按工资保护系统(WPS)走完一个月

采集各班组真实的出勤工时,把班组名单与机构用工记录核对上,把每个工人的工资打进他本人名下的账户,提交工资文件并读回合规状态,并用同样的义务要求你的劳务分包商。

7 个步骤15 分钟总承包商专业分包商

运作方式,逐步说明

贯穿平台的 7 个步骤 - 每一步做什么,以及为什么重要。

1

Capture the hours the crews actually worked

现场工时

Record time by worker for the month, with the overtime separated from the normal day and the reduced Ramadan hours shown as what they are, and allocate the hours to the work they were spent on so the payroll and the cost report are built from the same record.

原因: The wage file has to agree with the employment contract as well as with the bank, and overtime is where the two drift apart. Time captured on site, by the person who saw the crew, is also the only defence when a worker raises a wage complaint, because the labour office will ask what was worked and paid rather than what was budgeted.

输入Site attendanceOvertime worked成果Hours per workerHours allocated to the works
2

Reconcile who is on site against who you employ

资源与人员

Match the crew on site to the establishment's own records worker by worker: the identity and residence permit details, the social insurance registration, and the bank account each wage is paid into. List the exceptions rather than paying around them, a worker on site who is registered to another establishment being the one to escalate the same day.

屏幕截图,步骤 2:Reconcile who is on site against who you employ (资源与人员, 按工资保护系统(WPS)走完一个月)
资源与人员: Reconcile who is on site against who you employ

原因: The wage file is submitted per establishment, so a mismatch between the site and the register is not a clerical difference, it is a file that will not reconcile. It is also where two separate obligations meet: a worker whose permit has lapsed cannot lawfully work, and paying him correctly through the system does not cure that.

输入Crew list on siteEstablishment records成果Crew matched to the registerExceptions to resolve
3

Run the payroll and build the wage file from it

薪资管理

Run the payroll against the contracts, with basic wage, housing and transport allowances and any deduction shown separately, and produce the wage file from the same run rather than typing it again. Wages are due monthly under the Labour Law, so the run and the file belong to the same cycle.

原因: A wage file keyed separately from the payroll is a file that will disagree with the payroll, usually by one leaver and one joiner. The system compares declaration against transfer, so any difference is visible to the ministry before it is visible to you, and the correction costs a month of compliance rather than an afternoon.

输入Hours per workerEmployment contracts成果Payroll runWage file prepared
4

Pay through the bank, into the worker's own account

财务

Transfer the wages through a bank licensed in the Kingdom into an account in each worker's own name, checking the account number is a well formed Saudi IBAN of twenty four characters before the run rather than after a rejected transfer, and keep the bank confirmations against the payroll.

屏幕截图,步骤 4:Pay through the bank, into the worker's own account (财务, 按工资保护系统(WPS)走完一个月)
财务: Pay through the bank, into the worker's own account

原因: The whole point of the system is that a wage reaches the worker and can be proven to have reached him. Cash on site, payment into somebody else's account or a transfer to a labour supplier who will pass it on are all outside it, however genuinely the money was intended. A single malformed account number silently drops one worker out of the month, and one unpaid worker is what a compliance percentage is measured in.

输入Wage fileWorker bank accounts成果Wages transferredBank confirmations
5

Read the compliance back before the month closes

报告

After the file is submitted, read the result rather than assuming it: how many workers matched, which did not, and what the establishment's compliance status is now. Work the unmatched list the same week, because the fix is nearly always a wrong account number, a leaver still on the file or a wage paid outside the transfer.

屏幕截图,步骤 5:Read the compliance back before the month closes (报告, 按工资保护系统(WPS)走完一个月)
报告: Read the compliance back before the month closes

原因: Compliance is scored monthly and the consequence is the suspension of labour services, so a bad month is felt as a hiring freeze one or two months later, by which time the cause is hard to reconstruct. Reading the result on submission turns a compliance problem into a data problem, which is the only form of it anybody can fix quickly.

输入Wage file submittedBank confirmations成果Compliance status readUnmatched workers listed
6

Hold the labour subcontractors to the same obligation

分包商目录

For each subcontractor supplying labour, record their establishment details and require evidence of their own wage compliance as a condition of each payment, and flag the ones whose status has slipped before you plan next month's crews around them.

屏幕截图,步骤 6:Hold the labour subcontractors to the same obligation (分包商目录, 按工资保护系统(WPS)走完一个月)
分包商目录: Hold the labour subcontractors to the same obligation

原因: Their compliance failure arrives as your labour shortage. A subcontractor whose services are suspended cannot renew permits or move men, so the crew he promised for next month simply is not there, and it is far too late to price an alternative. Asking for the evidence monthly is unpopular and much cheaper than the alternative.

输入Labour subcontractorsSubcontract terms成果Compliance declarations heldAt risk suppliers flagged
7

File the month so the chain can be walked

文档

Keep the month as one pack: the time records, the payroll run, the wage file as submitted, the bank confirmations and the compliance result, so any single worker can be traced from the hours he worked to the money that reached his account.

屏幕截图,步骤 7:File the month so the chain can be walked (文档, 按工资保护系统(WPS)走完一个月)
文档: File the month so the chain can be walked

原因: Wage claims are made by individuals about single months, sometimes long after the man has left the country. A pack that lets one name be followed from attendance to transfer answers the claim in an afternoon. Records scattered across a timesheet folder, an accounts system and a bank portal turn the same question into a week of work with an uncertain ending.

输入The month's recordsCompliance status成果Month filed as one packTrail from hours to transfer
模块

此方案使用的模块

190 个平台模块中的 7 个

The market this case is written for

沙特阿拉伯

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • Saudi Building Code
  • Government Tenders and Procurement Law

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

更多 现场与作业 案例

现场与作业

收尾现场一天的工作

妥善收尾一天的工作:记录日志、登记人工和机械工时、上传照片并记录安全观察,让这一天以可依赖的证据形式留存下来。

4 个步骤9 分钟打开
现场与作业

答复一份RFI

将现场提出的问题转化为可跟踪的请求,推动到负责给出答复的一方,并将回复归档,使其成为项目记录的一部分。

3 个步骤9 分钟打开
现场与作业

记录计工计料与时间材料

把已下达指令的额外工作转化为能获得赔付的索赔:施工发生的同时记录人工、机械和材料,当天就取得签认,再依据合同提交。

3 个步骤9 分钟打开