Juhtumid / Hankemenetlus ja hankimine
Hankemenetlus ja hankimine

Hinnasta LOPSRM-i hange ja koosta precios unitarios

Loe convocatoria läbi, lae catálogo de conceptos sisse sellisena, nagu see välja anti, ehita üles põhikulud, mis on análisis de precios unitarios'e taga, aja kaskaadis järjest indirectos, financiamiento, utilidad ja cargos adicionales selles järjekorras, mille reglamento fikseerib, ning kontrolli pakkumust Mehhiko reeglistiku vastu enne, kui see kontorist välja läheb.

8 sammu25 minPeatöövõtjaErialaalltöövõtjaKulunõustamine / QS

Kuidas see töötab, samm-sammult

8 sammu läbi platvormi - mida teete igas ja miks see loeb.

1

Read the convocatoria before you price anything

Pakkumuste haldus

Register the opportunity with the four things that decide whether it is worth pricing: the contract type the LOPSRM allows and the convocatoria chose, precios unitarios, precio alzado or mixto; the anticipo offered; whether the contract provides for ajuste de costos; and the full list of documents the propuesta tecnica and the propuesta economica have to carry. Put the junta de aclaraciones and the closing in the calendar the day you register it.

Ekraanipilt, samm 1: Read the convocatoria before you price anything (Pakkumuste haldus, Hinnasta LOPSRM-i hange ja koosta precios unitarios)
Pakkumuste haldus: Read the convocatoria before you price anything

Miks: The contract type changes the whole shape of the work: on precios unitarios the quantities move and the rates do not, on precio alzado nothing moves and the risk of the quantity is yours. Firms that price first and read the bases afterwards discover this on a job they have already won, which is the most expensive order to discover it in.

SisendConvocatoria and bases de licitacionJunta de aclaraciones and closing datesVäljundBid or no bid, with a reasonDocument list the propuesta must carry
2

Load the catalogo exactly as it was issued

Mahutabel

Bring the catalogo de conceptos in with its claves, units and quantities untouched, and read each concepto against the especificacion that describes it. Where the description and the specification disagree, or a unit cannot carry the work described, that is a question for the junta de aclaraciones and not a decision for the estimator.

Ekraanipilt, samm 2: Load the catalogo exactly as it was issued (Mahutabel, Hinnasta LOPSRM-i hange ja koosta precios unitarios)
Mahutabel: Load the catalogo exactly as it was issued

Miks: The catalogo is the contract's spine for years: estimaciones, extraordinarios and the finiquito all read against it. A clave changed at tender to make the spreadsheet tidier is a mismatch that shows up in every future estimacion, and a question not asked at the junta becomes a risk you priced without knowing you had.

SisendCatalogo de conceptos as issuedEspecificaciones and drawingsVäljundCatalogo loaded line for lineQueries for the junta de aclaraciones
3

Build the mano de obra on a salario real, not a wage

Tööjõuhinnad

Set one rate per labour category and build it from the salario base plus the factor de salario real: the days actually worked in a year against the days paid, and the statutory employer charges on top, IMSS contributions and the housing fund contributions among them. Keep the factor and the year it was computed for beside the rate.

Ekraanipilt, samm 3: Build the mano de obra on a salario real, not a wage (Tööjõuhinnad, Hinnasta LOPSRM-i hange ja koosta precios unitarios)
Tööjõuhinnad: Build the mano de obra on a salario real, not a wage

Miks: The gap between a daily wage and a salario real is not a rounding difference, it is the whole margin on a labour heavy concepto. It also has to be defensible: the convocante can ask how the factor was arrived at, and a rate carried forward from a job three years ago answers that question with a number nobody can reconstruct.

SisendSalarios base by categoryStatutory charges on employmentVäljundSalario real per categoryThe factor written down and dated
4

Price the materiales at site and the maquinaria by the hour

Ressursikataloog

Hold the materiales at the cost of getting them onto the site, not at the yard price, and build each machine as a costo horario: ownership, depreciation, the money tied up in it, maintenance, fuel and the operator. Herramienta menor rides as its own charge on the labour rather than as a guess inside every concepto.

Ekraanipilt, samm 4: Price the materiales at site and the maquinaria by the hour (Ressursikataloog, Hinnasta LOPSRM-i hange ja koosta precios unitarios)
Ressursikataloog: Price the materiales at site and the maquinaria by the hour

Miks: The costo horario is the piece the convocante takes apart hardest, because it is where a proposal can be made to look cheap without changing anything visible. Built once from real ownership and running costs, it also survives the machine moving to the next job, which a rate invented for one tender never does.

SisendSupplier quotationsMachinery, its hours and its costsVäljundMateriales priced at the siteCosto horario per machine
5

Compose the costo directo of each concepto

Koostised

Build each concepto as an analisis: the quantity of each material per unit of work, the crew and the hours it takes, the machines and their hours. That sum is the costo directo, and it is the only part of the price that is composed rather than applied as a percentage.

