Raise a design query from BIM coordination

Turn a conflict spotted in the federated model into a formal design query, get it answered by the right discipline, and update the model once the fix lands.

3 steps10 minDesign / engineering practiceBIM / digital consultancyProject / construction management firm

How it works, step by step

3 steps across the platform - what you do at each one, and why it matters.

1

Review the federated model

Federations

Open the federation and look over the area the coordination meeting flagged, checking which discipline model actually needs to change.

Why: A query raised against the wrong discipline just bounces back a week later. Confirming the source in the federated view first is what gets it to the right desk the first time.

InFederated modelCoordination flagOutLocated conflictResponsible discipline
2

Raise the query

RFIs

Raise a formal request naming the element, the model view it was found in and the clash or conflict it causes, with a date tied to when the trade needs the answer.

RFIs screen in OpenConstructionERP: raise the query

Why: A conflict mentioned in a meeting and never formalised gets forgotten by the next one. A dated, written query is what keeps it moving until it is actually resolved.

InLocated conflictModel viewpointAnswer deadlineOutFormal design queryTracked RFI
3

Update the model

BIM

Once the answer lands, update the affected model and confirm the fix against the original conflict before it is reissued to the team.

Why: The query only closes the loop when the model itself reflects the fix. Otherwise the same conflict resurfaces the next time someone federates the set.

InQuery answerAffected modelOriginal conflictOutUpdated modelVerified fix
Modules

Modules in this playbook

3 / 190 platform modules

More in BIM & takeoff

BIM & takeoff

Get 6D carbon from a BIM model

Turn a converted BIM model into an embodied carbon footprint. Auto-enrich reads quantities…

5 steps12 minOpen
BIM & takeoff

Get quantities from a BIM model

Load a converted model, lift the element quantities straight off the geometry, carry them i…

3 steps12 minOpen
BIM & takeoff

Measure quantities from a DWG

Load a DWG, lock the scale against a known dimension, measure the areas, lengths and counts…

3 steps10 minOpen