ケース / 積算とコスト
積算とコスト

歩掛と rezsióradíj からハンガリー式の明細内訳を積算する

ハンガリーの明細内訳は読まれ方どおりに組み立てる。各 tétel の背後に歩掛を置き、anyag と díj を分けて示し、díj は歩掛の時間と明示した rezsióradíj から積み上げ、発注者が行ごとに検算できる工種別の főösszesítő を付ける。

7ステップ13 分総合建設会社専門工事業者コストコンサルティング会社 / 積算事務所

仕組みをステップごとに

プラットフォーム全体で7ステップ - 各ステップで何をするか、そしてなぜ重要か。

1

Take in the tetel list and group it by munkanem

内訳書

Bring the tetel list in as the bill you will price, keeping the numbering, the unit and the quantity as issued, and group it by munkanem so each trade section can be totalled and read on its own. Flag the work the drawings show and the list does not, rather than silently pricing it inside a neighbouring tetel.

スクリーンショット、ステップ 1: Take in the tetel list and group it by munkanem (内訳書, 歩掛と rezsióradíj からハンガリー式の明細内訳を積算する)
内訳書: Take in the tetel list and group it by munkanem

理由: Government Decree 191/2009 (IX. 15.), the Epkiv., requires the kivitelezesi szerzodes to be in writing and lists what it carries, the unpriced itemised bill among them. So this list is not working material, it is the annex the contract will be measured against for the whole job. Work you absorb into another line now is work you cannot bill separately later, and a tetel you add without saying so reads as a different offer from everyone else's.

入力Arazatlan koltsegvetesi kiirasDrawings and specification出力Tetel list by munkanemMissing tetel flagged
2

Put a norm behind every tetel

歩掛

For each tetel record the labour time and the material consumption per unit that the price assumes, and name where that norm came from: a published norm collection with its edition year, or your own measured output from a comparable job. Adjust it for the conditions this site imposes rather than editing the rate at the end to make the total look right.

理由: A norm with a name and a year can be argued with. A rate that arrived from nowhere can only be believed or disbelieved. That difference decides how a variation is settled, how a claim for extra work is read, and whether a justification for a low price is accepted, and it costs nothing to record while you are already looking at the tetel.

入力Tetel and its unitMethod and site conditions出力Norm hours per unitMaterial consumption per unit
3

Build the rezsioradij you will actually use

労務単価

Build the hourly rate from its parts: gross wage, the employer contributions on it, paid non-working time, small plant and hand tools, site running costs and the share of company overhead the job carries. Keep the build-up attached to the rate so anyone can see which of those parts is doing the work.

スクリーンショット、ステップ 3: Build the rezsioradij you will actually use (労務単価, 歩掛と rezsióradíj からハンガリー式の明細内訳を積算する)
労務単価: Build the rezsioradij you will actually use

理由: The rezsioradij is the single number that decides whether a Hungarian bid is profitable, and it is the number most often carried over from last year without being rebuilt. It is also not a free choice. A minimum construction rezsioradij is set by ministerial decree for the year, and on public work an offer calculated below it can be found invalid, so a rate under the minimum has to be a decision somebody made rather than a number that came out of a spreadsheet.

入力Wages and contributionsSite and company overhead出力Rezsioradij for the jobRate build-up on record
4

Assemble each tetel as anyag plus dij

複合単価

Build the unit price as an assembly rather than typing it. The dij is the norm hours multiplied by the rezsioradij, the anyag is the consumption multiplied by the material price including waste and delivery, and hired plant sits on its own line rather than being smeared through the hourly rate.

スクリーンショット、ステップ 4: Assemble each tetel as anyag plus dij (複合単価, 歩掛と rezsióradíj からハンガリー式の明細内訳を積算する)
複合単価: Assemble each tetel as anyag plus dij

理由: Hungarian bills are read with the anyag and the dij apart, and the two move for different reasons: material prices move with the market and the dij moves with wages and productivity. A single blended number hides which one moved, which is exactly what you need to show when a client asks why a rate has changed since last year.

入力Norm hours and materialsRezsioradij and material prices出力Anyag side of the unit priceDij side of the unit price
5

Add the markups where they can be seen

内訳書

In the bill's Markups & Overheads panel, apply the markups as their own layer over the direct cost, so the direct cost stays readable underneath. Decide once whether overhead already sits inside the rezsioradij or on top of the tetel, and apply that decision everywhere rather than per section.

理由: Overhead counted twice, once inside the hourly rate and once as a percentage on the total, is the commonest quiet error in an itemised bill and it is invisible in the total. Keeping the layer separate makes it a thing you can look at, and it also makes a discount a decision about margin rather than an unexplained edit to a unit rate.

入力Direct cost per tetelMarkup policy出力Markups appliedOffer price per tetel
6

Check the bill against the list you were given

検証

Run validation over the priced bill: nothing left at zero, no unit or quantity drifted from the kiiras, no tetel priced far outside the band its neighbours sit in, and every rate carrying the norm and the rate basis it claims.

スクリーンショット、ステップ 6: Check the bill against the list you were given (検証, 歩掛と rezsióradíj からハンガリー式の明細内訳を積算する)
検証: Check the bill against the list you were given

理由: An outlier is not automatically wrong, and that is the point of looking: half of them are a decimal place and half of them are the one tetel on the job where your method genuinely differs. You want to know which is which before the client tells you, because only one of the two is worth defending.

入力Priced koltsegvetesOriginal kiiras出力Validation reportFindings cleared
7

Issue the koltsegvetes with its foosszesito

レポート

Produce the document rather than the spreadsheet: the tetel detail under each munkanem, the anyag and dij columns kept apart, a summary per munkanem and a foosszesito that carries the sections up to the offer total.

スクリーンショット、ステップ 7: Issue the koltsegvetes with its foosszesito (レポート, 歩掛と rezsióradíj からハンガリー式の明細内訳を積算する)
レポート: Issue the koltsegvetes with its foosszesito

理由: The foosszesito is how a Hungarian client reads a price, and a bill delivered without one gets retyped into that shape by somebody who was not there when it was priced. Issuing it in the expected form is the difference between a price that gets discussed and a price that gets rebuilt.

入力Validated priced billMunkanem structure出力Foosszesito by munkanemKoltsegvetes for the client
モジュール

このプレイブックのモジュール

プラットフォーム 190 モジュール中 6 個

The market this case is written for

ハンガリー

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • Kbt.
  • TSZSZ

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

積算とコストの他のケース

積算とコスト

送付前に見積を確認する

積算済みの内訳書を検証ルールにかけ、すべての警告とエラーを解消し、そのまま顧客に渡せるきれいなレポートを出力する。

3ステップ8 分開く
積算とコスト

コストデータベースから見積を作成する

実在のコストデータベースから積算項目を取り出して内訳書を組み立て、繰り返し使う積み上げをアセンブリにまとめ、入札額を確定する前にチェックを実行します。

4ステップ12 分開く
積算とコスト

コストリスクから予備費を設定する

単一値の見積を幅のある値に変え、本当に不確実性のある項目についてモンテカルロシミュレーションを実行し、P50からP90の分布を読み取り、行ごとに根拠を示せる予備費を設定します。

3ステップ11 分開く