Ekraanipilt, samm 5: Compose the costo directo of each concepto (Koostised, Hinnasta LOPSRM-i hange ja koosta precios unitarios)
Koostised: Compose the costo directo of each concepto

Miks: The mexico.apu_completeness rule in the validation engine exists because an incomplete analisis is the most common defect in a Mexican proposal and the easiest one to miss in your own work: a concepto with materials and no labour reads perfectly well until somebody asks who places it. Composed properly, the same analisis prices the extraordinarios later without being rebuilt.

SisendLabour, materials and machinery costsOutput per crew and per machineVäljundCosto directo per conceptoAnalisis a reviewer can take apart
6

Cascade indirectos, financiamiento, utilidad and cargos adicionales

Mahutabel

In the bill's Markups & Overheads panel, apply the four charges in the order the reglamento of the LOPSRM fixes and on the base each one is applied to: indirectos on the costo directo, covering oficinas centrales and oficinas de campo; financiamiento on the costo directo plus indirectos, from the gap between spending the money and being paid it; utilidad on the accumulated cost; cargos adicionales on the lot, which on a federal contract is where the cinco al millar inspection fee sits. Keep IVA off the unit price entirely.

Miks: The order is not a convention, it is what the integration means, and applying utilidad to the costo directo alone or folding the cinco al millar into indirectos produces a different total from the one the convocante will compute. Each percentage also has to be supported: the financiamiento comes from a cash flow against the programme, so it moves when the anticipo or the payment period moves, and a figure typed straight in cannot answer why.

SisendCosto directo across the catalogoOffice and site overhead, and the cash curveVäljundPrecio unitario integrated in orderAnalysis behind each percentage
7

Run the Mexican rule set before the proposal leaves

Valideerimine

Validate the priced catalogo against the mexico rule set: the APU completeness check on every concepto, the IVA rate check that will only accept sixteen, eight or zero, the retencion flag on subcontracted lines, and the CFDI issuer data the invoicing will need the moment the job is won. Fix the findings rather than filing them.

Ekraanipilt, samm 7: Run the Mexican rule set before the proposal leaves (Valideerimine, Hinnasta LOPSRM-i hange ja koosta precios unitarios)
Valideerimine: Run the Mexican rule set before the proposal leaves

Miks: A public proposal is discarded for a missing piece far more readily than it is discounted for a high price, and the pieces that go missing are the boring ones, an analisis with no labour line or an issuer field nobody filled in. Ten minutes against a rule set beats finding out at the apertura de proposiciones, where there is nothing to be done.

SisendFully priced catalogoIssuer fiscal dataVäljundFindings against the Mexican rule setGaps closed before submission
8

Assemble the propuesta and keep what you sent

Hanked

Put the two proposals together against the document list from the first step: the propuesta tecnica with the programmes of work, personnel and machinery, and the propuesta economica with the catalogo, the analisis, the basic costs and the explosion of insumos. Submission itself happens on the federal contracting platform the LOPSRM names, outside this product, so keep the exact package you uploaded here beside the tender record.

Ekraanipilt, samm 8: Assemble the propuesta and keep what you sent (Hanked, Hinnasta LOPSRM-i hange ja koosta precios unitarios)
Hanked: Assemble the propuesta and keep what you sent

Miks: What you submitted becomes the contract, and the version on somebody's laptop is not evidence of it. A year later, when an estimacion is queried or an extraordinario is priced, the argument is settled by the analisis that went in with the bid, and the firm that can produce it in a minute is negotiating from a different position from the one still looking for it.

SisendChecked catalogo and analisisCompany, tax and programme documentsVäljundPropuesta tecnica and economica assembledWhat was submitted, kept as issued
Moodulid

Selle tegevusjuhendi moodulid

7 / 190 platvormi moodulit

The market this case is written for

Mehhiko

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • CFDI 4.0
  • Ley de Obras Publicas

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Rohkem valdkonnas Hankemenetlus ja hankimine

Hankemenetlus ja hankimine

Vii läbi hange mahutabelist

Vii hinnastatud mahutabel turule: paketi see, kutsu alltöövõtjad, ühtlusta nende pakkumused…

5 sammu12 minAva
Hankemenetlus ja hankimine

Osta materjale mahutabelist

Osta kogused, mille juba hinnastasid: tõsta väljanõue mahutabelist, esita tellimus tarnijale…

4 sammu10 minAva
Hankemenetlus ja hankimine

Võrdle pakkumusi ja sõlmi hange

Võta kaust tagastatud pakkumustest, mis kunagi täpselt ei sobi, taanda need samale mahule ni…

3 sammu12 minAva