Presyuhan ang isang orçamento ng kalsada mula sa SICRO base

I-load ang SICRO para sa estado at sa reference month, buuin ang oras na gastos ng bawat makina, gawing transport item ang mga haul distance, buuin ang mga serviço sa SICRO coefficient, at presyuhan ang orçamento na may nakasulat na mga assumption.

6 hakbang20 minGeneral ContractorCost Consultancy / QS PracticeEspesyalistang Subcontractor

Paano ito gumagana, hakbang-hakbang

6 hakbang sa buong platform - ano ang gagawin mo sa bawat isa at bakit mahalaga ito.

1

Bring in SICRO for the state and the reference month

Database ng Gastos

Load the SICRO tables for the state the road runs through and the reference month the edital names, and keep both on the record with the prices. Load the matching equipment and insumo tables rather than mixing a new servico table with equipment costs you already had.

Bakit: SICRO prices differ by state because fuel, aggregate and labour do, and a road that crosses a boundary can legitimately need two tables. Fixing which table applies to which stretch now is a paragraph. Doing it after the proposals are open is a dispute in which both sides are quoting real published prices.

PapasokSICRO reference pricesReference date the edital namesLumalabasPriced reference base loadedState and reference month recorded
2

Build the hourly cost of every machine

Kagamitan at Fleet

For each machine the method needs, set the ownership cost, the fuel and lubricant, the maintenance and the operator, and split the result into a productive hour and an idle hour. Do it for the plant that waits as well as the plant that works, the water truck and the roller included.

Bakit: On a road contract the machines are the estimate. A single hourly cost averaged across productive and idle time prices a fleet that is always either working or parked, and no earthworks operation behaves that way. The two-rate split is what lets the composicao say honestly that the excavator drives the cycle and the trucks wait on it.

PapasokMachines the method needsOwnership and operating ratesLumalabasHourly cost per machineProductive and idle hours separated
3

Turn the haul distances into measured transport

Panukat ng Dami

Measure what moves and how far: cut to fill, borrow pit to embankment, quarry to plant, plant to laydown. Work out the distancia media de transporte for each pairing and carry it as a measured item rather than as a note beside a volume.

Bakit: Transport is often the largest single cost on an earthworks job and it is the one most often taken from a drawing rather than from the ground. A DMT measured against real borrow pits and real access roads is a number both sides can check. A DMT assumed to be the straight-line distance is a claim waiting to happen the first week the trucks run.

PapasokEarthwork quantities by originHaul distance to each destinationLumalabasDistancia media de transporteTransport items measured
4

Compose each servico around the machine that sets the pace

Mga Assembly

Build each servico as an assembly whose production per hour comes from one machine, and let the rest of the fleet follow it as productive or idle hours. Keep the material, the labour and the transport as their own components so the cost of a cubic metre can be read apart from the cost of moving it.

Bakit: A road composicao where every machine works at full production prices a fleet that never queues, and it is always the cheapest way to be wrong. Naming the machine that sets the pace makes the estimate say what the site will do, and it tells the planner which single piece of plant the programme depends on.

PapasokHourly cost per machineSICRO coefficients per servicoLumalabasComposicao with a built-up rateProduction per hour on the record
5

Price the orcamento and total it per lote

Bill of Quantities (BOQ)

Apply the composicoes to the positions, carry the transport as its own set of items, and total the bill by lote and by segment so each stretch can be read on its own. Check that the earthworks balance in the bill matches the one the transport was measured from.

Bakit: A road contract is usually awarded and measured by lote, so a total that only exists for the whole scheme has to be rebuilt by hand for every conversation. And an earthworks balance that disagrees with the transport measured against it means one of the two is describing a road that was not designed.

PapasokComposicao with a built-up rateTransport items measuredLumalabasPriced bill positionsTotal per lote
6

Record the SICRO reference and the haul assumptions

Batayan ng Estimate

Write down which SICRO table and month priced the work, which borrow pits and quarries the transport assumed, and which of those are not yet licensed or contracted. Name the assumptions that would move the price if they turn out differently.

Bakit: The borrow pit is the assumption that changes most often and costs most when it does. Named in the basis of estimate before the bid, a pit that turns out to be unavailable is a variation with a documented starting point. Unnamed, it is a cost the contractor carries while explaining that everybody knew.

PapasokDistancia media de transporteState and reference month recordedLumalabasAssumptions reportRisk items named
Mga Module

Mga Module sa Playbook na Ito

6 / 190 na module ng platform

The market this case is written for

Brazil

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • Lei 14.133
  • SINAPI
  • ABNT NBR 12721

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Higit pa sa Pag-estimate at pagpepresyo

Pag-estimate at pagpepresyo

Suriin ang Estimate Bago Mo Ipadala

Isailalim ang napresyuhang bill sa mga validation rule, linisin ang bawat babala at error, t…

3 hakbang8 minBukas
Pag-estimate at pagpepresyo

Mag-estimate Mula sa Cost Database

Kumuha ng mga napresyuhang item mula sa tunay na cost database, buuin ang bill mula sa mga i…

4 hakbang12 minBukas