Construction Contracts Act کے تحت retention money کو trust میں رکھیں

ریکارڈ کریں کہ معاہدہ آپ کو کیا روکنے دیتا ہے، اسے ایک نام والی لائن کے طور پر روکیں، اسے وہاں رکھیں جہاں ایکٹ رکھنے کا تقاضا کرتا ہے، وہ کتاب رکھیں جو ہر ذیلی ٹھیکیدار کے حصے کو قابل شناخت بنائے، جس فریق سے روکا گیا ہے اسے رپورٹ کریں اور معاہدے کی مقرر کردہ تاریخ پر جاری کریں۔

7 مراحل14 منٹجنرل کنٹریکٹرڈیولپر / کلائنٹکاسٹ کنسلٹنسی / QS فرم

یہ کیسے کام کرتا ہے، قدم بہ قدم

7 قدم پوری پلیٹ فارم میں - ہر قدم پر کیا کرنا ہے اور یہ کیوں اہم ہے۔

1

Record what the contract actually lets you retain

کنٹریکٹس

Take the retention terms off the subcontract and record them where the people who compute payments can read them: the percentage, the maximum the contract caps retention at, what event releases the first half, what event releases the balance, and the date the contract was signed or last renewed. Record as well whether this is a commercial construction contract, because the retentions regime reaches those and not a residential occupier's own contract.

کیوں: The signature date decides which version of the rules applies, and that is not a detail. Contracts entered into or renewed from 5 October 2023 sit under the automatic trust and the reporting duty the amendment introduced, while older ones sit under the lighter 2017 regime. A company running one process for a book of contracts written under both is complying with whichever one it happened to build its spreadsheet around.

اندر جاتا ہےSigned subcontractRetention terms as writtenباہر آتا ہےRetention rate and cap on recordRelease trigger and dates
2

Withhold it as a line, not as a smaller total

مالیات

When you schedule a subcontractor's payment, take the retention as a separate deduction line carrying the period it relates to and the cumulative amount now held, and let the net figure fall out of it. Stop deducting once the cumulative total reaches the contract cap rather than continuing at the percentage.

کیوں: A retention that exists only as the difference between two totals cannot be traced, and the whole regime rests on the money being identifiable as somebody else's. It is also the point at which the trust starts, so the day this line is created is the day the duties attach. A payer who cannot say which line created the trust is a payer who cannot show when the reporting clock began.

اندر جاتا ہےSubcontractor payment claimRetention rate and cap on recordباہر آتا ہےRetention shown as its own lineNet amount scheduled for payment
3

Put the money where the Act says it has to sit

ریٹینشن

Post each withheld amount to the retention ledger against the subcontractor it belongs to, and record which bank account it is held in or which complying instrument covers it. The account has to be used only for retention money, and the ledger has to name the party, the amount, the contract and the date it was withheld.

کیوں: The 2023 amendment makes this money trust money automatically, which means it is outside the reach of your own creditors if the company fails, but only to the extent it can be identified. Money mixed into the working account and spent as float is money a liquidator will treat as yours, and the subcontractors it belonged to join the queue with everyone else. Using retention money as working capital is also an offence in itself.

اندر جاتا ہےRetention shown as its own lineTrust account or complying instrumentباہر آتا ہےLedger of who holds whatBalance held per subcontractor
4

File the evidence that the money is where you say

دستاویزات

Keep the bank statement for the retention account for every period alongside the ledger it should agree with, and file the complying instrument itself where retention is covered by a guarantee or a policy rather than by cash. Keep the instrument's expiry date visible, because an expired guarantee leaves the money uncovered while the ledger still says it is fine.

کیوں: A ledger is an assertion and a bank statement is evidence, and the difference matters on the one day anyone asks. The regulator, an insolvency practitioner and a subcontractor's solicitor all ask the same question in the same order: what is held, where is it, and show me. Answering it takes minutes if the two documents were filed together each month and weeks if they were not.

اندر جاتا ہےLedger of who holds whatBank statements and instrumentباہر آتا ہےCustody evidence filedAudit trail per period
5

Tell each party what you are holding from them

خط و کتابت

Send each subcontractor a report of the retention money held from them: the amount, the date it was withheld, where it is held or what instrument covers it, and how the total moved since the last report. Do it as soon as practicable after retention is first withheld from them and then on a regular cycle of no more than three months, and keep the sent copy against the contract.

کیوں: This duty is the part of the regime most often missed, because nothing on site stops when it is skipped and no subcontractor chases a report they have never seen. It is still an obligation with an offence behind it, and the reports are also the cheapest defence there is: a party who has been told the same figure every quarter does not open the final account arguing about what was held.

اندر جاتا ہےBalance held per subcontractorReporting periodباہر آتا ہےRetention report sentProof of what was sent and when
6

Tie each release to the defects period that triggers it

وارنٹیاں اور خامیوں کی ذمہ داری

Hold each subcontractor's retention against the defects liability period it is released by: the first half at practical completion and the balance when the period ends. Where a release is being held back, record the defect it is held against, who owes the fix and by when, rather than letting the date pass in silence.

کیوں: The release trigger is not a date somebody typed in, it is the end of a period that the defects record already tracks, so keeping the two apart is how a retention gets held for a year after the obligation it secured expired. A held release with a named defect against it is a commercial position. A held release with nothing against it is trust money that should have gone back, and a subcontractor can put that straight into adjudication.

اندر جاتا ہےRelease trigger and datesDefects positionباہر آتا ہےRelease dates under watchWarning before each release
7

Reconcile the ledger against the account every period

رپورٹس

Read the total the ledger says is held against the balance the account actually carries, across every project at once, and name the difference if there is one. Do it on the same day each period rather than when somebody asks.

کیوں: A shortfall between the ledger and the account is the one number in this whole case that cannot be argued about, and it grows quietly: a release paid from the working account, a deduction never banked, a project closed without its balance moving. Found in the month it happens it is a transfer. Found at liquidation it is the evidence in somebody else's case.

اندر جاتا ہےLedger of who holds whatRetention account balanceباہر آتا ہےShortfall named if there is oneRetention position across projects
ماڈیولز

اس سیناریو کے ماڈیولز

6 / 190 پلیٹ فارم ماڈیولز

The market this case is written for

نیوزی لینڈ

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • NZS 3910
  • Construction Contracts Act

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

کمرشل اور کنٹریکٹس میں مزید

کمرشل اور کنٹریکٹس

سب کنٹریکٹر پیکج چلائیں

ٹریڈ پیکج کسی سب کنٹریکٹر کو دیں، اسے شیڈول آف ویلیوز اور ریٹینشن کے ساتھ سب کنٹریکٹ پر رکھی…

3 مراحل11 منٹکھولیں
کمرشل اور کنٹریکٹس

ادائیگی کی درخواست اور مصالحت

اس مدت میں جگہ پر لگے کام کی قیمت کنٹریکٹ کے مقابلے میں لگائیں، پیچھے ثبوت کے ساتھ درخواست ا…

3 مراحل12 منٹکھولیں