Close the day out properly: record the diary, book the labour and plant hours, upload the p…
Follow a design change from the drawing that carries it, through the site instruction, to the record that proves the right version was actually built.
3 steps across the platform - what you do at each one, and why it matters.
Register the revised drawing carrying the design change, mark the previous version superseded and note plainly what moved and why.
Why: A change that only exists as a verbal instruction on site has no paper trail behind it if the cost or the time is ever questioned.
Log the instruction that authorises the change on site, tied to the drawing revision that carries it, with the likely cost and time impact noted.
Why: Tying the instruction to the exact revision is what stops a dispute later over which version of the change was actually agreed.
Inspect the affected work against the revised drawing and record that what went in matches the change, not the superseded detail.
Why: A change is only real once it is confirmed built. Verifying it on site is what closes the loop between the drawing, the instruction and the finished work.
3 / 184 platform modules
Close the day out properly: record the diary, book the labour and plant hours, upload the p…
Turn a question from the working face into a tracked request, drive it to the party who own…
Turn instructed extra work into a claim that gets paid: record the labour, plant and materi…