Cases / Quality & safety
Quality & safety

Run a safety walk and log observations

Catch the hazards before they hurt someone: walk the site against a checklist, raise the unsafe conditions as trackable actions, and report the trend to the team.

3 steps7 minGeneral contractorSpecialist subcontractor

How it works, step by step

3 steps across the platform - what you do at each one, and why it matters.

1

Walk the site against a checklist

Inspections

Walk the active areas against the safety checklist, record what you see with photos, and note the good practice as well as the hazards so the record is a fair picture of the site.

Why: A safety walk carried in your head is one nobody can act on or learn from. Recording each observation against a checklist is what turns a stroll round site into evidence and action.

InSafety checklistWork areasOutRecorded observationsPositive and negative findings
2

Raise the unsafe conditions

Non-conformance

Turn each unsafe condition into a tracked action against the party that owns it, with a date to close by and the risk noted, so the hazard is chased down rather than forgotten.

Non-conformance screen in OpenConstructionERP: raise the unsafe conditions

Why: An observed hazard with no owner and no date is one that is still there next week. Raising it as a tracked action is what actually gets the guard rail fixed and gives you proof you acted.

InNegative findingsResponsible partiesOutLogged actionsAssigned owners
3

Report the safety trend

Reports

Report the observations and their close-out over time, showing which hazards recur and how fast actions are closed, and share it with the team at the next brief.

Why: One walk tells you about one day; the trend tells you whether the site is actually getting safer. Reporting it is what turns individual observations into the pressure that changes behaviour.

InLogged actionsPast observationsOutSafety trend reportOpen action list
Modules

Modules in this playbook

3 / 190 platform modules

More in Quality & safety

Quality & safety

Toolbox talk and safety check

Brief the crew on the hazards this shift actually carries, capture who was there, then prov…

2 steps8 minOpen