Cazuri / Comercial și contracte
Comercial și contracte

Facturarea unui subcontract în fordított adózás

Verifică dacă taxarea inversă internă se aplică lucrării, obține nyilatkozat scrisă la dosar înainte să facturezi, emite számla fără taxă și cu mențiunea fordított adózás, și ține pe linii separate livrările care rămân în afara regulii.

6 pași12 minSubantreprenor specializatAntreprenor generalConsultanță costuri / QS

Cum funcționează, pas cu pas

6 pași în cadrul platformei - ce faceți la fiecare și de ce contează.

1

Test the work against the rule, not the habit

Contracte

Record on the contract which limb of the test the work meets: that it is construction or installation work directed at real property, that the work is subject to a permit from or a notification to an authority, and that both parties are domestic taxable persons. Record the answer even when it is no, because the no is the thing you will be asked to justify later.

Captură de ecran, pasul 1: Test the work against the rule, not the habit (Contracte, Facturarea unui subcontract în fordított adózás)
Contracte: Test the work against the rule, not the habit

De ce: The condition is about the work, not about the trade, so two packages for the same customer on the same site can fall on opposite sides of it. Since the wording was widened to cover work subject to a notification and not only work subject to a permit, jobs that used to sit outside the rule now sit inside it, and firms that decided this once years ago are the ones getting it wrong now.

IntrareSubcontract and scopePermit or notification statusRezultatTax treatment decidedReason recorded on the contract
2

Get the written nyilatkozat before the work

Documente

File the written declaration the parties owe each other in advance. The party who knows the permit or notification status of the works is the party who declares it, so on a normal subcontract that is the customer declaring the status of the works, and where the permit or notification concerns the supplier's own activity the supplier declares it instead. Keep it with the contract, dated before the first invoice.

Captură de ecran, pasul 2: Get the written nyilatkozat before the work (Documente, Facturarea unui subcontract în fordított adózás)
Documente: Get the written nyilatkozat before the work

De ce: The Afa tv. makes the declaration a condition and not a courtesy. In an audit the question is never whether the building needed a permit, it is what you knew on the day you invoiced, and a declaration written afterwards answers a different question. A subcontractor who invoices without one is relying on a fact held by somebody else with no record that they were ever told it.

IntrareBoth parties and their tax statusTax treatment decidedRezultatSigned nyilatkozat on fileDated before the work
3

Keep what falls outside the rule on its own lines

Antemăsurătoare

Go through the period's tetel list and separate the work that meets the test from anything invoiced alongside it that does not, such as goods sold on without installation, plant hired out on its own or design work billed separately. The two groups end up on different tax treatments, so they have to be different lines.

Captură de ecran, pasul 3: Keep what falls outside the rule on its own lines (Antemăsurătoare, Facturarea unui subcontract în fordított adózás)
Antemăsurătoare: Keep what falls outside the rule on its own lines

De ce: A mixed invoice is the shape most reverse-charge errors arrive in, because the decision was made once for the contract and then applied to everything that came out of it. Splitting the lines while the valuation is in front of you is minutes; unpicking it from a year of invoices during an audit is not.

IntrareValuation for the periodScope of the packageRezultatLines under the reverse chargeLines taxed normally
4

Issue the szamla with the tax left off and said so

Finanțe

Raise the szamla against the approved figure with no tax amount on the reverse-charge lines, the words forditott adozas on the invoice, the customer's tax number shown, and the teljesitesigazolas it answers referenced. The 27 percent standard rate is not shown and not collected: the customer accounts for it.

Captură de ecran, pasul 4: Issue the szamla with the tax left off and said so (Finanțe, Facturarea unui subcontract în fordított adózás)
Finanțe: Issue the szamla with the tax left off and said so

De ce: The mandatory invoice content list in the Afa tv. requires the reference to forditott adozas on a reverse-charge invoice, and an invoice missing it is defective even though the amount is right. Your customer's accountant will send it back, which costs a period, and the payment clock does not run on a returned invoice.

IntrareLines under the reverse chargeSigned teljesitesigazolasRezultatSzamla issued without taxForditott adozas marked on it
5

Report it like any other invoice

Validarea facturilor electronice

Send the invoice data to NAV through the Online Szamla channel and keep the transaction receipt with the invoice. A reverse-charge invoice is reported on the same terms as a taxed one, and the reverse-charge marking travels in the data.

De ce: Carrying no tax does not make an invoice invisible to the reporting obligation, and this is a genuinely common misreading. The reported data is also what makes the pair check out: your customer declares the tax they self-assessed on the same transaction, and a supply that was never reported leaves them holding a deduction with nothing on the other side of it.

IntrareIssued szamlaReporting schemaRezultatInvoice reportedTransaction receipt
6

Reconcile the period before the return goes in

Rapoarte

Before the VAT return, list the period's invoices by treatment and look at the exceptions: a customer who appears under both treatments, a contract whose declaration is missing, an invoice with tax on it on a site where every other invoice had none.

Captură de ecran, pasul 6: Reconcile the period before the return goes in (Rapoarte, Facturarea unui subcontract în fordított adózás)
Rapoarte: Reconcile the period before the return goes in

De ce: Both sides report the same transaction in the same period, so a mismatch is visible to the tax authority whether or not it is visible to you. Finding your own inconsistency before the return goes in turns a correction into a routine amendment, and finding it two years later turns it into an assessment with interest running from the original date.

IntrareInvoices issued in the periodTax treatment per lineRezultatPeriod tax summaryExceptions to look at
Module

Modulele acestui playbook

6 / 190 module ale platformei

The market this case is written for

Ungaria

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • Kbt.
  • TSZSZ

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Mai multe în Comercial și contracte

Comercial și contracte

Situație de plată și reconciliere

Evaluați lucrarea executată în această perioadă față de contract, ridicați situația de plată…

3 pași12 minDeschide