Mga Kaso / Pag-estimate at pagpepresyo
Pag-estimate at pagpepresyo

Kunin ang mga dami mula sa isang PDF plan

Dumarating ang tender bilang mga PDF sheet na walang modelo sa likod nito. I-calibrate ang plano, sukatin ang haba, lawak at bilang sa screen, at ilagay ang mga ito bilang mga BOQ position kung saan ang bawat numero ay bumabalik pa rin sa linyang iginuhit mo.

7 hakbang14 minEspesyalistang SubcontractorGeneral ContractorCost Consultancy / QS Practice

Paano ito gumagana, hakbang-hakbang

7 hakbang sa buong platform - ano ang gagawin mo sa bawat isa at bakit mahalaga ito.

1

File the tender plan set

Mga Dokumento

Put the PDF sheets the client issued into the project files, each carrying the sheet number and revision it was issued under. Takeoff picks the file up from here, so you measure the drawing on record rather than a copy out of an inbox.

Screenshot, hakbang 1: File the tender plan set (Mga Dokumento, Kunin ang mga dami mula sa isang PDF plan)
Mga Dokumento: File the tender plan set

Bakit: An Aufmass can only be checked if the reader can find the sheet it came from. Filing the issued revision first means every quantity you produce later names a drawing that still exists in the same form.

PapasokTender plan set (PDF)Sheet and revision listLumalabasFiled drawing revisionSheets ready for takeoff
2

Calibrate the plan scale

Sukat ng PDF

Open the sheet on the Measurements tab and calibrate before you draw anything. Click the two ends of a dimension the plan already states, type its real length, and every later measurement converts to metres. On a clean vector sheet you can take the stated scale, 1:50 or 1:100, as a preset instead.

Screenshot, hakbang 2: Calibrate the plan scale (Sukat ng PDF, Kunin ang mga dami mula sa isang PDF plan)
Sukat ng PDF: Calibrate the plan scale

Bakit: A plan that has been through a plotter or a scanner is rarely at the scale printed on it. Calibrating against a stated dimension costs a minute, while a scale two percent out multiplies quietly through every area on the sheet and only surfaces at Abrechnung.

PapasokFiled PDF sheetDimension stated on the planLumalabasCalibrated scaleMeasurable sheet
3

Measure lengths, areas and counts

Sukat ng PDF

Work the sheet trade by trade. Area for floors, screed and wall faces, distance or polyline for skirting, kerb and pipe runs, count for doors, sockets and fittings. Give an area a depth where you need the volume, and take openings off the way the rules for that trade require.

Bakit: The rate you are pricing is a rate per the quantity the contract measures, and VOB/C sets those rules trade by trade. Measuring the way the trade is settled keeps the figure in your offer and the figure in the final account the same figure.

PapasokCalibrated sheetMeasurement rules of the tradeLumalabasMeasured lengths and areasCounted items
4

Name and group every measurement

Sukat ng PDF

In the measurement ledger give each entry a description a stranger would recognise, the storey or room it sits in, and a group per trade. The ledger keeps every entry beside its shape on the sheet, so clicking the line takes you back to the drawing.

Bakit: A checkable Aufmass is one where a number leads back to a named measurement on a named sheet. Naming costs seconds now and saves the afternoon when the client asks where a figure came from.

PapasokRaw measurementsTrade breakdownLumalabasNamed measurement ledgerGrouped by trade
5

Review the quantity rollup

Panukat ng Dami

Open the measured quantities register, which rolls up everything captured so far grouped by unit, trade or source with running totals. Filter it down to one drawing or one trade and read the totals against the building you expect. Export the rollup when somebody else has to check it.

Screenshot, hakbang 5: Review the quantity rollup (Panukat ng Dami, Kunin ang mga dami mula sa isang PDF plan)
Panukat ng Dami: Review the quantity rollup

Bakit: A storey measured twice and a storey missed altogether both look plausible on the sheet and obvious in the total. This is the last cheap place to catch either, before a wrong quantity gets a price and leaves the office in your offer.

PapasokLedger entriesScope you expect to priceLumalabasChecked quantity rollupRollup export
6

Land them as BOQ positions

Bill of Quantities (BOQ)

Confirm the measurements you trust into the bill. Each one becomes a position carrying its quantity and unit, and it stays linked to the measurement on the drawing, so a reissued sheet updates the quantity in place instead of sending you back to the start of the takeoff.

Screenshot, hakbang 6: Land them as BOQ positions (Bill of Quantities (BOQ), Kunin ang mga dami mula sa isang PDF plan)
Bill of Quantities (BOQ): Land them as BOQ positions

Bakit: This is where a measured building turns into something you can price. Because each position keeps its link, the chain from the money back to the line on the plan stays intact, which is exactly what a client checking your Aufmass asks to see.

PapasokConfirmed measurementsTarget billLumalabasPositions with quantitiesLink back to the drawing
7

Issue the bill as GAEB

Bill of Quantities (BOQ)

Export the finished bill as a GAEB XML file straight from the BOQ editor. What leaves the office is the same structure you built from the takeoff, positions, quantities and units, in the exchange format every German AVA package opens without retyping.

Bakit: A bill that travels as GAEB stays a bill instead of becoming a PDF someone retypes with new mistakes. The quantities you measured arrive in the other side's software as data, and the Aufmass chain behind them survives the handover.

PapasokPositions with quantitiesRecipient's GAEB softwareLumalabasGAEB XML fileBill issued for pricing
Mga Module

Mga Module sa Playbook na Ito

4 / 190 na module ng platform

The market this case is written for

Germany

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • DIN 276
  • GAEB XML
  • VOB/B

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

Higit pa sa Pag-estimate at pagpepresyo

Pag-estimate at pagpepresyo

Estimate from a cost database

Pull priced items from a real cost database, build the bill from them, bundle recurring bui…

4 hakbang12 minBukas
Pag-estimate at pagpepresyo

Set contingency from cost risk

Turn a single-point estimate into a range, run a Monte Carlo over the genuinely uncertain l…

3 hakbang11 minBukas