Casos / Comercial e contratos
Comercial e contratos

Definir o tratamento em IVA de um contrato de construção saudita

Registe o estatuto fiscal de ambas as partes, defina o tratamento por secção do mapa de quantidades e não por fatura, mantenha separadas a venda do imóvel e o serviço de empreitada, trate o fornecedor não residente em autoliquidação, e feche o período com IVA dedutível que consiga efetivamente comprovar.

7 etapas16 minEmpreiteiro geralPromotor / clienteConsultoria de custos / QSSubempreiteiro especializado

Como funciona, passo a passo

7 passos ao longo da plataforma - o que fazer em cada um e por que importa.

1

Record who the parties are for tax, not just for signature

Contratos

Record the VAT registration of the employer and of your own entity, whether either is a government body, and where the works are. Where the client is not resident, note that the works are on land in the Kingdom, which is what decides the place of supply for a construction or a real estate related service.

Captura de tela, etapa 1: Record who the parties are for tax, not just for signature (Contratos, Definir o tratamento em IVA de um contrato de construção saudita)
Contratos: Record who the parties are for tax, not just for signature

Por quê: The commonest Saudi VAT error on a construction contract is treating a foreign client as an export customer. Services connected with real estate follow the real estate, so a design or supervision fee billed to a company abroad for a building in Riyadh is taxed here at the standard rate. Writing that down at contract stage costs nothing. Discovering it at assessment costs the tax plus the penalty, and the client has usually gone home.

EntradaSigned contractTax registrations of both partiesResultadoTax status on recordPlace of supply settled
2

Set the treatment per bill section, once

Planilha Orçamentária

Go through the bill and mark which sections are standard rated at 15 percent, which are zero rated, which are exempt and which fall outside the scope of the tax. On most building contracts every section is standard rated and the work is proving it rather than finding exceptions, which is a five minute job that removes a monthly argument.

Captura de tela, etapa 2: Set the treatment per bill section, once (Planilha Orçamentária, Definir o tratamento em IVA de um contrato de construção saudita)
Planilha Orçamentária: Set the treatment per bill section, once

Por quê: Zero rated and exempt look the same on an invoice and behave in opposite ways behind it. A zero rated supply is taxable at nought and carries a full right to recover the input tax on what went into it. An exempt supply carries none, so the tax on your materials becomes a cost rather than a receivable. A bill that marks both as 0 percent hides the difference and only pays for it at the return.

EntradaContract bill of quantitiesTax status on recordResultadoTreatment set per sectionTax inclusive totals
3

Fix the tax point on a job billed in stages

Finanças

For each certified stage, record the date of supply the tax is due on, the date the invoice was issued and the date payment was received, and let the earliest of the events the regulation recognises decide which return period the output tax belongs to. Advances and payments on account are supplies in their own right and belong in the period they were received, not the period the work was done.

Captura de tela, etapa 3: Fix the tax point on a job billed in stages (Finanças, Definir o tratamento em IVA de um contrato de construção saudita)
Finanças: Fix the tax point on a job billed in stages

Por quê: A construction contract runs for years and is billed in slices, so the question is never whether tax is due but which month it is due in. An advance taken in one quarter and set against work done in the next is the classic case, and a contractor who accounts for the tax when the work happens rather than when the money arrived is late on a supply he has already been paid for.

EntradaPayment certificatesContract payment termsResultadoTax point per certificatePeriod the tax falls into
4

Keep the property sale and the building service apart

Desenvolvimento imobiliário

Where the job ends in a sale, model the two supplies separately: the disposal of the real estate, which carries the real estate transaction tax at 5 percent and not VAT, and the contracting, design and management services, which stay standard rated. Residential letting is exempt, and an exempt income stream restricts what input tax the scheme can recover, so it belongs in the appraisal rather than in a footnote.

