Mga Kaso / Pag-estimate at pagpepresyo
Pag-estimate at pagpepresyo

Take off quantities from a PDF plan

The tender arrives as PDF sheets with no model behind them. Calibrate the plan, measure lengths, areas and counts on screen, and land them as BOQ positions where every number still points back to the line you drew.

7 hakbang14 minEspesyalistang SubcontractorGeneral ContractorCost Consultancy / QS Practice

Paano ito gumagana, hakbang-hakbang

7 hakbang sa buong platform - ano ang gagawin mo sa bawat isa at bakit mahalaga ito.

1

File the tender plan set

Mga Dokumento

Put the PDF sheets the client issued into the project files, each carrying the sheet number and revision it was issued under. Takeoff picks the file up from here, so you measure the drawing on record rather than a copy out of an inbox.

Bakit: An Aufmass can only be checked if the reader can find the sheet it came from. Filing the issued revision first means every quantity you produce later names a drawing that still exists in the same form.

PapasokTender plan set (PDF)Sheet and revision listLumalabasFiled drawing revisionSheets ready for takeoff
2

Calibrate the plan scale

Sukat ng PDF

Open the sheet on the Measurements tab and calibrate before you draw anything. Click the two ends of a dimension the plan already states, type its real length, and every later measurement converts to metres. On a clean vector sheet you can take the stated scale, 1:50 or 1:100, as a preset instead.

Bakit: A plan that has been through a plotter or a scanner is rarely at the scale printed on it. Calibrating against a stated dimension costs a minute, while a scale two percent out multiplies quietly through every area on the sheet and only surfaces at Abrechnung.

PapasokFiled PDF sheetDimension stated on the planLumalabasCalibrated scaleMeasurable sheet
3

Measure lengths, areas and counts

Sukat ng PDF

Work the sheet trade by trade. Area for floors, screed and wall faces, distance or polyline for skirting, kerb and pipe runs, count for doors, sockets and fittings. Give an area a depth where you need the volume, and take openings off the way the rules for that trade require.

Bakit: The rate you are pricing is a rate per the quantity the contract measures, and VOB/C sets those rules trade by trade. Measuring the way the trade is settled keeps the figure in your offer and the figure in the final account the same figure.

PapasokCalibrated sheetMeasurement rules of the tradeLumalabasMeasured lengths and areasCounted items
4

Name and group every measurement

Sukat ng PDF

In the measurement ledger give each entry a description a stranger would recognise, the storey or room it sits in, and a group per trade. The ledger keeps every entry beside its shape on the sheet, so clicking the line takes you back to the drawing.

Bakit: A checkable Aufmass is one where a number leads back to a named measurement on a named sheet. Naming costs seconds now and saves the afternoon when the client asks where a figure came from.

PapasokRaw measurementsTrade breakdownLumalabasNamed measurement ledgerGrouped by trade
5

Review the quantity rollup

Panukat ng Dami

Open the measured quantities register, which rolls up everything captured so far grouped by unit, trade or source with running totals. Filter it down to one drawing or one trade and read the totals against the building you expect. Export the rollup when somebody else has to check it.

Bakit: A storey measured twice and a storey missed altogether both look plausible on the sheet and obvious in the total. This is the last cheap place to catch either, before a wrong quantity gets a price and leaves the office in your offer.

PapasokLedger entriesScope you expect to priceLumalabasChecked quantity rollupRollup export
6

Land them as BOQ positions

Bill of Quantities (BOQ)

Confirm the measurements you trust into the bill. Each one becomes a position carrying its quantity and unit, and it stays linked to the measurement on the drawing, so a reissued sheet updates the quantity in place instead of sending you back to the start of the takeoff.

Bakit: This is where a measured building turns into something you can price. Because each position keeps its link, the chain from the money back to the line on the plan stays intact, which is exactly what a client checking your Aufmass asks to see.

PapasokConfirmed measurementsTarget billLumalabasPositions with quantitiesLink back to the drawing
7

Issue the bill as GAEB

Bill of Quantities (BOQ)

Export the finished bill as a GAEB XML file straight from the BOQ editor. What leaves the office is the same structure you built from the takeoff, positions, quantities and units, in the exchange format every German AVA package opens without retyping.

Bakit: A bill that travels as GAEB stays a bill instead of becoming a PDF someone retypes with new mistakes. The quantities you measured arrive in the other side's software as data, and the Aufmass chain behind them survives the handover.

PapasokPositions with quantitiesRecipient's GAEB softwareLumalabasGAEB XML fileBill issued for pricing
Mga Module

Mga Module sa Playbook na Ito

4 / 184 na module ng platform

Higit pa sa Pag-estimate at pagpepresyo

Pag-estimate at pagpepresyo

Suriin ang Estimate Bago Mo Ipadala

Isailalim ang napresyuhang bill sa mga validation rule, linisin ang bawat babala at error, t…

3 hakbang8 minBukas
Pag-estimate at pagpepresyo

Mag-estimate Mula sa Cost Database

Kumuha ng mga napresyuhang item mula sa tunay na cost database, buuin ang bill mula sa mga i…

4 hakbang12 minBukas