ケース / 現場と作業
現場と作業

賃金保護制度(WPS)の一か月を回しきる

各班が実際に働いた時間を把握し、班の名簿を事業所の登録記録と突き合わせ、すべての労働者に本人名義の口座で支払い、賃金ファイルを提出してコンプライアンスの状態を読み戻し、労務の下請業者にも同じ義務を守らせる。

7ステップ15 分総合建設会社専門工事業者

仕組みをステップごとに

プラットフォーム全体で7ステップ - 各ステップで何をするか、そしてなぜ重要か。

1

Capture the hours the crews actually worked

現場時間

Record time by worker for the month, with the overtime separated from the normal day and the reduced Ramadan hours shown as what they are, and allocate the hours to the work they were spent on so the payroll and the cost report are built from the same record.

理由: The wage file has to agree with the employment contract as well as with the bank, and overtime is where the two drift apart. Time captured on site, by the person who saw the crew, is also the only defence when a worker raises a wage complaint, because the labour office will ask what was worked and paid rather than what was budgeted.

入力Site attendanceOvertime worked出力Hours per workerHours allocated to the works
2

Reconcile who is on site against who you employ

リソース・人員

Match the crew on site to the establishment's own records worker by worker: the identity and residence permit details, the social insurance registration, and the bank account each wage is paid into. List the exceptions rather than paying around them, a worker on site who is registered to another establishment being the one to escalate the same day.

スクリーンショット、ステップ 2: Reconcile who is on site against who you employ (リソース・人員, 賃金保護制度(WPS)の一か月を回しきる)
リソース・人員: Reconcile who is on site against who you employ

理由: The wage file is submitted per establishment, so a mismatch between the site and the register is not a clerical difference, it is a file that will not reconcile. It is also where two separate obligations meet: a worker whose permit has lapsed cannot lawfully work, and paying him correctly through the system does not cure that.

入力Crew list on siteEstablishment records出力Crew matched to the registerExceptions to resolve
3

Run the payroll and build the wage file from it

給与

Run the payroll against the contracts, with basic wage, housing and transport allowances and any deduction shown separately, and produce the wage file from the same run rather than typing it again. Wages are due monthly under the Labour Law, so the run and the file belong to the same cycle.

理由: A wage file keyed separately from the payroll is a file that will disagree with the payroll, usually by one leaver and one joiner. The system compares declaration against transfer, so any difference is visible to the ministry before it is visible to you, and the correction costs a month of compliance rather than an afternoon.

入力Hours per workerEmployment contracts出力Payroll runWage file prepared
4

Pay through the bank, into the worker's own account

財務

Transfer the wages through a bank licensed in the Kingdom into an account in each worker's own name, checking the account number is a well formed Saudi IBAN of twenty four characters before the run rather than after a rejected transfer, and keep the bank confirmations against the payroll.

スクリーンショット、ステップ 4: Pay through the bank, into the worker's own account (財務, 賃金保護制度(WPS)の一か月を回しきる)
財務: Pay through the bank, into the worker's own account

理由: The whole point of the system is that a wage reaches the worker and can be proven to have reached him. Cash on site, payment into somebody else's account or a transfer to a labour supplier who will pass it on are all outside it, however genuinely the money was intended. A single malformed account number silently drops one worker out of the month, and one unpaid worker is what a compliance percentage is measured in.

入力Wage fileWorker bank accounts出力Wages transferredBank confirmations
5

Read the compliance back before the month closes

レポート

After the file is submitted, read the result rather than assuming it: how many workers matched, which did not, and what the establishment's compliance status is now. Work the unmatched list the same week, because the fix is nearly always a wrong account number, a leaver still on the file or a wage paid outside the transfer.

スクリーンショット、ステップ 5: Read the compliance back before the month closes (レポート, 賃金保護制度(WPS)の一か月を回しきる)
レポート: Read the compliance back before the month closes

理由: Compliance is scored monthly and the consequence is the suspension of labour services, so a bad month is felt as a hiring freeze one or two months later, by which time the cause is hard to reconstruct. Reading the result on submission turns a compliance problem into a data problem, which is the only form of it anybody can fix quickly.

入力Wage file submittedBank confirmations出力Compliance status readUnmatched workers listed
6

Hold the labour subcontractors to the same obligation

下請業者一覧

For each subcontractor supplying labour, record their establishment details and require evidence of their own wage compliance as a condition of each payment, and flag the ones whose status has slipped before you plan next month's crews around them.

スクリーンショット、ステップ 6: Hold the labour subcontractors to the same obligation (下請業者一覧, 賃金保護制度(WPS)の一か月を回しきる)
下請業者一覧: Hold the labour subcontractors to the same obligation

理由: Their compliance failure arrives as your labour shortage. A subcontractor whose services are suspended cannot renew permits or move men, so the crew he promised for next month simply is not there, and it is far too late to price an alternative. Asking for the evidence monthly is unpopular and much cheaper than the alternative.

入力Labour subcontractorsSubcontract terms出力Compliance declarations heldAt risk suppliers flagged
7

File the month so the chain can be walked

文書

Keep the month as one pack: the time records, the payroll run, the wage file as submitted, the bank confirmations and the compliance result, so any single worker can be traced from the hours he worked to the money that reached his account.

スクリーンショット、ステップ 7: File the month so the chain can be walked (文書, 賃金保護制度(WPS)の一か月を回しきる)
文書: File the month so the chain can be walked

理由: Wage claims are made by individuals about single months, sometimes long after the man has left the country. A pack that lets one name be followed from attendance to transfer answers the claim in an afternoon. Records scattered across a timesheet folder, an accounts system and a bank portal turn the same question into a week of work with an uncertain ending.

入力The month's recordsCompliance status出力Month filed as one packTrail from hours to transfer
モジュール

このプレイブックのモジュール

プラットフォーム 190 モジュール中 7 個

The market this case is written for

サウジアラビア

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • Saudi Building Code
  • Government Tenders and Procurement Law

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

現場と作業の他のケース

現場と作業

現場の一日を運用する

一日をきちんと締めくくる。日報を記録し、労務・機械の稼働時間を計上し、写真をアップロードし、安全に関する所見を記録する。そうすることで、その日が根拠にできる証拠として残る。

4ステップ9 分開く
現場と作業

RFIに回答する

現場からの疑問を追跡可能な依頼に変換し、回答の責任者まで確実に届け、記録として残るように回答をファイルします。

3ステップ9 分開く