Bid for a public works contract under the Kbt.

Settle which procurement regime the job falls under, price the arazatlan koltsegvetesi kiiras tetel by tetel, build the price so it survives a request to justify it, and get the offer into the EKR complete and on time.

8 алхам14 минЕрөнхий гүйцэтгэгчМэргэшсэн дэд гүйцэтгэгчӨртгийн зөвлөгөө / QS

Хэрхэн ажилладаг, алхам алхмаар

Платформ даяар 8 алхам - алхам бүрт юу хийх, яагаад чухал болохыг.

1

Settle which regime the job is bought under

Тендер

Open the tender as a procedure of its own and record the becsult ertek of the whole work, the procedure type the contracting authority chose and whether it sits above or below the national threshold. Read the value across the whole work rather than per lot, because that is how the threshold is measured.

Дэлгэцийн зураг, 1-р алхам: Settle which regime the job is bought under (Тендер, Bid for a public works contract under the Kbt.)
Тендер: Settle which regime the job is bought under

Яагаад: The national thresholds are set in the central budget act for the year and republished by the Kozbeszerzesi Hatosag each January, so last year's figure is the wrong figure and nobody is going to warn you. Kbt. 19. governs how the estimated value is worked out, and choosing a method that keeps a work under a threshold is the finding that undoes a whole procedure, so the number you record here is the number the file has to defend.

ОролтContract noticeScope of worksҮр дүнProcedure and regime on recordEstimated contract value
2

File the EKR document set as issued

Баримт бичиг

Save the kozbeszerzesi dokumentumok exactly as they came out of the EKR, with the date each item arrived. Record the deadline for offers and the ajanlati kotottseg, the period your price is bound for, next to them.

Дэлгэцийн зураг, 2-р алхам: File the EKR document set as issued (Баримт бичиг, Bid for a public works contract under the Kbt.)
Баримт бичиг: File the EKR document set as issued

Яагаад: Documents are corrected and reissued during the bidding period, and every clarification the authority answers goes to all bidders. Keeping the version you actually priced is what lets you show weeks later which set your offer answers, and the bound period is what tells you how long a win can still cost you if your suppliers move.

ОролтEKR document setContract noticeҮр дүнFiled tender documentsSubmission and validity dates
3

Price the arazatlan koltsegvetesi kiiras

Ажил материалын жагсаалт

Read the unpriced itemised bill in as the bill you price, keeping the tetel numbering, the unit and the quantity the authority issued. Put a unit price on every line, including the ones you would normally carry inside another rate, and read each tetel description before you price it.

Дэлгэцийн зураг, 3-р алхам: Price the arazatlan koltsegvetesi kiiras (Ажил материалын жагсаалт, Bid for a public works contract under the Kbt.)
Ажил материалын жагсаалт: Price the arazatlan koltsegvetesi kiiras

Яагаад: Government Decree 322/2015 (X. 30.) is what puts the itemised bill at the centre of a Hungarian construction procurement, and the priced version you return is read line against line rather than as a total. One tetel left at zero, one renumbered line or one unit quietly changed is enough to make the offer unreadable against the others, and an unreadable offer is not a cheap offer.

ОролтArazatlan koltsegvetesi kiirasTender drawingsҮр дүнPriced tetel listOffer total
4

Write down where the price came from

Төсвийн үндэслэл

Record the basis under the offer while you still remember it: which norm set the labour hours, which rezsioradij the dij is built on, which quotes carry the anyag, what the preliminaries assume and which risks are priced rather than excluded.

Яагаад: Kbt. 72. lets the contracting authority demand a justification where a price or a cost element looks disproportionately low, and it may reject an offer whose justification does not stand up. That request arrives with a short deadline, weeks after you priced, and the difference between keeping the job and losing it is whether the calculation behind the number already exists in writing or has to be rebuilt from memory in three days.

