Mobilise the site and set up logistics
Get the site ready before work starts: run the mobilisation checklist for hoarding, welfare and utilities, then set the logistics plan for access, deliveries, cranes and laydown.
Как это работает, шаг за шагом
3 шагов через всю платформу - что делать на каждом и почему это важно.
Run the mobilisation checklist
Site MobilisationWork the mobilisation checklist: hoarding and security, welfare and offices, temporary power and water, signage, first aid and the statutory notices, each with an owner and a date.
Зачем: The item forgotten at mobilisation stops work later - no water for the concrete, no power for the tools. A checklist with owners and dates is what turns a chaotic start into a controlled one.
Track set-up to complete
Site MobilisationTrack each mobilisation task to done, chasing the long-lead connections and approvals that gate the site opening, until the establishment is genuinely complete.
Зачем: A utility connection can take weeks of notice. Tracking the set-up as a live list is what surfaces the item that will hold up the start while there is still time to expedite it.
Set the logistics plan
Логистика стройплощадкиSet the logistics plan: gates and access routes, delivery windows, crane and hoist positions and reach, laydown and waste areas, mapped against the busy phases of the programme.
Зачем: Space is the scarcest resource on a tight site. A logistics plan that thinks ahead to the busy weeks is what stops trades fighting over the same crane and the same gate.