Wage Protection System का महीना चलाएं

टीमों ने असल में जितने घंटे काम किया वे दर्ज करें, टीम सूची का मिलान प्रतिष्ठान के रिकॉर्ड से करें, हर श्रमिक को उसके अपने नाम के खाते में भुगतान करें, वेतन फ़ाइल जमा करें और उसका अनुपालन परिणाम पढ़ें, और अपने श्रम उपठेकेदारों से भी यही दायित्व निभवाएं।

7 चरण15 मिनटमुख्य ठेकेदारविशेषज्ञ उपठेकेदार

यह कैसे काम करता है, चरण दर चरण

प्लेटफ़ॉर्म भर में 7 चरण - हर एक में आप क्या करते हैं और यह क्यों मायने रखता है।

1

Capture the hours the crews actually worked

फ़ील्ड टाइम

Record time by worker for the month, with the overtime separated from the normal day and the reduced Ramadan hours shown as what they are, and allocate the hours to the work they were spent on so the payroll and the cost report are built from the same record.

क्यों: The wage file has to agree with the employment contract as well as with the bank, and overtime is where the two drift apart. Time captured on site, by the person who saw the crew, is also the only defence when a worker raises a wage complaint, because the labour office will ask what was worked and paid rather than what was budgeted.

इनपुटSite attendanceOvertime workedपरिणामHours per workerHours allocated to the works
2

Reconcile who is on site against who you employ

संसाधन और दल

Match the crew on site to the establishment's own records worker by worker: the identity and residence permit details, the social insurance registration, and the bank account each wage is paid into. List the exceptions rather than paying around them, a worker on site who is registered to another establishment being the one to escalate the same day.

स्क्रीनशॉट, चरण 2: Reconcile who is on site against who you employ (संसाधन और दल, Wage Protection System का महीना चलाएं)
संसाधन और दल: Reconcile who is on site against who you employ

क्यों: The wage file is submitted per establishment, so a mismatch between the site and the register is not a clerical difference, it is a file that will not reconcile. It is also where two separate obligations meet: a worker whose permit has lapsed cannot lawfully work, and paying him correctly through the system does not cure that.

इनपुटCrew list on siteEstablishment recordsपरिणामCrew matched to the registerExceptions to resolve
3

Run the payroll and build the wage file from it

वेतन-पत्रक

Run the payroll against the contracts, with basic wage, housing and transport allowances and any deduction shown separately, and produce the wage file from the same run rather than typing it again. Wages are due monthly under the Labour Law, so the run and the file belong to the same cycle.

क्यों: A wage file keyed separately from the payroll is a file that will disagree with the payroll, usually by one leaver and one joiner. The system compares declaration against transfer, so any difference is visible to the ministry before it is visible to you, and the correction costs a month of compliance rather than an afternoon.

इनपुटHours per workerEmployment contractsपरिणामPayroll runWage file prepared
4

Pay through the bank, into the worker's own account

फ़ाइनेंस

Transfer the wages through a bank licensed in the Kingdom into an account in each worker's own name, checking the account number is a well formed Saudi IBAN of twenty four characters before the run rather than after a rejected transfer, and keep the bank confirmations against the payroll.

स्क्रीनशॉट, चरण 4: Pay through the bank, into the worker's own account (फ़ाइनेंस, Wage Protection System का महीना चलाएं)
फ़ाइनेंस: Pay through the bank, into the worker's own account

क्यों: The whole point of the system is that a wage reaches the worker and can be proven to have reached him. Cash on site, payment into somebody else's account or a transfer to a labour supplier who will pass it on are all outside it, however genuinely the money was intended. A single malformed account number silently drops one worker out of the month, and one unpaid worker is what a compliance percentage is measured in.

इनपुटWage fileWorker bank accountsपरिणामWages transferredBank confirmations
5

Read the compliance back before the month closes

रिपोर्ट

After the file is submitted, read the result rather than assuming it: how many workers matched, which did not, and what the establishment's compliance status is now. Work the unmatched list the same week, because the fix is nearly always a wrong account number, a leaver still on the file or a wage paid outside the transfer.

स्क्रीनशॉट, चरण 5: Read the compliance back before the month closes (रिपोर्ट, Wage Protection System का महीना चलाएं)
रिपोर्ट: Read the compliance back before the month closes

क्यों: Compliance is scored monthly and the consequence is the suspension of labour services, so a bad month is felt as a hiring freeze one or two months later, by which time the cause is hard to reconstruct. Reading the result on submission turns a compliance problem into a data problem, which is the only form of it anybody can fix quickly.

इनपुटWage file submittedBank confirmationsपरिणामCompliance status readUnmatched workers listed
6

Hold the labour subcontractors to the same obligation

उपठेकेदार निर्देशिका

For each subcontractor supplying labour, record their establishment details and require evidence of their own wage compliance as a condition of each payment, and flag the ones whose status has slipped before you plan next month's crews around them.

स्क्रीनशॉट, चरण 6: Hold the labour subcontractors to the same obligation (उपठेकेदार निर्देशिका, Wage Protection System का महीना चलाएं)
उपठेकेदार निर्देशिका: Hold the labour subcontractors to the same obligation

क्यों: Their compliance failure arrives as your labour shortage. A subcontractor whose services are suspended cannot renew permits or move men, so the crew he promised for next month simply is not there, and it is far too late to price an alternative. Asking for the evidence monthly is unpopular and much cheaper than the alternative.

इनपुटLabour subcontractorsSubcontract termsपरिणामCompliance declarations heldAt risk suppliers flagged
7

File the month so the chain can be walked

दस्तावेज़

Keep the month as one pack: the time records, the payroll run, the wage file as submitted, the bank confirmations and the compliance result, so any single worker can be traced from the hours he worked to the money that reached his account.

स्क्रीनशॉट, चरण 7: File the month so the chain can be walked (दस्तावेज़, Wage Protection System का महीना चलाएं)
दस्तावेज़: File the month so the chain can be walked

क्यों: Wage claims are made by individuals about single months, sometimes long after the man has left the country. A pack that lets one name be followed from attendance to transfer answers the claim in an afternoon. Records scattered across a timesheet folder, an accounts system and a bank portal turn the same question into a week of work with an uncertain ending.

इनपुटThe month's recordsCompliance statusपरिणामMonth filed as one packTrail from hours to transfer
मॉड्यूल

इस प्लेबुक के मॉड्यूल

प्लेटफ़ॉर्म के 190 में से 7 मॉड्यूल

The market this case is written for

सऊदी अरब

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • Saudi Building Code
  • Government Tenders and Procurement Law

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

साइट और फील्ड में और देखें

साइट और फील्ड

साइट दिन चलाएँ

दिन को सही तरीके से बंद करें: डायरी दर्ज करें, श्रम और उपकरण के घंटे बुक करें, फोटो अपलोड कर…

4 चरण9 मिनटखोलें
साइट और फील्ड

RFI का जवाब दें

साइट से आए किसी सवाल को एक ट्रैक की गई रिक्वेस्ट में बदलें, उसे जवाब देने वाले पक्ष तक पहुंच…

3 चरण9 मिनटखोलें