Kasus / Estimasi dan biaya
Estimasi dan biaya

Membangun assembly parametrik

Beri sebuah assembly parameter bernama dan gerakkan kuantitas komponennya dari rumus di atas parameter itu: masukkan luas dinding saat Anda menerapkannya dan biarkan tulangan, beton, dan tarif komposit mengikuti.

4 langkah12 mntKonsultansi biaya / QSKontraktor umumSubkontraktor spesialis

Cara kerjanya, langkah demi langkah

4 langkah di seluruh platform - apa yang Anda lakukan di setiap langkah dan mengapa itu penting.

1

Name the parameters

Rakitan

Give the assembly the few named parameters it really turns on. Each is one of three kinds: an input the estimator enters when they apply it, with a sensible default; a constant that does not move, such as a rebar ratio; or a calculated value derived from the others, such as area from length times height.

Tangkapan layar, langkah 1: Name the parameters (Rakitan, Membangun assembly parametrik)
Rakitan: Name the parameters

Mengapa: The parameters are the questions the assembly asks whoever uses it, so keep them to the ones that genuinely change between jobs. Every extra input is another figure somebody has to be right about at half past five on the day the tender goes in.

MasukanBuild-up you price repeatedlyWhat actually varies job to jobHasilNamed parametersResolved default values
2

Drive the quantities from a formula

Rakitan

Set a component's quantity from a formula over the parameters instead of a fixed number, the reinforcement as wall area times the rebar ratio, the formwork as area times a double-sided factor. Any line whose quantity is computed carries an fx marker on it.

Tangkapan layar, langkah 2: Drive the quantities from a formula (Rakitan, Membangun assembly parametrik)
Rakitan: Drive the quantities from a formula

Mengapa: A fixed recipe makes you re-derive the steel by hand every time the wall moves. Written as a formula the relationship is stated once, so the ratio you agreed with the engineer is the ratio in every priced line, and the fx marker stops anyone reading a derived quantity as one that was measured.

MasukanNamed parametersComponent linesHasilQuantity formulasComputed lines marked fx
3

Prove it before anyone uses it

Rakitan

The editor checks the parameter graph as you work and flags problems inline against the parameter or component they belong to: a name referenced but never defined, two parameters sharing a name, a formula that will not parse, a cycle where two calculated values depend on each other. Then run the expansion preview at real values and read the quantity each line moves from and to, plus the rolled-up rate the server will write.

Tangkapan layar, langkah 3: Prove it before anyone uses it (Rakitan, Membangun assembly parametrik)
Rakitan: Prove it before anyone uses it

Mengapa: A cycle or a stale reference does not announce itself in a spreadsheet, it just returns a number that looks plausible. Previewing at values you actually expect is what catches a formula that is right in principle and out by a factor of ten, and because the preview runs on the same decimal arithmetic as the live expansion, the rate you read here is the rate that lands, exact to the cent.

MasukanDraft parametric assemblyValues you expect on the jobHasilNamed errors, if anyBefore and after per line
4

Apply it to the bill

BOQ

Place the assembly on a bill position and enter the one figure it asks for, the wall area for that element. The components expand at those values and the composite rate follows, with nobody retyping a quantity.

Tangkapan layar, langkah 4: Apply it to the bill (BOQ, Membangun assembly parametrik)
BOQ: Apply it to the bill

Mengapa: This is where the parametric version earns its keep over a fixed recipe. When the wall grows at the next design issue you change one input rather than eleven component quantities, and the two or three that would quietly have been forgotten move with the rest.

MasukanProven assemblyWall area for this elementHasilPriced bill positionComponents at computed quantities
Modul

Modul dalam playbook ini

2 / 190 modul platform

Lainnya di Estimasi dan biaya

Estimasi dan biaya

Estimate from a cost database

Pull priced items from a real cost database, build the bill from them, bundle recurring bui…

4 langkah12 mntBuka
Estimasi dan biaya

Set contingency from cost risk

Turn a single-point estimate into a range, run a Monte Carlo over the genuinely uncertain l…

3 langkah11 mntBuka