Тохиолдлууд / Арилжаа ба гэрээ
Арилжаа ба гэрээ

сарыг KS-2 акт болон KS-3 гэрчилгээгээр хаах

Тухайн үеийг smeta-тай харьцуулан хэмжиж, GESN нормыг тэдгээрийн авч явдаг нөөцүүд рүү задалж, харилцагчийн техникийн хяналтын ажилтнаас KS-2 актад гарын үсэг зуруулж, үүн дээр үндэслэн KS-3 гэрчилгээг гаргана, ингэснээр хуримтлагдсан тоо болон хүлээн авсан тоо хэзээ ч зөрөхгүй болно.

7 алхам12 минЕрөнхий гүйцэтгэгчМэргэшсэн дэд гүйцэтгэгчХөгжүүлэгч / захиалагч

Хэрхэн ажилладаг, алхам алхмаар

Платформ даяар 7 алхам - алхам бүрт юу хийх, яагаад чухал болохыг.

1

Measure the period smeta position by smeta position

Явц

Record what was executed against each smeta position for the period as a percentage of its contract quantity. The earned quantity follows from that percentage and the design quantity, and the earned amount from the same percentage and the position total, so one honest number per line produces the whole valuation.

Дэлгэцийн зураг, 1-р алхам: Measure the period smeta position by smeta position (Явц, сарыг KS-2 акт болон KS-3 гэрчилгээгээр хаах)
Явц: Measure the period smeta position by smeta position

Яагаад: A KS-2 act built from a single project percentage cannot be checked and therefore cannot be approved without a conversation. Measured line by line, the disagreement is about one smeta position rather than about the whole month, and the rest of the money moves while that one is settled.

ОролтApproved smetaWork executed this periodҮр дүнPercent complete per smeta positionExecuted volumes for the period
2

Value it at the contract rates

Ажил материалын жагсаалт

Read the valuation back against the bill and check the rates it used are the contract rates. Where a smeta position has been measured past the quantity the contract carries, deal with it as a change to the position with an order behind it rather than as a larger figure on the same line. A norm-based rate carries the labour, machinery and materials behind it, so the act can be read back to the resources it claims rather than to a single figure. That is what makes a disagreement about one position a conversation about one norm.

Дэлгэцийн зураг, 2-р алхам: Value it at the contract rates (Ажил материалын жагсаалт, сарыг KS-2 акт болон KS-3 гэрчилгээгээр хаах)
Ажил материалын жагсаалт: Value it at the contract rates

Яагаад: An additional works agreement certified quietly is one the client can refuse at the final account, months after the work was built and paid for down the chain. Raising it as a change while it is small is the only version of that conversation where you are not asking to be paid for work already done.

ОролтExecuted volumes for the periodGESN norms and smeta ratesҮр дүнKS-2 act for the periodAdditional works flagged
3

Get it approved by the people who have to approve it

Зөвшөөрлийн маршрутууд

Route the KS-2 act to the client's technical supervisor, and to whoever the contract adds after them. Keep the approval date, because the KS-3 certificate follows the approval and the payment clock runs from there, so an approval that slips moves everything behind it. On a state contract under 44-FZ the act is signed as the acceptance document in the EIS, the customer has the period the contract sets and at most twenty working days to sign it or refuse it with reasons, and payment then falls due within seven working days of that signature.

Дэлгэцийн зураг, 3-р алхам: Get it approved by the people who have to approve it (Зөвшөөрлийн маршрутууд, сарыг KS-2 акт болон KS-3 гэрчилгээгээр хаах)
Зөвшөөрлийн маршрутууд: Get it approved by the people who have to approve it

Яагаад: Approval sitting in an inbox is the most common reason a payment is late, and it is invisible while it is happening because nobody has refused anything. A route with a date on each hop turns that into a question with an owner instead of a monthly complaint.

