Build a parametric assembly

Give an assembly named parameters and drive its component quantities from formulas over them: enter the wall area when you apply it and let the reinforcement, the concrete and the composite rate follow.

4 алхам12 минӨртгийн зөвлөгөө / QSЕрөнхий гүйцэтгэгчМэргэшсэн дэд гүйцэтгэгч

Хэрхэн ажилладаг, алхам алхмаар

Платформ даяар 4 алхам - алхам бүрт юу хийх, яагаад чухал болохыг.

1

Name the parameters

Нэгдэл

Give the assembly the few named parameters it really turns on. Each is one of three kinds: an input the estimator enters when they apply it, with a sensible default; a constant that does not move, such as a rebar ratio; or a calculated value derived from the others, such as area from length times height.

Яагаад: The parameters are the questions the assembly asks whoever uses it, so keep them to the ones that genuinely change between jobs. Every extra input is another figure somebody has to be right about at half past five on the day the tender goes in.

ОролтBuild-up you price repeatedlyWhat actually varies job to jobҮр дүнNamed parametersResolved default values
2

Drive the quantities from a formula

Нэгдэл

Set a component's quantity from a formula over the parameters instead of a fixed number, the reinforcement as wall area times the rebar ratio, the formwork as area times a double-sided factor. Any line whose quantity is computed carries an fx marker on it.

Яагаад: A fixed recipe makes you re-derive the steel by hand every time the wall moves. Written as a formula the relationship is stated once, so the ratio you agreed with the engineer is the ratio in every priced line, and the fx marker stops anyone reading a derived quantity as one that was measured.

ОролтNamed parametersComponent linesҮр дүнQuantity formulasComputed lines marked fx
3

Prove it before anyone uses it

Нэгдэл

The editor checks the parameter graph as you work and flags problems inline against the parameter or component they belong to: a name referenced but never defined, two parameters sharing a name, a formula that will not parse, a cycle where two calculated values depend on each other. Then run the expansion preview at real values and read the quantity each line moves from and to, plus the rolled-up rate the server will write.

Яагаад: A cycle or a stale reference does not announce itself in a spreadsheet, it just returns a number that looks plausible. Previewing at values you actually expect is what catches a formula that is right in principle and out by a factor of ten, and because the preview runs on the same decimal arithmetic as the live expansion, the rate you read here is the rate that lands, exact to the cent.

ОролтDraft parametric assemblyValues you expect on the jobҮр дүнNamed errors, if anyBefore and after per line
4

Apply it to the bill

Ажил материалын жагсаалт

Place the assembly on a bill position and enter the one figure it asks for, the wall area for that element. The components expand at those values and the composite rate follows, with nobody retyping a quantity.

Яагаад: This is where the parametric version earns its keep over a fixed recipe. When the wall grows at the next design issue you change one input rather than eleven component quantities, and the two or three that would quietly have been forgotten move with the rest.

ОролтProven assemblyWall area for this elementҮр дүнPriced bill positionComponents at computed quantities
Модулиуд

Энэ тоглолтын модулиуд

Платформын 184 модулиас 2

Төсөв ба өртөг дахь бусад

Төсөв ба өртөг

Зардлын эрсдэлээс нөөц тогтоох

Нэг тоон тооцооллыг хязгаартай мужид хувиргаж, зөвхөн жинхэнэ тодорхойгүй мөрүүдэд Монте Кар…

3 алхам11 минНээх