Cases / Kommercielt og kontrakter
Kommercielt og kontrakter

Få en standardfaktura clearet gennem ZATCA fase to

Læg skatteprofilen og integrationsoplysningerne ind, udsted acontofakturaen, validér den, før den forlader huset, få den clearet hos ZATCA, giv køberen det clearede dokument med dets QR-kode, og ret det med en kreditnota frem for ved at slette det.

7 trin15 minHovedentreprenørFagentreprenørOmkostnings- / mængderådgivning

Sådan fungerer det, trin for trin

7 trin gennem platformen - hvad du gør i hvert, og hvorfor det betyder noget.

1

Record the tax profile the invoice is stamped with

Indstillinger

Put the seller's VAT registration number, the commercial registration and the address as ZATCA holds them into the profile the invoice is built from, and reference the cryptographic stamp identifier the integration was onboarded with. The buyer's VAT number belongs on the same record, because a standard invoice needs it and an invoice missing it is refused rather than queued.

Skærmbillede, trin 1: Record the tax profile the invoice is stamped with (Indstillinger, Få en standardfaktura clearet gennem ZATCA fase to)
Indstillinger: Record the tax profile the invoice is stamped with

Hvorfor: The e-invoicing regulation and its controls fix the fields a tax invoice must carry, and the integration checks them at submission rather than at audit. A number typed differently on each invoice is not a formatting question here, it is the difference between a document that clears and one that comes back, and the person who finds out is whoever is holding the payment.

InputVAT registration certificateOnboarding credentialsResultatTax profile on recordStamp identifier referenced
2

Raise the invoice against the approved certificate

Finans

Build the invoice from the certified figure for the period, with the advance recovery and the retention shown as the contract provides for them, and VAT applied at the standard Saudi rate of 15 percent on the taxable lines. Reference the payment certificate on the invoice so the two documents can be read against each other later.

Skærmbillede, trin 2: Raise the invoice against the approved certificate (Finans, Få en standardfaktura clearet gennem ZATCA fase to)
Finans: Raise the invoice against the approved certificate

Hvorfor: An invoice built by hand beside the certificate rather than from it is one that will disagree with it by a few riyals, and a cleared invoice cannot be quietly edited to make the disagreement go away. The correction is a credit note that ZATCA also holds, so the cheap moment to get the figure right is before submission.

InputApproved payment certificateTax profile on recordResultatDraft standard invoiceVAT at 15 percent applied
3

Validate it before it leaves the building

Validering

Run the invoice through validation with the Saudi rule set selected and clear the blocking findings: missing buyer VAT number on a standard invoice, a tax total that does not follow from the lines, an address that does not match the registration, a bank account in the wrong format for a Saudi IBAN.

Skærmbillede, trin 3: Validate it before it leaves the building (Validering, Få en standardfaktura clearet gennem ZATCA fase to)
Validering: Validate it before it leaves the building

Hvorfor: ZATCA validates at submission and rejects, and a rejection is not a soft failure, it means no valid tax invoice exists for that supply yet. Catching the same defects locally costs a minute and does not consume a document number, which is the whole reason validation sits before the integration and not after it.

InputDraft standard invoiceCountry rule setResultatValidation reportBlocking findings cleared
4

Clear it with ZATCA before the buyer sees it

Klarering af e-fakturaer

Submit the invoice for clearance under the Saudi regime and keep what comes back: the cryptographic stamp, the QR the document must carry, and the identifier the submission is known by. A standard invoice is cleared before issue. A simplified invoice takes the other path and is reported within twenty four hours of being issued, so decide which document you are raising before you submit it, not after.

Hvorfor: This is the step that makes Saudi e-invoicing different from a filing regime. Until clearance comes back, the document your system produced is a draft with a total on it, and issuing it to the buyer does not make it a tax invoice. The cleared document is the one that supports the buyer's input tax, so a contractor who skips this has not just missed a formality, he has handed his client something the client cannot use.

InputValidated invoiceIntegration credentialsResultatCleared invoiceStamp and QR on the document
5

Send the cleared document, not the one you printed

Dokumenter

File the cleared invoice with the payment certificate and the measure behind it, and send the buyer that version, the one carrying the stamp and the QR. Keep the XML alongside the readable copy, because the structured document is the record and the printed page is a rendering of it.

Skærmbillede, trin 5: Send the cleared document, not the one you printed (Dokumenter, Få en standardfaktura clearet gennem ZATCA fase to)
Dokumenter: Send the cleared document, not the one you printed

Hvorfor: Two documents with the same number and different provenance is the shape this failure takes, and it stays invisible until somebody reconciles. Archiving the cleared version, with everything that justified it in the same place, is what lets a query six months later be answered in one folder rather than in three inboxes.

InputCleared invoiceCertificate and backupResultatDocument sent to the buyerArchived with its stamp
6

Correct it with a credit note, never by deleting it

Finans

When the client disputes a quantity or a rate after the invoice has cleared, raise a credit note that references the original invoice and put it through the same integration. Where the correction restores the amount at a different figure, a second invoice follows the credit note. The original stays where it is.

Skærmbillede, trin 6: Correct it with a credit note, never by deleting it (Finans, Få en standardfaktura clearet gennem ZATCA fase to)
Finans: Correct it with a credit note, never by deleting it

Hvorfor: There is no unclearing. A cleared invoice exists in ZATCA's records whatever your system later shows, so the only correction the regime recognises is a credit note reported through the same channel. Teams used to editing a draft learn this the expensive way, at a reconciliation where their ledger and the tax authority's differ by exactly the amount somebody tidied up.

InputCleared invoiceAgreed correctionResultatCredit note clearedTrail from one to the other
7

Reconcile what cleared against what the accounts hold

Rapporter

At the end of the period, list every document that cleared, every credit note against them and the output tax each carried, and read that list against the project ledger. Anything in one and not the other is the thing to explain before the return is filed.

Skærmbillede, trin 7: Reconcile what cleared against what the accounts hold (Rapporter, Få en standardfaktura clearet gennem ZATCA fase to)
Rapporter: Reconcile what cleared against what the accounts hold

Hvorfor: Under a clearance regime the tax authority already has your sales ledger, so the return is a statement about records ZATCA can compare with its own. A monthly reconciliation turns a mismatch into a two line explanation while somebody still remembers the job, instead of a query about a number nobody in the room recognises.

InputCleared documents for the periodProject ledgerResultatCleared set reconciledFigures ready for the return
Moduler

Moduler i denne playbook

6 / 190 platformmoduler

The market this case is written for

Saudi-Arabien

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • Saudi Building Code
  • Government Tenders and Procurement Law

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Mere inden for Kommercielt og kontrakter

Kommercielt og kontrakter

Kør en underentreprenørpakke

Tildel en fagpakke til en underentreprenør, læg den på en underentreprise med en betalingspl…

3 trin11 minÅbn
Kommercielt og kontrakter

Betalingsanmodning og afstemning

Værdisæt det arbejde, der er udført i denne periode, op mod kontrakten, opret betalingsanmod…

3 trin12 minÅbn