ОролтKS-2 act for the periodTechnical supervisor named for acceptanceҮр дүнSigned KS-2 actAcceptance date on record
4

Apply guarantee retention and previous payments

Санхүү

Take the cumulative valuation, subtract what has already been certified, and apply guarantee retention at the contract percentage. The figure that leaves this step is the one the KS-3 certificate is raised for, and the backup behind it is the measure that produced it.

Дэлгэцийн зураг, 4-р алхам: Apply guarantee retention and previous payments (Санхүү, сарыг KS-2 акт болон KS-3 гэрчилгээгээр хаах)
Санхүү: Apply guarantee retention and previous payments

Яагаад: Interim payments are cumulative, so the month's money is a difference between two totals rather than a total of its own. Computing it from the cumulative figure is what stops a line being paid twice or dropped entirely when a period is re-measured.

ОролтSigned KS-2 acts to datePrevious payments and guarantee retentionҮр дүнCumulative value of worksNet due for the period
5

Issue the KS-3 certificate against the approved figure

Санхүү

Raise the KS-3 certificate against the approved KS-2 act, carrying guarantee retention and any deduction the contract provides for, and reference the KS-2 act on it. The KS-3 carries the VAT line, at twenty-two percent since January 2026, and the VAT invoice (schet-faktura), or the universal transfer document that replaces the act and the invoice together, follows within five calendar days of the KS-2 signature, because that signature is the tax point for the works.

Дэлгэцийн зураг, 5-р алхам: Issue the KS-3 certificate against the approved figure (Санхүү, сарыг KS-2 акт болон KS-3 гэрчилгээгээр хаах)
Санхүү: Issue the KS-3 certificate against the approved figure

Яагаад: A demand for a figure nobody approved is one that will be returned, and the clock does not start on a returned document. Matching it to the KS-2 act also means the accounts and the valuation tell the same story at year end without anybody reconciling them by hand.

ОролтCumulative value of worksGuarantee retention and deductionsҮр дүнKS-3 certificate issuedAmount carried into the accounts
6

Open the payment clock on the right day

Төлбөрийн цаг

Open a clock over the KS-3 certificate starting from the day the KS-2 act is signed, under 44-FZ. Payment falls due 7 working days later, and the clock records that date rather than leaving it to be worked out when somebody asks. That is the state-contract clock, and the module carries it as the Russian public procurement regime. On a private contract the Civil Code leaves the period to the parties, so open the clock on the contract's own days instead.

Яагаад: The single most expensive mistake in interim payment is starting the count on the wrong event, because every deadline behind it inherits the error and none of them look wrong. Anchoring on the day the KS-2 act is signed once makes the whole chain checkable.

ОролтKS-3 certificate and its dateContract payment termsҮр дүнOpen payment clockFinal date for payment
7

Reconcile what was certified against what was asked

Үйл явдлын тооцоо нийлүүлэлт

Put the approved figure next to the figure you asked for and carry the difference forward. What is unpaid, and how long it has been unpaid, belongs in the accounts as a number rather than in a conversation.

Яагаад: The gap between applied and certified is the health of the commercial relationship expressed as money, and it is only visible if somebody puts the two numbers side by side every period. Cumulatively it is also the single best predictor of a final account fight. The two forms are reconciled at contract close whether or not anybody reconciled them monthly, and a year of small differences is not a month of arithmetic. Doing it every period is the same work spread over the time when it is still cheap to correct.

ОролтAmount certified on the KS-3Amount accepted on the KS-2 actsҮр дүнDifference carried forwardOutstanding by age
Модулиуд

Энэ тоглолтын модулиуд

Платформын 190 модулиас 6

The market this case is written for

Орос

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • GESN/FER
  • KS-2 / KS-3

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Арилжаа ба гэрээ дахь бусад

Арилжаа ба гэрээ

Төлбөрийн хүсэлт ба тулгалт

Энэ хугацаанд хийсэн ажлыг гэрээтэй тулган үнэл, нотолгоотойгоо хамт төлбөрийн хүсэлт гарга,…

3 алхам12 минНээх