Scenariji / Procjena i troškovi
Procjena i troškovi

Podnesite NBR 12721 quadros za incorporação

Izmjerite površine koje standard definira, izgradite custo global za padrão zgrade, usporedite ga s objavljenim CUB, izradite quadros, prenesite trošak na svaku jedinicu prema njezinom fração ideal i sastavite memorial za upis.

6 koraka20 minInvestitor / naručiteljKonzalting za troškove / QSProjektantski / inženjerski ured

Kako funkcionira, korak po korak

6 koraka kroz platformu - što radite u svakom i zašto je važno.

1

Measure the areas the way the standard defines them

Iznošenje količina

Take off the private, the common and the total real area of every unit, then convert them into the equivalent area of construction the way NBR 12721 prescribes, so that covered and uncovered work are weighted rather than added. Keep both sets of figures, because the quadros ask for both.

Snimka zaslona, korak 1: Measure the areas the way the standard defines them (Iznošenje količina, Podnesite NBR 12721 quadros za incorporação)
Iznošenje količina: Measure the areas the way the standard defines them

Zašto: Every figure downstream is a rate multiplied by one of these areas, so an area computed the ordinary way rather than the way NBR 12721 defines it is wrong in the same direction on every unit and in the registered document. Corrections after registration are a rectification at the registry office, not an edit.

UlazApproved architectural drawingsUnit schedule of the buildingRezultatReal areas per unitEquivalent area of construction
2

Build the custo global for the padrao you are building

Baza troškova

Price the building at the standard of finish it is actually specified to, keeping the structure, the finishes and the services apart, and separate what the standard treats as the building from what it treats as land, licences and marketing. Read out the cost per square metre of equivalent area.

Zašto: The rate per square metre is the figure everyone compares, and it only means anything when the numerator and the denominator were built to the same rules. Costs that do not belong to the construction inflate the rate and make the building look expensive against every published reference, which is a conversation with a bank rather than with an estimator.

UlazSpecification and standard of finishEquivalent area of constructionRezultatCusto global of the buildingCost rate per square metre
3

Place the rate against the published CUB

Indeks cijena

Load the CUB published for the state and the building type that matches yours, put your rate beside it, and write down what the difference is made of: the items the CUB expressly leaves out, such as foundations, lifts and external works, and the specification choices that are genuinely yours.

Snimka zaslona, korak 3: Place the rate against the published CUB (Indeks cijena, Podnesite NBR 12721 quadros za incorporação)
Indeks cijena: Place the rate against the published CUB

Zašto: The CUB is computed under NBR 12721 for a standard project and deliberately excludes several real costs, so a building priced honestly is expected to sit above it. What has to exist is the sentence saying by how much and why. Without it, the same gap reads to a buyer or an auditor as a padded cost rather than as foundations.

UlazCost rate per square metrePublished CUB for the stateRezultatDifference against the CUBReason recorded for the gap
4

Produce the quadros in the form the standard prescribes

Izvješća

Generate the numbered quadros NBR 12721 lays out, from the areas of each unit through to the cost of construction and its distribution, and check that the same total appears identically in every quadro that carries it. Keep the reference month of the cost on every sheet.

Snimka zaslona, korak 4: Produce the quadros in the form the standard prescribes (Izvješća, Podnesite NBR 12721 quadros za incorporação)
Izvješća: Produce the quadros in the form the standard prescribes

Zašto: The quadros are read by a registrar who checks them against each other rather than against the building, so an internal disagreement between two sheets stops the filing even when both figures are individually defensible. Generated from one source they agree by construction, which is the only reliable way to make a set of twelve tables consistent.

UlazCusto global of the buildingReal areas per unitRezultatQuadros report in the prescribed formTotals agreeing across quadros
5

Carry the cost onto each unit by its fracao ideal

Razvoj nekretnina

Distribute the construction cost across the units in proportion to the fracao ideal recorded for each one, and hold that distribution beside the sale prices so the margin on a small unit can be read separately from the margin on a penthouse.

Snimka zaslona, korak 5: Carry the cost onto each unit by its fracao ideal (Razvoj nekretnina, Podnesite NBR 12721 quadros za incorporação)
Razvoj nekretnina: Carry the cost onto each unit by its fracao ideal

Zašto: A development sold at one price per square metre across every unit is usually selling the ground floor at a loss and does not know it, because the cost per square metre is not flat once parking, terraces and common areas are allocated. The filed distribution is the only version of that arithmetic both the buyer and the developer are looking at.

UlazQuadros report in the prescribed formFracao ideal per unitRezultatCost carried onto each unitBasis for the sale price
6

Assemble the memorial de incorporacao for registration

Dokumenti

Bring the quadros together with the title, the approved drawings, the licences and the technical responsibility notes into the set that goes to the registry office, and keep the filed version untouched afterwards as its own record.

Snimka zaslona, korak 6: Assemble the memorial de incorporacao for registration (Dokumenti, Podnesite NBR 12721 quadros za incorporação)
Dokumenti: Assemble the memorial de incorporacao for registration

Zašto: Lei 4.591 of 1964 makes registration of the memorial the condition of selling units that are not built, so this set is what allows the sales to start, and every buyer contracts against the version that was filed. A working copy that keeps evolving in the same folder is how a later dispute finds two memorials, and only one of them is the one anybody agreed to.

UlazQuadros report in the prescribed formTitle, licences and drawingsRezultatMemorial assembled for filingFiled version kept as issued
Moduli

Moduli u ovom playbooku

6 / 190 modula platforme

The market this case is written for

Brazil

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • Lei 14.133
  • SINAPI
  • ABNT NBR 12721

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Više u kategoriji Procjena i troškovi

Procjena i troškovi

Provjerite ponudu prije slanja

Provedite izrađenu ponudu kroz pravila provjere, uklonite svako upozorenje i grešku, zatim i…

3 koraka8 minOtvori
Procjena i troškovi

Izradi procjenu iz baze troškova

Preuzmite cijenjene stavke iz stvarne baze troškova, izgradite troškovnik na temelju njih, o…

4 koraka12 minOtvori