Vakalar / Ticari ve sözleşmeler
Ticari ve sözleşmeler

Bir alt sözleşmeyi fordított adózás altında faturalayın

Yurtiçi tersine vergilendirmenin işe uygulanıp uygulanmadığını test edin, faturalamadan önce yazılı nyilatkozat'ı dosyaya alın, számla'yı vergisiz ve üzerinde fordított adózás ibaresiyle düzenleyin ve kural dışında kalan tedarikleri kendi satırlarında tutun.

6 adım12 dkUzman taşeronAna yükleniciMaliyet danışmanlığı / QS

Nasıl çalışır, adım adım

Platform genelinde 6 adım - her birinde ne yapacağınız ve neden önemli olduğu.

1

Test the work against the rule, not the habit

Sözleşmeler

Record on the contract which limb of the test the work meets: that it is construction or installation work directed at real property, that the work is subject to a permit from or a notification to an authority, and that both parties are domestic taxable persons. Record the answer even when it is no, because the no is the thing you will be asked to justify later.

Ekran görüntüsü, adım 1: Test the work against the rule, not the habit (Sözleşmeler, Bir alt sözleşmeyi fordított adózás altında faturalayın)
Sözleşmeler: Test the work against the rule, not the habit

Neden: The condition is about the work, not about the trade, so two packages for the same customer on the same site can fall on opposite sides of it. Since the wording was widened to cover work subject to a notification and not only work subject to a permit, jobs that used to sit outside the rule now sit inside it, and firms that decided this once years ago are the ones getting it wrong now.

GirdiSubcontract and scopePermit or notification statusÇıktıTax treatment decidedReason recorded on the contract
2

Get the written nyilatkozat before the work

Belgeler

File the written declaration the parties owe each other in advance. The party who knows the permit or notification status of the works is the party who declares it, so on a normal subcontract that is the customer declaring the status of the works, and where the permit or notification concerns the supplier's own activity the supplier declares it instead. Keep it with the contract, dated before the first invoice.

Ekran görüntüsü, adım 2: Get the written nyilatkozat before the work (Belgeler, Bir alt sözleşmeyi fordított adózás altında faturalayın)
Belgeler: Get the written nyilatkozat before the work

Neden: The Afa tv. makes the declaration a condition and not a courtesy. In an audit the question is never whether the building needed a permit, it is what you knew on the day you invoiced, and a declaration written afterwards answers a different question. A subcontractor who invoices without one is relying on a fact held by somebody else with no record that they were ever told it.

GirdiBoth parties and their tax statusTax treatment decidedÇıktıSigned nyilatkozat on fileDated before the work
3

Keep what falls outside the rule on its own lines

Keşif Özeti

Go through the period's tetel list and separate the work that meets the test from anything invoiced alongside it that does not, such as goods sold on without installation, plant hired out on its own or design work billed separately. The two groups end up on different tax treatments, so they have to be different lines.

Ekran görüntüsü, adım 3: Keep what falls outside the rule on its own lines (Keşif Özeti, Bir alt sözleşmeyi fordított adózás altında faturalayın)
Keşif Özeti: Keep what falls outside the rule on its own lines

Neden: A mixed invoice is the shape most reverse-charge errors arrive in, because the decision was made once for the contract and then applied to everything that came out of it. Splitting the lines while the valuation is in front of you is minutes; unpicking it from a year of invoices during an audit is not.

GirdiValuation for the periodScope of the packageÇıktıLines under the reverse chargeLines taxed normally
4

Issue the szamla with the tax left off and said so

Finans

Raise the szamla against the approved figure with no tax amount on the reverse-charge lines, the words forditott adozas on the invoice, the customer's tax number shown, and the teljesitesigazolas it answers referenced. The 27 percent standard rate is not shown and not collected: the customer accounts for it.

Ekran görüntüsü, adım 4: Issue the szamla with the tax left off and said so (Finans, Bir alt sözleşmeyi fordított adózás altında faturalayın)
Finans: Issue the szamla with the tax left off and said so

Neden: The mandatory invoice content list in the Afa tv. requires the reference to forditott adozas on a reverse-charge invoice, and an invoice missing it is defective even though the amount is right. Your customer's accountant will send it back, which costs a period, and the payment clock does not run on a returned invoice.

GirdiLines under the reverse chargeSigned teljesitesigazolasÇıktıSzamla issued without taxForditott adozas marked on it
5

Report it like any other invoice

e-Fatura Onayı

Send the invoice data to NAV through the Online Szamla channel and keep the transaction receipt with the invoice. A reverse-charge invoice is reported on the same terms as a taxed one, and the reverse-charge marking travels in the data.

Neden: Carrying no tax does not make an invoice invisible to the reporting obligation, and this is a genuinely common misreading. The reported data is also what makes the pair check out: your customer declares the tax they self-assessed on the same transaction, and a supply that was never reported leaves them holding a deduction with nothing on the other side of it.

GirdiIssued szamlaReporting schemaÇıktıInvoice reportedTransaction receipt
6

Reconcile the period before the return goes in

Raporlar

Before the VAT return, list the period's invoices by treatment and look at the exceptions: a customer who appears under both treatments, a contract whose declaration is missing, an invoice with tax on it on a site where every other invoice had none.

Ekran görüntüsü, adım 6: Reconcile the period before the return goes in (Raporlar, Bir alt sözleşmeyi fordított adózás altında faturalayın)
Raporlar: Reconcile the period before the return goes in

Neden: Both sides report the same transaction in the same period, so a mismatch is visible to the tax authority whether or not it is visible to you. Finding your own inconsistency before the return goes in turns a correction into a routine amendment, and finding it two years later turns it into an assessment with interest running from the original date.

GirdiInvoices issued in the periodTax treatment per lineÇıktıPeriod tax summaryExceptions to look at
Modüller

Bu senaryodaki modüller

6 / 190 platform modülü

The market this case is written for

Macaristan

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • Kbt.
  • TSZSZ

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Ticari ve sözleşmeler kategorisinde daha fazlası

Ticari ve sözleşmeler

Bir taşeron paketini yürütün

Bir imalat paketini bir taşerona verin, ödeme tablosu ve hakediş kesintisiyle birlikte sözle…

3 adım11 dkAç
Ticari ve sözleşmeler

Hakediş talebi ve mutabakat

Bu dönem yerinde yapılan işi sözleşmeye göre değerlendirin, kanıtlarını arkasına koyarak hak…

3 adım12 dkAç