The legal text on this page is available in English only.
This Cookie Policy explains how OpenConstructionERP ("the Software") and the hosted instance operated by DataDrivenConstruction ("DDC") use cookies and similar browser-storage technologies. It is intended to satisfy the baseline transparency obligations of the EU ePrivacy Directive 2002/58/EC (as implemented by member-state law), the UK PECR 2003, and applicable US state privacy laws.
The Software uses the following categories of client-side storage. No third-party advertising or tracking cookies are set.
| Name | Type | Purpose | Retention | Strictly necessary? |
|---|---|---|---|---|
oe_access_token | localStorage | JWT bearer for API auth | Until logout | Yes |
oe_refresh_token | localStorage | Refresh JWT | Until logout | Yes |
oe_locale | localStorage | UI language preference | 1 year | Yes |
oe_theme | localStorage | Light / dark mode | 1 year | Yes |
oe_layout | localStorage | Sidebar widths, panel sizes | 1 year | No (functional) |
oe_widget_settings | localStorage | Dashboard widget layout | 1 year | No (functional) |
oe_consent | localStorage | Cookie-banner decision | 1 year | Yes |
All entries are first-party and remain on your device. The hosted instance does not embed third-party analytics cookies by default.
Self-hosters who enable optional integrations (for example, a Sentry error-reporting DSN or a Matomo analytics script) should extend this page with the relevant cookie names and retentions.
oe_consent entry; the banner will reappear on next visit.The Software respects the Sec-GPC HTTP header and the navigator.doNotTrack signal where an interpretation exists under applicable law (primarily Colorado, Connecticut, and California). When these signals are present, DDC does not enable optional analytics integrations for your session.
We may update this policy when we add or remove storage entries. Material changes are listed in the release notes.