حالات عملية / الموقع والميدان
الموقع والميدان

إدارة شهر نظام حماية الأجور (WPS)

سجّل الساعات التي عملتها الفرق فعلًا، وطابِق قائمة العمالة مع سجل المنشأة، وادفع لكل عامل في حساب باسمه هو، وأرسل ملف الأجور واقرأ نتيجة الالتزام العائدة، وألزم مقاولي توريد العمالة لديك بالالتزام نفسه.

7 خطوة15 دقيقةمقاول عاممقاول باطن متخصص

كيف يعمل، خطوة بخطوة

7 خطوات عبر المنصة - ما تفعله في كل منها ولماذا يهم.

1

Capture the hours the crews actually worked

وقت الموقع

Record time by worker for the month, with the overtime separated from the normal day and the reduced Ramadan hours shown as what they are, and allocate the hours to the work they were spent on so the payroll and the cost report are built from the same record.

لماذا: The wage file has to agree with the employment contract as well as with the bank, and overtime is where the two drift apart. Time captured on site, by the person who saw the crew, is also the only defence when a worker raises a wage complaint, because the labour office will ask what was worked and paid rather than what was budgeted.

المدخلاتSite attendanceOvertime workedالمخرجاتHours per workerHours allocated to the works
2

Reconcile who is on site against who you employ

الموارد والطاقم

Match the crew on site to the establishment's own records worker by worker: the identity and residence permit details, the social insurance registration, and the bank account each wage is paid into. List the exceptions rather than paying around them, a worker on site who is registered to another establishment being the one to escalate the same day.

لقطة شاشة، الخطوة 2: Reconcile who is on site against who you employ (الموارد والطاقم, إدارة شهر نظام حماية الأجور (WPS))
الموارد والطاقم: Reconcile who is on site against who you employ

لماذا: The wage file is submitted per establishment, so a mismatch between the site and the register is not a clerical difference, it is a file that will not reconcile. It is also where two separate obligations meet: a worker whose permit has lapsed cannot lawfully work, and paying him correctly through the system does not cure that.

المدخلاتCrew list on siteEstablishment recordsالمخرجاتCrew matched to the registerExceptions to resolve
3

Run the payroll and build the wage file from it

الرواتب

Run the payroll against the contracts, with basic wage, housing and transport allowances and any deduction shown separately, and produce the wage file from the same run rather than typing it again. Wages are due monthly under the Labour Law, so the run and the file belong to the same cycle.

لماذا: A wage file keyed separately from the payroll is a file that will disagree with the payroll, usually by one leaver and one joiner. The system compares declaration against transfer, so any difference is visible to the ministry before it is visible to you, and the correction costs a month of compliance rather than an afternoon.

المدخلاتHours per workerEmployment contractsالمخرجاتPayroll runWage file prepared
4

Pay through the bank, into the worker's own account

المالية

Transfer the wages through a bank licensed in the Kingdom into an account in each worker's own name, checking the account number is a well formed Saudi IBAN of twenty four characters before the run rather than after a rejected transfer, and keep the bank confirmations against the payroll.

لقطة شاشة، الخطوة 4: Pay through the bank, into the worker's own account (المالية, إدارة شهر نظام حماية الأجور (WPS))
المالية: Pay through the bank, into the worker's own account

لماذا: The whole point of the system is that a wage reaches the worker and can be proven to have reached him. Cash on site, payment into somebody else's account or a transfer to a labour supplier who will pass it on are all outside it, however genuinely the money was intended. A single malformed account number silently drops one worker out of the month, and one unpaid worker is what a compliance percentage is measured in.

المدخلاتWage fileWorker bank accountsالمخرجاتWages transferredBank confirmations
5

Read the compliance back before the month closes

التقارير

After the file is submitted, read the result rather than assuming it: how many workers matched, which did not, and what the establishment's compliance status is now. Work the unmatched list the same week, because the fix is nearly always a wrong account number, a leaver still on the file or a wage paid outside the transfer.

لقطة شاشة، الخطوة 5: Read the compliance back before the month closes (التقارير, إدارة شهر نظام حماية الأجور (WPS))
التقارير: Read the compliance back before the month closes

لماذا: Compliance is scored monthly and the consequence is the suspension of labour services, so a bad month is felt as a hiring freeze one or two months later, by which time the cause is hard to reconstruct. Reading the result on submission turns a compliance problem into a data problem, which is the only form of it anybody can fix quickly.

المدخلاتWage file submittedBank confirmationsالمخرجاتCompliance status readUnmatched workers listed
6

Hold the labour subcontractors to the same obligation

دليل المقاولين الفرعيين

For each subcontractor supplying labour, record their establishment details and require evidence of their own wage compliance as a condition of each payment, and flag the ones whose status has slipped before you plan next month's crews around them.

لقطة شاشة، الخطوة 6: Hold the labour subcontractors to the same obligation (دليل المقاولين الفرعيين, إدارة شهر نظام حماية الأجور (WPS))
دليل المقاولين الفرعيين: Hold the labour subcontractors to the same obligation

لماذا: Their compliance failure arrives as your labour shortage. A subcontractor whose services are suspended cannot renew permits or move men, so the crew he promised for next month simply is not there, and it is far too late to price an alternative. Asking for the evidence monthly is unpopular and much cheaper than the alternative.

المدخلاتLabour subcontractorsSubcontract termsالمخرجاتCompliance declarations heldAt risk suppliers flagged
7

File the month so the chain can be walked

المستندات

Keep the month as one pack: the time records, the payroll run, the wage file as submitted, the bank confirmations and the compliance result, so any single worker can be traced from the hours he worked to the money that reached his account.

لقطة شاشة، الخطوة 7: File the month so the chain can be walked (المستندات, إدارة شهر نظام حماية الأجور (WPS))
المستندات: File the month so the chain can be walked

لماذا: Wage claims are made by individuals about single months, sometimes long after the man has left the country. A pack that lets one name be followed from attendance to transfer answers the claim in an afternoon. Records scattered across a timesheet folder, an accounts system and a bank portal turn the same question into a week of work with an uncertain ending.

المدخلاتThe month's recordsCompliance statusالمخرجاتMonth filed as one packTrail from hours to transfer
الوحدات

وحدات هذا الدليل

7 / 190 من وحدات المنصة

The market this case is written for

المملكة العربية السعودية

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • Saudi Building Code
  • Government Tenders and Procurement Law

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

المزيد في الموقع والميدان

الموقع والميدان

إدارة يوم العمل في الموقع

أغلق اليوم كما ينبغي: دوّن اليومية، وسجّل ساعات العمالة والمعدات، وارفع الصور، وسجّل ملاحظة…

4 خطوة9 دقيقةفتح
الموقع والميدان

الرد على RFI

حوّل سؤالاً من موقع العمل إلى طلب متتبَّع، ووجّهه إلى الطرف المسؤول عن الإجابة، ثم احفظ الرد…

3 خطوة9 دقيقةفتح