ОролтUnit ratesNorm and rezsioradij basisҮр дүнStated basis of estimateJustification ready to send
5

Assemble the qualification half of the offer

Тендерийн удирдлага

Build the non-price half of the bid as its own package: the egyseges europai kozbeszerzesi dokumentum, the declarations on the kizaro okok, the references and the professionals the alkalmassag criteria ask for, and the ajanlati biztositek where the notice requires one. Name any capacity provider and any subcontractor the notice makes you name.

Дэлгэцийн зураг, 5-р алхам: Assemble the qualification half of the offer (Тендерийн удирдлага, Bid for a public works contract under the Kbt.)
Тендерийн удирдлага: Assemble the qualification half of the offer

Яагаад: In an EU-threshold procedure the EEKD is a preliminary declaration and the underlying certificates are called in later, which tempts a bidder to treat the form as a formality. It is not one: a declaration that does not match the certificates that follow it is worse than a missing reference, because it reads as a false statement rather than as a gap, and the consequence is exclusion rather than a request to complete the file.

ОролтCompany and reference recordsSuitability requirementsҮр дүнCompleted EEKDExclusion-ground declarations
6

Check the offer against the tender it answers

Шалгалт

Run validation over the whole submission before it goes anywhere: every tetel priced, quantities and units unchanged from the kiiras, the totals adding up, and every document the notice lists actually present in the package.

Дэлгэцийн зураг, 6-р алхам: Check the offer against the tender it answers (Шалгалт, Bid for a public works contract under the Kbt.)
Шалгалт: Check the offer against the tender it answers

Яагаад: Everything an evaluator can reject an offer for is mechanical, and every one of those things is cheaper to find here than in an answer to a hianypotlas under a three-day clock. This is also the last moment at which a decimal place in the total is still an internal problem.

ОролтPriced billQualification packageҮр дүнValidation reportFindings cleared
7

Submit through the EKR and log what went

Дамжуулалт

Send the offer up through the EKR before the deadline and keep the transmittal record of what went, when, and under which procedure identifier. Communication in the procedure runs through the same system, so the record and the correspondence stay in one place.

Дэлгэцийн зураг, 7-р алхам: Submit through the EKR and log what went (Дамжуулалт, Bid for a public works contract under the Kbt.)
Дамжуулалт: Submit through the EKR and log what went

Яагаад: The EKR timestamps the submission, and a bid that lands after the deadline is not a late bid, it is not a bid. Bidders lose work every year to an upload begun twenty minutes before the hour on a file that turned out to be larger than the connection, which is a scheduling failure rather than a commercial one.

ОролтComplete offer packageSubmission deadlineҮр дүнSubmitted offerDated submission record
8

Answer the hianypotlas inside its deadline

Харилцаа холбоо

When the authority asks for the file to be completed, put the request on the correspondence thread with the deadline attached, answer exactly what was asked and nothing else, and record what went back and when.

Дэлгэцийн зураг, 8-р алхам: Answer the hianypotlas inside its deadline (Харилцаа холбоо, Bid for a public works contract under the Kbt.)
Харилцаа холбоо: Answer the hianypotlas inside its deadline

Яагаад: Kbt. 71. is the second chance the procedure gives you, and it is the only one. The deadlines are short, they run in working days, and they are usually set while the person who assembled the bid is on another job. An answer that arrives a day late is treated the same as no answer, and an answer that changes something nobody asked about invites a different problem.

ОролтRequest to complete the fileSubmitted offer recordҮр дүнAnswer on the threadOffer kept in the evaluation
Модулиуд

Энэ тоглолтын модулиуд

Платформын 190 модулиас 8

The market this case is written for

Унгар

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • Kbt.
  • TSZSZ

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Тендер ба худалдан авалт дахь бусад

Тендер ба худалдан авалт

BOQ-оос материал худалдан авах

Аль хэдийн үнэлсэн тоо хэмжээгээ худалдаж ав: данснаас хэрэгцээний хүсэлт гарга, ханган нийл…

4 алхам10 минНээх