케이스 / 현장 및 작업
현장 및 작업

Wage Protection System 월간 업무 수행하기

작업조가 실제로 근무한 시간을 기록하고, 작업조 명단을 사업체 기록과 대조하고, 모든 근로자에게 본인 명의 계좌로 지급하고, 임금 파일을 제출한 뒤 준수 결과를 확인하고, 인력 하도급업체에도 같은 의무를 지운다.

7단계15 분종합건설사전문건설사

작동 방식, 단계별로

플랫폼 전반에 걸친 7단계 - 각 단계에서 무엇을 하는지, 그리고 왜 중요한지.

1

Capture the hours the crews actually worked

현장 시간

Record time by worker for the month, with the overtime separated from the normal day and the reduced Ramadan hours shown as what they are, and allocate the hours to the work they were spent on so the payroll and the cost report are built from the same record.

이유: The wage file has to agree with the employment contract as well as with the bank, and overtime is where the two drift apart. Time captured on site, by the person who saw the crew, is also the only defence when a worker raises a wage complaint, because the labour office will ask what was worked and paid rather than what was budgeted.

입력Site attendanceOvertime worked결과Hours per workerHours allocated to the works
2

Reconcile who is on site against who you employ

리소스 및 인력

Match the crew on site to the establishment's own records worker by worker: the identity and residence permit details, the social insurance registration, and the bank account each wage is paid into. List the exceptions rather than paying around them, a worker on site who is registered to another establishment being the one to escalate the same day.

이유: The wage file is submitted per establishment, so a mismatch between the site and the register is not a clerical difference, it is a file that will not reconcile. It is also where two separate obligations meet: a worker whose permit has lapsed cannot lawfully work, and paying him correctly through the system does not cure that.

입력Crew list on siteEstablishment records결과Crew matched to the registerExceptions to resolve
3

Run the payroll and build the wage file from it

급여 관리

Run the payroll against the contracts, with basic wage, housing and transport allowances and any deduction shown separately, and produce the wage file from the same run rather than typing it again. Wages are due monthly under the Labour Law, so the run and the file belong to the same cycle.

이유: A wage file keyed separately from the payroll is a file that will disagree with the payroll, usually by one leaver and one joiner. The system compares declaration against transfer, so any difference is visible to the ministry before it is visible to you, and the correction costs a month of compliance rather than an afternoon.

입력Hours per workerEmployment contracts결과Payroll runWage file prepared
4

Pay through the bank, into the worker's own account

재무

Transfer the wages through a bank licensed in the Kingdom into an account in each worker's own name, checking the account number is a well formed Saudi IBAN of twenty four characters before the run rather than after a rejected transfer, and keep the bank confirmations against the payroll.

이유: The whole point of the system is that a wage reaches the worker and can be proven to have reached him. Cash on site, payment into somebody else's account or a transfer to a labour supplier who will pass it on are all outside it, however genuinely the money was intended. A single malformed account number silently drops one worker out of the month, and one unpaid worker is what a compliance percentage is measured in.

입력Wage fileWorker bank accounts결과Wages transferredBank confirmations
5

Read the compliance back before the month closes

보고서

After the file is submitted, read the result rather than assuming it: how many workers matched, which did not, and what the establishment's compliance status is now. Work the unmatched list the same week, because the fix is nearly always a wrong account number, a leaver still on the file or a wage paid outside the transfer.

이유: Compliance is scored monthly and the consequence is the suspension of labour services, so a bad month is felt as a hiring freeze one or two months later, by which time the cause is hard to reconstruct. Reading the result on submission turns a compliance problem into a data problem, which is the only form of it anybody can fix quickly.

입력Wage file submittedBank confirmations결과Compliance status readUnmatched workers listed
6

Hold the labour subcontractors to the same obligation

협력업체 디렉터리

For each subcontractor supplying labour, record their establishment details and require evidence of their own wage compliance as a condition of each payment, and flag the ones whose status has slipped before you plan next month's crews around them.

이유: Their compliance failure arrives as your labour shortage. A subcontractor whose services are suspended cannot renew permits or move men, so the crew he promised for next month simply is not there, and it is far too late to price an alternative. Asking for the evidence monthly is unpopular and much cheaper than the alternative.

입력Labour subcontractorsSubcontract terms결과Compliance declarations heldAt risk suppliers flagged
7

File the month so the chain can be walked

문서

Keep the month as one pack: the time records, the payroll run, the wage file as submitted, the bank confirmations and the compliance result, so any single worker can be traced from the hours he worked to the money that reached his account.

이유: Wage claims are made by individuals about single months, sometimes long after the man has left the country. A pack that lets one name be followed from attendance to transfer answers the claim in an afternoon. Records scattered across a timesheet folder, an accounts system and a bank portal turn the same question into a week of work with an uncertain ending.

입력The month's recordsCompliance status결과Month filed as one packTrail from hours to transfer
모듈

이 플레이북의 모듈

플랫폼 190개 모듈 중 7

The market this case is written for

사우디아라비아

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • Saudi Building Code
  • Government Tenders and Procurement Law

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

현장 및 작업 카테고리의 더 보기

현장 및 작업

현장 일일 업무 진행

하루를 제대로 마무리합니다. 작업일지를 기록하고, 노무 및 장비 시간을 등록하고, 사진을 업로드하고, 안전 관찰 사항을 기록하여 그날의 기록이 나중에 근거로 활용될…

4단계9 분열기
현장 및 작업

RFI 답변하기

현장에서 나온 질문을 추적 가능한 요청으로 전환하고, 답변 책임자에게 전달하여, 회신 내용을 기록으로 남깁니다.

3단계9 분열기
현장 및 작업

실비정산(데이워크) 및 시간자재 기록

지시된 추가 작업을 지급받는 클레임으로 전환합니다: 발생 즉시 노무, 장비, 자재를 기록하고, 당일 시트에 서명을 받은 뒤 계약에 따라 제출합니다.

3단계9 분열기