguro and the garantia

Why: These three are the terms most often copied from the last job, and they are the ones that vary most between jobs. A guarantee priced on a two year contract and reused on a five year one is wrong by a factor the profit term cannot absorb, and it is invisible because the BDI still totals to a number that looks normal.

InRisk register for the jobInsurance and guarantee quotesOutRisk, insurance and guarantee ratesReason recorded per rate
3

Set the tax term, and only the taxes that belong in it

BOQ

Build the tax term from the levies that fall on the invoice: the municipal service tax at the rate of the city where the work is done, the federal turnover contributions at the rate your regime charges, and the payroll contribution on turnover where the company has taken that option. Record which taxes you deliberately kept out and why.

BOQ screen in OpenConstructionERP: Set the tax term, and only the taxes that belong in it (Compose the BDI under Acordao 2622/2013-TCU)
BOQ: Set the tax term, and only the taxes that belong in it

Why: Acordao 2622/2013-TCU holds that corporate income tax and the social contribution on net profit do not belong in the BDI, because they are levied on the result rather than on the invoice, and a contractor who includes them is paid for them by the client and again out of margin. Municipal rates also differ from city to city, so a term carried over from the last job is a real error even when the arithmetic is perfect.

InTax regime of the companyRate of the city where the work isOutTax term of the BDI rateTaxes deliberately left out
4

Assemble the BDI in the markups panel

BOQ

In the bill's Markups & Overheads panel enter the central office overhead, the risk, the insurance, the guarantee, the finance charge, the profit and the tax term as separate figures, so the BDI is composed rather than typed. Check that the tax term divides rather than multiplies, because it is charged on the price you invoice and not on the cost you carry.

BOQ screen in OpenConstructionERP: Assemble the BDI in the markups panel (Compose the BDI under Acordao 2622/2013-TCU)
BOQ: Assemble the BDI in the markups panel

Why: A BDI entered as one number cannot be checked, cannot be adjusted term by term when the client questions one of them, and hides the single most common arithmetic error in Brazilian estimating, which is applying the tax term as a simple addition. Composed, the same figure is a short table anybody can follow.

InRisk, insurance and guarantee ratesTax term of the BDI rateOutBDI rate applied to the billPrice with the markup visible
5

Place every term against the reference range

Basis of Estimate

Record on the basis of estimate where each term sits relative to the reference range published for this type of work, and write a sentence for any term that sits outside it. Say what about this job puts it there, in terms of the job rather than of the company.

Why: The ranges in Acordao 2622/2013-TCU are the first thing an analyst reaches for, and a term above the range with a written reason is a discussion while the same term without one is a finding. Writing it during the estimate costs a paragraph, writing it afterwards means reconstructing a decision nobody remembers making.

InBDI rate applied to the billReference range for this work typeOutJustification report per termTerms outside the range named
6

Publish the demonstrativo with the proposal

Reports

Export the BDI as its own sheet showing every term and the formula that combines them, and send it with the proposal rather than on request. Where the edital asks for a differentiated BDI for supplied equipment, publish that one beside it instead of averaging the two.

Reports screen in OpenConstructionERP: Publish the demonstrativo with the proposal (Compose the BDI under Acordao 2622/2013-TCU)
Reports: Publish the demonstrativo with the proposal

Why: A proposal carrying a bare percentage invites the analyst to reconstruct it, and their reconstruction will not be yours. Published as a sheet, the same figure arrives already explained, and a differentiated BDI for equipment supply is either declared or it is treated as an attempt to earn a construction markup on a purchase.

InJustification report per termPrice with the markup visibleOutBDI demonstrativo for the proposalOne version everyone quotes
Modules

Modules in this playbook

5 / 190 platform modules

The market this case is written for

Brazil

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • Lei 14.133
  • SINAPI
  • ABNT NBR 12721

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

More in Commercial & contracts

Commercial & contracts

Run a subcontractor package

Award a trade package to a subcontractor, place it on a subcontract with a schedule of valu…

3 steps11 minOpen