Kasus / Komersial dan kontrak
Komersial dan kontrak

Mengenakan GST pada progress payment pada waktu yang tepat

Tetapkan tarifnya sekali untuk selamanya, tentukan apakah harga kontrak sudah termasuk atau belum termasuk, hitung time of supply untuk pekerjaan yang dibayar secara bertahap, cantumkan taxable supply information pada setiap claim, laporkan pada periode pajak yang tepat, dan simpan catatan yang disyaratkan Act.

6 langkah13 mntKontraktor umumSubkontraktor spesialisKonsultansi biaya / QS

Cara kerjanya, langkah demi langkah

6 langkah di seluruh platform - apa yang Anda lakukan di setiap langkah dan mengapa itu penting.

1

Set the rate once with the date it took effect

Tarif Pajak

Record GST at 15 percent with the date it took effect, 1 October 2010, so that anything valued before that date is computed at the rate that applied then rather than at today's. Keep it as one setting the whole system reads instead of a number typed into each template.

Tangkapan layar, langkah 1: Set the rate once with the date it took effect (Tarif Pajak, Mengenakan GST pada progress payment pada waktu yang tepat)
Tarif Pajak: Set the rate once with the date it took effect

Mengapa: A rate that lives in six templates is a rate that will be six different numbers the first time it changes, and the errors will be in the templates nobody uses often. Holding the effective date beside it is what lets an old valuation, a retrospective claim or a long-running contract be recomputed correctly instead of being quietly restated at the current rate.

MasukanGST registrationWhere the work is suppliedHasilRate set once, used everywhereEffective date on record
2

Settle whether the price includes it, and when payment falls due

Kontrak

Record two things off the contract: whether the contract price is stated inclusive or exclusive of GST, and the rule that decides when a progress payment becomes due, which on a construction contract is usually a number of working days after a claim is served or certified. Both belong on the contract record where the person raising claims can see them.

Tangkapan layar, langkah 2: Settle whether the price includes it, and when payment falls due (Kontrak, Mengenakan GST pada progress payment pada waktu yang tepat)
Kontrak: Settle whether the price includes it, and when payment falls due

Mengapa: An inclusive price misread as exclusive is a thirteen percent error on the whole contract, and it survives review because both readings produce a plausible number. The due date rule matters for a different reason: it is one of the three dates the time of supply test looks at, so a contract term is doing tax work whether or not anybody in the finance team has read it.

MasukanContract price and payment termsWhen a payment becomes dueHasilInclusive or exclusive settledDue date rule on record
3

Fix the time of supply for the instalment

Keuangan

For each progress payment take the earliest of three dates: the date the payment becomes due under the contract, the date it is actually received, and the date an invoice is issued for it. That date decides the period the GST belongs to. Deal with the retention slice separately, because retention money is accounted for when it becomes payable rather than when it was deducted from the claim.

Tangkapan layar, langkah 3: Fix the time of supply for the instalment (Keuangan, Mengenakan GST pada progress payment pada waktu yang tepat)
Keuangan: Fix the time of supply for the instalment

Mengapa: This is where construction differs from ordinary trading and where the money is lost. On the invoice basis the tax can fall due in a period when the payer has not paid, so a slow client funds its own delay out of your account. Knowing the date in advance turns that into a planned outflow rather than a surprise in the week the return is filed.

MasukanProgress claim for the periodDue date rule on recordHasilTime of supply for the instalmentRetention slice timed separately
4

Check every document carries the taxable supply information

Validasi

Run the check over the documents you issue: the supplier's name and GST number, the date, a description of the work, the amount and the GST, and the recipient's details where the value requires them. Since 1 April 2023 this is taxable supply information rather than a document that has to be headed tax invoice, and it may be spread across more than one document as long as the set is complete.

Tangkapan layar, langkah 4: Check every document carries the taxable supply information (Validasi, Mengenakan GST pada progress payment pada waktu yang tepat)
Validasi: Check every document carries the taxable supply information

Mengapa: The obligation is now about information rather than about a form, which is easier to satisfy and easier to fail quietly, because a document that looks like every other invoice can be missing the one field that lets your customer claim the input tax. They discover it at their return, months later, and the correction lands on the relationship as well as on the paperwork.

MasukanClaims and invoices issuedInformation the Act requiresHasilDocuments carrying what they mustDocuments missing a field
5

Line the periods up with the cash

Laporan

Read the output tax the period carries against the input tax on what you bought, and read both against when the money actually moves. Record which accounting basis the business is on, because the invoice basis and the payments basis put the same job's tax in different periods, and the payments basis is only open to smaller registered persons.

Tangkapan layar, langkah 5: Line the periods up with the cash (Laporan, Mengenakan GST pada progress payment pada waktu yang tepat)
Laporan: Line the periods up with the cash

Mengapa: A construction business fails on cash rather than on margin, and GST is one of the largest predictable outflows it has. Read a month ahead it is a payment to plan for. Read on the due date it is the reason a subcontractor waits, and that has consequences under a different Act entirely.

MasukanTime of supply per instalmentTaxable period and accounting basisHasilOutput and input tax for the periodCash the return will take
6

Keep the records for as long as the Act asks

Dokumen

File the claims, the taxable supply information, the credit notes and the workings behind each return together, project by project, and keep them for seven years. Keep the workings, not only the outputs, because a query is always about how a figure was arrived at rather than about what it was.

Tangkapan layar, langkah 6: Keep the records for as long as the Act asks (Dokumen, Mengenakan GST pada progress payment pada waktu yang tepat)
Dokumen: Keep the records for as long as the Act asks

Mengapa: Seven years is longer than most construction businesses keep their project folders and longer than most of the people who built the job stay in it. A query about a return from four years ago is answered in an hour by a business that filed the workings and in a fortnight by one that has to rebuild them from bank statements.

MasukanClaims, invoices and returnsWorkings behind each figureHasilRecords kept for seven yearsOne place to answer a query from
Modul

Modul dalam playbook ini

6 / 190 modul platform

The market this case is written for

Selandia Baru

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • NZS 3910
  • Construction Contracts Act

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Lainnya di Komersial dan kontrak

Komersial dan kontrak

Jalankan paket subkontraktor

Berikan paket trade kepada subkontraktor, tuangkan dalam subkontrak dengan schedule of value…

3 langkah11 mntBuka