Facturer une sous-traitance en fordított adózás

Vérifiez si l'autoliquidation interne s'applique aux travaux, obtenez le nyilatkozat écrit avant de facturer, émettez la számla sans taxe et portant la mention fordított adózás, et gardez sur des lignes distinctes les prestations qui échappent à la règle.

6 étapes12 minSous-traitant spécialiséEntreprise généraleÉconomie de la construction / métré

Comment ça marche, étape par étape

6 étapes à travers la plateforme - ce que vous faites à chacune et pourquoi c’est important.

1

Test the work against the rule, not the habit

Contrats

Record on the contract which limb of the test the work meets: that it is construction or installation work directed at real property, that the work is subject to a permit from or a notification to an authority, and that both parties are domestic taxable persons. Record the answer even when it is no, because the no is the thing you will be asked to justify later.

Pourquoi: The condition is about the work, not about the trade, so two packages for the same customer on the same site can fall on opposite sides of it. Since the wording was widened to cover work subject to a notification and not only work subject to a permit, jobs that used to sit outside the rule now sit inside it, and firms that decided this once years ago are the ones getting it wrong now.

EntréeSubcontract and scopePermit or notification statusRésultatTax treatment decidedReason recorded on the contract
2

Get the written nyilatkozat before the work

Documents

File the written declaration the parties owe each other in advance. The party who knows the permit or notification status of the works is the party who declares it, so on a normal subcontract that is the customer declaring the status of the works, and where the permit or notification concerns the supplier's own activity the supplier declares it instead. Keep it with the contract, dated before the first invoice.

Pourquoi: The Afa tv. makes the declaration a condition and not a courtesy. In an audit the question is never whether the building needed a permit, it is what you knew on the day you invoiced, and a declaration written afterwards answers a different question. A subcontractor who invoices without one is relying on a fact held by somebody else with no record that they were ever told it.

EntréeBoth parties and their tax statusTax treatment decidedRésultatSigned nyilatkozat on fileDated before the work
3

Keep what falls outside the rule on its own lines

Devis quantitatif

Go through the period's tetel list and separate the work that meets the test from anything invoiced alongside it that does not, such as goods sold on without installation, plant hired out on its own or design work billed separately. The two groups end up on different tax treatments, so they have to be different lines.

Pourquoi: A mixed invoice is the shape most reverse-charge errors arrive in, because the decision was made once for the contract and then applied to everything that came out of it. Splitting the lines while the valuation is in front of you is minutes; unpicking it from a year of invoices during an audit is not.

EntréeValuation for the periodScope of the packageRésultatLines under the reverse chargeLines taxed normally
4

Issue the szamla with the tax left off and said so

Finances

Raise the szamla against the approved figure with no tax amount on the reverse-charge lines, the words forditott adozas on the invoice, the customer's tax number shown, and the teljesitesigazolas it answers referenced. The 27 percent standard rate is not shown and not collected: the customer accounts for it.

Pourquoi: The mandatory invoice content list in the Afa tv. requires the reference to forditott adozas on a reverse-charge invoice, and an invoice missing it is defective even though the amount is right. Your customer's accountant will send it back, which costs a period, and the payment clock does not run on a returned invoice.

EntréeLines under the reverse chargeSigned teljesitesigazolasRésultatSzamla issued without taxForditott adozas marked on it
5

Report it like any other invoice

Validation des factures électroniques

Send the invoice data to NAV through the Online Szamla channel and keep the transaction receipt with the invoice. A reverse-charge invoice is reported on the same terms as a taxed one, and the reverse-charge marking travels in the data.

Pourquoi: Carrying no tax does not make an invoice invisible to the reporting obligation, and this is a genuinely common misreading. The reported data is also what makes the pair check out: your customer declares the tax they self-assessed on the same transaction, and a supply that was never reported leaves them holding a deduction with nothing on the other side of it.

EntréeIssued szamlaReporting schemaRésultatInvoice reportedTransaction receipt
6

Reconcile the period before the return goes in

Rapports

Before the VAT return, list the period's invoices by treatment and look at the exceptions: a customer who appears under both treatments, a contract whose declaration is missing, an invoice with tax on it on a site where every other invoice had none.

Pourquoi: Both sides report the same transaction in the same period, so a mismatch is visible to the tax authority whether or not it is visible to you. Finding your own inconsistency before the return goes in turns a correction into a routine amendment, and finding it two years later turns it into an assessment with interest running from the original date.

EntréeInvoices issued in the periodTax treatment per lineRésultatPeriod tax summaryExceptions to look at
Modules

Modules de ce playbook

6 / 190 modules de la plateforme

Le marché pour lequel ce cas est écrit

Hongrie

Tout dans ce cas suit la façon dont les travaux sont métrés, chiffrés et payés sur ce marché. Les formulaires, la décomposition des coûts et les règles de paiement sont ceux qui y sont utilisés, pas une version générique.

Normes qu’il suit

  • Kbt.
  • TSZSZ

Vous n’avez rien de tout cela à paramétrer à la main. Au premier démarrage, la plateforme demande sur quel marché vous travaillez. Choisissez celui-ci et elle règle la langue de l’interface, charge la base de coûts correspondante, enregistre la classification des coûts et ajoute un projet d’exemple que vous pouvez ouvrir tout de suite.

Les contrôles propres à ce marché sont eux aussi fournis avec la plateforme. Une fois activés, un devis auquel il manque quelque chose que le marché attend est signalé pendant que vous y travaillez, et non après l’envoi de l’offre.