Kbt. に基づいて公共工事契約に入札する

案件がどの調達制度に該当するかを確定し、価格未記入の költségvetési kiírás を tétel ごとに積算し、根拠の説明を求められても耐えられる価格を組み立て、応札書類を漏れなく期限内に EKR へ提出する。

8ステップ14 分総合建設会社専門工事業者コストコンサルティング会社 / 積算事務所

仕組みをステップごとに

プラットフォーム全体で8ステップ - 各ステップで何をするか、そしてなぜ重要か。

1

Settle which regime the job is bought under

入札管理

Open the tender as a procedure of its own and record the becsult ertek of the whole work, the procedure type the contracting authority chose and whether it sits above or below the national threshold. Read the value across the whole work rather than per lot, because that is how the threshold is measured.

スクリーンショット、ステップ 1: Settle which regime the job is bought under (入札管理, Kbt. に基づいて公共工事契約に入札する)
入札管理: Settle which regime the job is bought under

理由: The national thresholds are set in the central budget act for the year and republished by the Kozbeszerzesi Hatosag each January, so last year's figure is the wrong figure and nobody is going to warn you. Kbt. 19. governs how the estimated value is worked out, and choosing a method that keeps a work under a threshold is the finding that undoes a whole procedure, so the number you record here is the number the file has to defend.

入力Contract noticeScope of works出力Procedure and regime on recordEstimated contract value
2

File the EKR document set as issued

文書

Save the kozbeszerzesi dokumentumok exactly as they came out of the EKR, with the date each item arrived. Record the deadline for offers and the ajanlati kotottseg, the period your price is bound for, next to them.

スクリーンショット、ステップ 2: File the EKR document set as issued (文書, Kbt. に基づいて公共工事契約に入札する)
文書: File the EKR document set as issued

理由: Documents are corrected and reissued during the bidding period, and every clarification the authority answers goes to all bidders. Keeping the version you actually priced is what lets you show weeks later which set your offer answers, and the bound period is what tells you how long a win can still cost you if your suppliers move.

入力EKR document setContract notice出力Filed tender documentsSubmission and validity dates
3

Price the arazatlan koltsegvetesi kiiras

内訳書

Read the unpriced itemised bill in as the bill you price, keeping the tetel numbering, the unit and the quantity the authority issued. Put a unit price on every line, including the ones you would normally carry inside another rate, and read each tetel description before you price it.

スクリーンショット、ステップ 3: Price the arazatlan koltsegvetesi kiiras (内訳書, Kbt. に基づいて公共工事契約に入札する)
内訳書: Price the arazatlan koltsegvetesi kiiras

理由: Government Decree 322/2015 (X. 30.) is what puts the itemised bill at the centre of a Hungarian construction procurement, and the priced version you return is read line against line rather than as a total. One tetel left at zero, one renumbered line or one unit quietly changed is enough to make the offer unreadable against the others, and an unreadable offer is not a cheap offer.

入力Arazatlan koltsegvetesi kiirasTender drawings出力Priced tetel listOffer total
4

Write down where the price came from

見積根拠

Record the basis under the offer while you still remember it: which norm set the labour hours, which rezsioradij the dij is built on, which quotes carry the anyag, what the preliminaries assume and which risks are priced rather than excluded.

理由: Kbt. 72. lets the contracting authority demand a justification where a price or a cost element looks disproportionately low, and it may reject an offer whose justification does not stand up. That request arrives with a short deadline, weeks after you priced, and the difference between keeping the job and losing it is whether the calculation behind the number already exists in writing or has to be rebuilt from memory in three days.

入力Unit ratesNorm and rezsioradij basis出力Stated basis of estimateJustification ready to send
5

Assemble the qualification half of the offer

入札管理

Build the non-price half of the bid as its own package: the egyseges europai kozbeszerzesi dokumentum, the declarations on the kizaro okok, the references and the professionals the alkalmassag criteria ask for, and the ajanlati biztositek where the notice requires one. Name any capacity provider and any subcontractor the notice makes you name.

スクリーンショット、ステップ 5: Assemble the qualification half of the offer (入札管理, Kbt. に基づいて公共工事契約に入札する)
入札管理: Assemble the qualification half of the offer

理由: In an EU-threshold procedure the EEKD is a preliminary declaration and the underlying certificates are called in later, which tempts a bidder to treat the form as a formality. It is not one: a declaration that does not match the certificates that follow it is worse than a missing reference, because it reads as a false statement rather than as a gap, and the consequence is exclusion rather than a request to complete the file.

入力Company and reference recordsSuitability requirements出力Completed EEKDExclusion-ground declarations
6

Check the offer against the tender it answers

検証

Run validation over the whole submission before it goes anywhere: every tetel priced, quantities and units unchanged from the kiiras, the totals adding up, and every document the notice lists actually present in the package.

スクリーンショット、ステップ 6: Check the offer against the tender it answers (検証, Kbt. に基づいて公共工事契約に入札する)
検証: Check the offer against the tender it answers

理由: Everything an evaluator can reject an offer for is mechanical, and every one of those things is cheaper to find here than in an answer to a hianypotlas under a three-day clock. This is also the last moment at which a decimal place in the total is still an internal problem.

入力Priced billQualification package出力Validation reportFindings cleared
7

Submit through the EKR and log what went

送付

Send the offer up through the EKR before the deadline and keep the transmittal record of what went, when, and under which procedure identifier. Communication in the procedure runs through the same system, so the record and the correspondence stay in one place.

スクリーンショット、ステップ 7: Submit through the EKR and log what went (送付, Kbt. に基づいて公共工事契約に入札する)
送付: Submit through the EKR and log what went

理由: The EKR timestamps the submission, and a bid that lands after the deadline is not a late bid, it is not a bid. Bidders lose work every year to an upload begun twenty minutes before the hour on a file that turned out to be larger than the connection, which is a scheduling failure rather than a commercial one.

入力Complete offer packageSubmission deadline出力Submitted offerDated submission record
8

Answer the hianypotlas inside its deadline

やり取り

When the authority asks for the file to be completed, put the request on the correspondence thread with the deadline attached, answer exactly what was asked and nothing else, and record what went back and when.

スクリーンショット、ステップ 8: Answer the hianypotlas inside its deadline (やり取り, Kbt. に基づいて公共工事契約に入札する)
やり取り: Answer the hianypotlas inside its deadline

理由: Kbt. 71. is the second chance the procedure gives you, and it is the only one. The deadlines are short, they run in working days, and they are usually set while the person who assembled the bid is on another job. An answer that arrives a day late is treated the same as no answer, and an answer that changes something nobody asked about invites a different problem.

入力Request to complete the fileSubmitted offer record出力Answer on the threadOffer kept in the evaluation
モジュール

このプレイブックのモジュール

プラットフォーム 190 モジュール中 8 個

The market this case is written for

ハンガリー

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • Kbt.
  • TSZSZ

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

入札と調達の他のケース

入札と調達

内訳書から入札を実施する

積算済みの内訳書を市場に出す。パッケージにまとめ、下請業者を招待し、入札をレベリングし、勝者に発注する。5ステップで最初から最後まで。

5ステップ12 分開く
入札と調達

内訳書から資材を調達する

すでに価格付けした数量を購入する。明細書から購入依頼を起票し、サプライヤーへ発注し、現場で入荷検収を行う。

4ステップ10 分開く
入札と調達

入札を比較して発注する

微妙に食い違う入札書類の束を取り、同じ施工範囲まで揃えて比較し、精査に耐える発注判断を施主に提示します。

3ステップ12 分開く