Captura de tela, etapa 4: Keep the property sale and the building service apart (Desenvolvimento imobiliário, Definir o tratamento em IVA de um contrato de construção saudita)
Desenvolvimento imobiliário: Keep the property sale and the building service apart

Por quê: The October 2020 change took real estate disposals out of VAT and put the 5 percent transaction tax in their place, and it is still the point where developer appraisals go wrong, in both directions. A scheme that adds 15 percent to a sale price prices itself out. A scheme that assumes full input tax recovery on units it will let residentially is short by the tax on everything it built them with.

EntradaDevelopment schemeUnits and their tenureResultadoSale and service separatedTransaction tax accounted for
5

Account for the non-resident supplier twice over

Retenção fiscal

For every specialist engaged from outside the Kingdom, record two separate obligations against the same invoice. VAT is accounted for by you under the reverse charge, as output tax with the matching input deduction. Withholding tax is deducted from the payment at the rate the type of payment attracts and paid over separately, and a treaty position, where there is one, is evidenced rather than assumed.

Por quê: These are two different taxes on one payment and they are usually handled by two different people who each think the other has it. Reverse charge VAT is broadly cash neutral and still has to appear on both sides of the return. Withholding is real money leaving, and it is the payer who is liable for it, so an amount paid gross abroad is an amount the payer will be asked for again later.

EntradaNon-resident suppliersTheir invoicesResultadoReverse charge accountedWithholding computed
6

Recover input tax you can evidence, and only that

Finanças

Match the input tax you intend to recover to the document that supports it: a valid tax invoice from a registered supplier, or the import declaration for goods brought in. Separate out what is blocked or restricted, entertainment and private use being the usual ones, and anything attributable to an exempt supply.

Captura de tela, etapa 6: Recover input tax you can evidence, and only that (Finanças, Definir o tratamento em IVA de um contrato de construção saudita)
Finanças: Recover input tax you can evidence, and only that

Por quê: Input tax is a deduction the taxpayer has to prove, not a figure the accounting system computes. On a site with hundreds of small purchases, the tax deducted against a receipt that is not a valid tax invoice is the amount that comes back with interest, and it is invisible in the ledger because the number itself was right.

EntradaPurchase invoicesImport documentsResultadoRecoverable input taxBlocked items identified
7

Close the period with a trail behind every figure

Relatórios

Produce the period figures with the documents behind each of them: output tax by treatment, input tax by evidence type, reverse charge on both sides, and the adjustments made for credit notes cleared in the period.

Captura de tela, etapa 7: Close the period with a trail behind every figure (Relatórios, Definir o tratamento em IVA de um contrato de construção saudita)
Relatórios: Close the period with a trail behind every figure

Por quê: ZATCA already holds the cleared invoices, so the return is a claim that can be checked against records the authority produced. The value of the trail is not the filing, it is the question two years later, when the person who prepared it has moved on and the only defence is the working that came with the figure.

EntradaOutput tax for the periodRecoverable input taxResultadoReturn figuresAudit trail per box
Módulos

Módulos deste playbook

6 / 190 módulos da plataforma

O mercado para o qual este caso foi escrito

Arábia Saudita

Tudo neste caso segue a forma como a obra é medida, orçada e paga neste mercado. Os documentos, a decomposição de custos e as regras de pagamento são os que se usam lá, não uma versão genérica.

Normas que ele segue

  • Saudi Building Code
  • Government Tenders and Procurement Law

Você não precisa configurar nada disso na mão. Na primeira vez que abre a plataforma, ela pergunta em que mercado você trabalha. Escolha este e ela ajusta o idioma da interface, carrega a base de custos correspondente, registra a classificação de custos e adiciona um projeto de exemplo que você pode abrir na hora.

As verificações deste mercado também vêm com a plataforma. Ative uma vez e um orçamento ao qual falte algo que o mercado espera é sinalizado enquanto você trabalha nele, e não depois que a proposta já saiu.

Mais em Comercial e contratos

Comercial e contratos

Gerir um pacote de subempreitada

Adjudique um pacote de trabalhos a um subempreiteiro, coloque-o num subcontrato com um mapa…

3 etapas11 minAbrir
Comercial e contratos

Fatura de pagamento e conciliação

Valorize o trabalho executado neste período face ao contrato, apresente a fatura com a evidê…

3 etapas12 minAbrir