Take off quantities from a PDF plan

The tender arrives as PDF sheets with no model behind them. Calibrate the plan, measure lengths, areas and counts on screen, and land them as BOQ positions where every number still points back to the line you drew.

7 个步骤14 分钟专业分包商总承包商造价咨询 / 工料测量顾问

运作方式,逐步说明

贯穿平台的 7 个步骤 - 每一步做什么,以及为什么重要。

1

File the tender plan set

文档

Put the PDF sheets the client issued into the project files, each carrying the sheet number and revision it was issued under. Takeoff picks the file up from here, so you measure the drawing on record rather than a copy out of an inbox.

原因: An Aufmass can only be checked if the reader can find the sheet it came from. Filing the issued revision first means every quantity you produce later names a drawing that still exists in the same form.

输入Tender plan set (PDF)Sheet and revision list成果Filed drawing revisionSheets ready for takeoff
2

Calibrate the plan scale

PDF 测量

Open the sheet on the Measurements tab and calibrate before you draw anything. Click the two ends of a dimension the plan already states, type its real length, and every later measurement converts to metres. On a clean vector sheet you can take the stated scale, 1:50 or 1:100, as a preset instead.

原因: A plan that has been through a plotter or a scanner is rarely at the scale printed on it. Calibrating against a stated dimension costs a minute, while a scale two percent out multiplies quietly through every area on the sheet and only surfaces at Abrechnung.

输入Filed PDF sheetDimension stated on the plan成果Calibrated scaleMeasurable sheet
3

Measure lengths, areas and counts

PDF 测量

Work the sheet trade by trade. Area for floors, screed and wall faces, distance or polyline for skirting, kerb and pipe runs, count for doors, sockets and fittings. Give an area a depth where you need the volume, and take openings off the way the rules for that trade require.

原因: The rate you are pricing is a rate per the quantity the contract measures, and VOB/C sets those rules trade by trade. Measuring the way the trade is settled keeps the figure in your offer and the figure in the final account the same figure.

输入Calibrated sheetMeasurement rules of the trade成果Measured lengths and areasCounted items
4

Name and group every measurement

PDF 测量

In the measurement ledger give each entry a description a stranger would recognise, the storey or room it sits in, and a group per trade. The ledger keeps every entry beside its shape on the sheet, so clicking the line takes you back to the drawing.

原因: A checkable Aufmass is one where a number leads back to a named measurement on a named sheet. Naming costs seconds now and saves the afternoon when the client asks where a figure came from.

输入Raw measurementsTrade breakdown成果Named measurement ledgerGrouped by trade
5

Review the quantity rollup

工程量计算

Open the measured quantities register, which rolls up everything captured so far grouped by unit, trade or source with running totals. Filter it down to one drawing or one trade and read the totals against the building you expect. Export the rollup when somebody else has to check it.

原因: A storey measured twice and a storey missed altogether both look plausible on the sheet and obvious in the total. This is the last cheap place to catch either, before a wrong quantity gets a price and leaves the office in your offer.

输入Ledger entriesScope you expect to price成果Checked quantity rollupRollup export
6

Land them as BOQ positions

工程量清单

Confirm the measurements you trust into the bill. Each one becomes a position carrying its quantity and unit, and it stays linked to the measurement on the drawing, so a reissued sheet updates the quantity in place instead of sending you back to the start of the takeoff.

原因: This is where a measured building turns into something you can price. Because each position keeps its link, the chain from the money back to the line on the plan stays intact, which is exactly what a client checking your Aufmass asks to see.

输入Confirmed measurementsTarget bill成果Positions with quantitiesLink back to the drawing
7

Issue the bill as GAEB

工程量清单

Export the finished bill as a GAEB XML file straight from the BOQ editor. What leaves the office is the same structure you built from the takeoff, positions, quantities and units, in the exchange format every German AVA package opens without retyping.

原因: A bill that travels as GAEB stays a bill instead of becoming a PDF someone retypes with new mistakes. The quantities you measured arrive in the other side's software as data, and the Aufmass chain behind them survives the handover.

输入Positions with quantitiesRecipient's GAEB software成果GAEB XML fileBill issued for pricing
模块

此方案使用的模块

184 个平台模块中的 4

更多 估算与成本 案例

估算与成本

发出估算前进行核查

让已计价的清单通过核查规则,清除所有警告和错误,再导出一份可以直接交给客户的干净报告。

3 个步骤8 分钟打开
估算与成本

根据成本数据库进行估算

从真实的成本数据库中提取已计价项目,据此构建清单,把常用的组合做法打包成组合定额,提交投标数字前先做校核。

4 个步骤12 分钟打开
估算与成本

根据成本风险设定应急费

把单点估算转化为区间估算,对真正存在不确定性的项目运行蒙特卡洛模拟,读取P50到P90的分布区间,设定一个可以逐项说清楚的应急费。

3 个步骤11 分钟打开