Kasus / Komersial dan kontrak
Komersial dan kontrak

Sahkan faktur standar melalui ZATCA fase dua

Catat profil pajak dan kredensial integrasi, terbitkan faktur termin, validasi sebelum faktur itu keluar, sahkan melalui ZATCA, serahkan kepada pembeli dokumen yang sudah disahkan beserta QR-nya, dan koreksi dengan nota kredit, bukan dengan menghapusnya.

7 langkah15 mntKontraktor umumSubkontraktor spesialisKonsultansi biaya / QS

Cara kerjanya, langkah demi langkah

7 langkah di seluruh platform - apa yang Anda lakukan di setiap langkah dan mengapa itu penting.

1

Record the tax profile the invoice is stamped with

Pengaturan

Put the seller's VAT registration number, the commercial registration and the address as ZATCA holds them into the profile the invoice is built from, and reference the cryptographic stamp identifier the integration was onboarded with. The buyer's VAT number belongs on the same record, because a standard invoice needs it and an invoice missing it is refused rather than queued.

Tangkapan layar, langkah 1: Record the tax profile the invoice is stamped with (Pengaturan, Sahkan faktur standar melalui ZATCA fase dua)
Pengaturan: Record the tax profile the invoice is stamped with

Mengapa: The e-invoicing regulation and its controls fix the fields a tax invoice must carry, and the integration checks them at submission rather than at audit. A number typed differently on each invoice is not a formatting question here, it is the difference between a document that clears and one that comes back, and the person who finds out is whoever is holding the payment.

MasukanVAT registration certificateOnboarding credentialsHasilTax profile on recordStamp identifier referenced
2

Raise the invoice against the approved certificate

Keuangan

Build the invoice from the certified figure for the period, with the advance recovery and the retention shown as the contract provides for them, and VAT applied at the standard Saudi rate of 15 percent on the taxable lines. Reference the payment certificate on the invoice so the two documents can be read against each other later.

Tangkapan layar, langkah 2: Raise the invoice against the approved certificate (Keuangan, Sahkan faktur standar melalui ZATCA fase dua)
Keuangan: Raise the invoice against the approved certificate

Mengapa: An invoice built by hand beside the certificate rather than from it is one that will disagree with it by a few riyals, and a cleared invoice cannot be quietly edited to make the disagreement go away. The correction is a credit note that ZATCA also holds, so the cheap moment to get the figure right is before submission.

MasukanApproved payment certificateTax profile on recordHasilDraft standard invoiceVAT at 15 percent applied
3

Validate it before it leaves the building

Validasi

Run the invoice through validation with the Saudi rule set selected and clear the blocking findings: missing buyer VAT number on a standard invoice, a tax total that does not follow from the lines, an address that does not match the registration, a bank account in the wrong format for a Saudi IBAN.

Tangkapan layar, langkah 3: Validate it before it leaves the building (Validasi, Sahkan faktur standar melalui ZATCA fase dua)
Validasi: Validate it before it leaves the building

Mengapa: ZATCA validates at submission and rejects, and a rejection is not a soft failure, it means no valid tax invoice exists for that supply yet. Catching the same defects locally costs a minute and does not consume a document number, which is the whole reason validation sits before the integration and not after it.

MasukanDraft standard invoiceCountry rule setHasilValidation reportBlocking findings cleared
4

Clear it with ZATCA before the buyer sees it

Persetujuan e-Faktur

Submit the invoice for clearance under the Saudi regime and keep what comes back: the cryptographic stamp, the QR the document must carry, and the identifier the submission is known by. A standard invoice is cleared before issue. A simplified invoice takes the other path and is reported within twenty four hours of being issued, so decide which document you are raising before you submit it, not after.

Mengapa: This is the step that makes Saudi e-invoicing different from a filing regime. Until clearance comes back, the document your system produced is a draft with a total on it, and issuing it to the buyer does not make it a tax invoice. The cleared document is the one that supports the buyer's input tax, so a contractor who skips this has not just missed a formality, he has handed his client something the client cannot use.

MasukanValidated invoiceIntegration credentialsHasilCleared invoiceStamp and QR on the document
5

Send the cleared document, not the one you printed

Dokumen

File the cleared invoice with the payment certificate and the measure behind it, and send the buyer that version, the one carrying the stamp and the QR. Keep the XML alongside the readable copy, because the structured document is the record and the printed page is a rendering of it.

Tangkapan layar, langkah 5: Send the cleared document, not the one you printed (Dokumen, Sahkan faktur standar melalui ZATCA fase dua)
Dokumen: Send the cleared document, not the one you printed

Mengapa: Two documents with the same number and different provenance is the shape this failure takes, and it stays invisible until somebody reconciles. Archiving the cleared version, with everything that justified it in the same place, is what lets a query six months later be answered in one folder rather than in three inboxes.

MasukanCleared invoiceCertificate and backupHasilDocument sent to the buyerArchived with its stamp
6

Correct it with a credit note, never by deleting it

Keuangan

When the client disputes a quantity or a rate after the invoice has cleared, raise a credit note that references the original invoice and put it through the same integration. Where the correction restores the amount at a different figure, a second invoice follows the credit note. The original stays where it is.

Tangkapan layar, langkah 6: Correct it with a credit note, never by deleting it (Keuangan, Sahkan faktur standar melalui ZATCA fase dua)
Keuangan: Correct it with a credit note, never by deleting it

Mengapa: There is no unclearing. A cleared invoice exists in ZATCA's records whatever your system later shows, so the only correction the regime recognises is a credit note reported through the same channel. Teams used to editing a draft learn this the expensive way, at a reconciliation where their ledger and the tax authority's differ by exactly the amount somebody tidied up.

MasukanCleared invoiceAgreed correctionHasilCredit note clearedTrail from one to the other
7

Reconcile what cleared against what the accounts hold

Laporan

At the end of the period, list every document that cleared, every credit note against them and the output tax each carried, and read that list against the project ledger. Anything in one and not the other is the thing to explain before the return is filed.

Tangkapan layar, langkah 7: Reconcile what cleared against what the accounts hold (Laporan, Sahkan faktur standar melalui ZATCA fase dua)
Laporan: Reconcile what cleared against what the accounts hold

Mengapa: Under a clearance regime the tax authority already has your sales ledger, so the return is a statement about records ZATCA can compare with its own. A monthly reconciliation turns a mismatch into a two line explanation while somebody still remembers the job, instead of a query about a number nobody in the room recognises.

MasukanCleared documents for the periodProject ledgerHasilCleared set reconciledFigures ready for the return
Modul

Modul dalam playbook ini

6 / 190 modul platform

The market this case is written for

Arab Saudi

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • Saudi Building Code
  • Government Tenders and Procurement Law

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Lainnya di Komersial dan kontrak

Komersial dan kontrak

Jalankan paket subkontraktor

Berikan paket trade kepada subkontraktor, tuangkan dalam subkontrak dengan schedule of value…

3 langkah11 mntBuka